A robust heuristic for parallel machines scheduling problem with sequence-dependent setup times
Autor(a) principal: | |
---|---|
Data de Publicação: | 2017 |
Outros Autores: | |
Tipo de documento: | Artigo |
Idioma: | por |
Título da fonte: | Revista Produção Online |
Texto Completo: | https://www.producaoonline.org.br/rpo/article/view/2375 |
Resumo: | This paper addresses the problem of minimizing makespan on m-parallel machine with setup times separated of processing times of jobs and sequence-dependent. A robust and efficient heuristic was proposed and computationally implemented. Results were tested by instances generated based on works of the specific literature and compared to a model of mixed integer linear programming proposed as a lower bound for the makespan. The quality of the heuristic solution was measured by percentage deviation of lower bound. Experiments demonstrated both the solution’s efficacy, with average relative deviation of 5.51%, and computational efficiency of the heuristic, with negligible execution times. |
id |
ABEPRO-2_64d2b811ae4eb18e3067d7a85a01f0ca |
---|---|
oai_identifier_str |
oai:ojs.emnuvens.com.br:article/2375 |
network_acronym_str |
ABEPRO-2 |
network_name_str |
Revista Produção Online |
repository_id_str |
|
spelling |
A robust heuristic for parallel machines scheduling problem with sequence-dependent setup timesUma heurística robusta para programação de máquinas paralelas com tempos de setup dependentes da sequênciaScheduling. Parallel machines. Sequence-dependent setup times. Heuristic.Programação da Produção. Máquinas paralelas. Setup dependente da sequência. Heurística.This paper addresses the problem of minimizing makespan on m-parallel machine with setup times separated of processing times of jobs and sequence-dependent. A robust and efficient heuristic was proposed and computationally implemented. Results were tested by instances generated based on works of the specific literature and compared to a model of mixed integer linear programming proposed as a lower bound for the makespan. The quality of the heuristic solution was measured by percentage deviation of lower bound. Experiments demonstrated both the solution’s efficacy, with average relative deviation of 5.51%, and computational efficiency of the heuristic, with negligible execution times.O propósito deste trabalho foi elaborar uma heurística robusta e eficiente para o problema de programação de um conjunto de n tarefas com tempos de setup explícitos e dependentes da sequência em um conjunto de m máquinas de forma a minimizar o makespan (duração total da programação). Os resultados foram testados com instâncias artificiais baseadas em trabalhos publicados na literatura específica e comparados com um limitante inferior (lower bound) proposto a partir de um modelo de programação linear inteira mista. A qualidade da solução heurística foi medida com base no desvio percentual em relação ao limitante inferior. A experimentação demonstrou tanto a eficácia da solução, com desvio relativo médio de 5,51%, como a eficiência computacional da heurística, com tempos de execução desprezível.Associação Brasileira de Engenharia de Produção2017-06-14info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfaudio/mpeghttps://www.producaoonline.org.br/rpo/article/view/237510.14488/1676-1901.v17i2.2375Revista Produção Online; Vol. 17 No. 2 (2017); 463-481Revista Produção Online; v. 17 n. 2 (2017); 463-4811676-1901reponame:Revista Produção Onlineinstname:Associação Brasileira de Engenharia de Produção (ABEPRO)instacron:ABEPROporhttps://www.producaoonline.org.br/rpo/article/view/2375/1530https://www.producaoonline.org.br/rpo/article/view/2375/1531Copyright (c) 2017 Revista Produção Onlineinfo:eu-repo/semantics/openAccessMundim, Leandro ResendeFuchigami, Helio Yochihiro2017-06-14T13:16:43Zoai:ojs.emnuvens.com.br:article/2375Revistahttp://producaoonline.org.br/rpoPUBhttps://www.producaoonline.org.br/rpo/oai||producaoonline@gmail.com1676-19011676-1901opendoar:2017-06-14T13:16:43Revista Produção Online - Associação Brasileira de Engenharia de Produção (ABEPRO)false |
dc.title.none.fl_str_mv |
A robust heuristic for parallel machines scheduling problem with sequence-dependent setup times Uma heurística robusta para programação de máquinas paralelas com tempos de setup dependentes da sequência |
title |
A robust heuristic for parallel machines scheduling problem with sequence-dependent setup times |
spellingShingle |
A robust heuristic for parallel machines scheduling problem with sequence-dependent setup times Mundim, Leandro Resende Scheduling. Parallel machines. Sequence-dependent setup times. Heuristic. Programação da Produção. Máquinas paralelas. Setup dependente da sequência. Heurística. |
title_short |
A robust heuristic for parallel machines scheduling problem with sequence-dependent setup times |
title_full |
A robust heuristic for parallel machines scheduling problem with sequence-dependent setup times |
title_fullStr |
A robust heuristic for parallel machines scheduling problem with sequence-dependent setup times |
title_full_unstemmed |
A robust heuristic for parallel machines scheduling problem with sequence-dependent setup times |
title_sort |
A robust heuristic for parallel machines scheduling problem with sequence-dependent setup times |
author |
Mundim, Leandro Resende |
author_facet |
Mundim, Leandro Resende Fuchigami, Helio Yochihiro |
author_role |
author |
author2 |
Fuchigami, Helio Yochihiro |
author2_role |
author |
dc.contributor.author.fl_str_mv |
Mundim, Leandro Resende Fuchigami, Helio Yochihiro |
dc.subject.por.fl_str_mv |
Scheduling. Parallel machines. Sequence-dependent setup times. Heuristic. Programação da Produção. Máquinas paralelas. Setup dependente da sequência. Heurística. |
topic |
Scheduling. Parallel machines. Sequence-dependent setup times. Heuristic. Programação da Produção. Máquinas paralelas. Setup dependente da sequência. Heurística. |
description |
This paper addresses the problem of minimizing makespan on m-parallel machine with setup times separated of processing times of jobs and sequence-dependent. A robust and efficient heuristic was proposed and computationally implemented. Results were tested by instances generated based on works of the specific literature and compared to a model of mixed integer linear programming proposed as a lower bound for the makespan. The quality of the heuristic solution was measured by percentage deviation of lower bound. Experiments demonstrated both the solution’s efficacy, with average relative deviation of 5.51%, and computational efficiency of the heuristic, with negligible execution times. |
publishDate |
2017 |
dc.date.none.fl_str_mv |
2017-06-14 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://www.producaoonline.org.br/rpo/article/view/2375 10.14488/1676-1901.v17i2.2375 |
url |
https://www.producaoonline.org.br/rpo/article/view/2375 |
identifier_str_mv |
10.14488/1676-1901.v17i2.2375 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.relation.none.fl_str_mv |
https://www.producaoonline.org.br/rpo/article/view/2375/1530 https://www.producaoonline.org.br/rpo/article/view/2375/1531 |
dc.rights.driver.fl_str_mv |
Copyright (c) 2017 Revista Produção Online info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Copyright (c) 2017 Revista Produção Online |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf audio/mpeg |
dc.publisher.none.fl_str_mv |
Associação Brasileira de Engenharia de Produção |
publisher.none.fl_str_mv |
Associação Brasileira de Engenharia de Produção |
dc.source.none.fl_str_mv |
Revista Produção Online; Vol. 17 No. 2 (2017); 463-481 Revista Produção Online; v. 17 n. 2 (2017); 463-481 1676-1901 reponame:Revista Produção Online instname:Associação Brasileira de Engenharia de Produção (ABEPRO) instacron:ABEPRO |
instname_str |
Associação Brasileira de Engenharia de Produção (ABEPRO) |
instacron_str |
ABEPRO |
institution |
ABEPRO |
reponame_str |
Revista Produção Online |
collection |
Revista Produção Online |
repository.name.fl_str_mv |
Revista Produção Online - Associação Brasileira de Engenharia de Produção (ABEPRO) |
repository.mail.fl_str_mv |
||producaoonline@gmail.com |
_version_ |
1761536950364274688 |