Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of "Podbracan"

Detalhes bibliográficos
Autor(a) principal: Milutinovic,Aleksandar
Data de Publicação: 2015
Outros Autores: Ganic,Aleksandar, Diyab,Thamer Rayes, Tokalic,Rade, Ganic,Meri
Tipo de documento: Artigo
Idioma: eng
Título da fonte: REM. Revista Escola de Minas (Online)
Texto Completo: http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0370-44672015000300323
Resumo: Mining projects for mineral resource mining contain in certain cases specific technical and technological solutions, these being the result of the mine’s characteristic spatial position and the geometry of the ore deposit, existing mining works, structures, and terrain relief etc. For the purpose of completion of the mining project, it is necessary to carry out a series of mining and surveying tasks during the pre-project and project stage of mining, as well as during the construction of mining facilities and excavation of mineral resources. Specific features of the project concerning excavation of the remaining reserves of bauxite in the deposit of "Podbracan", and in this way the forthcoming mining and surveying works, are displayed by the integration of the underground mining project into the existing mine chambers, infrastructure structures on the terrain surface and into the open pit. Large number of mining and surveying works will follow the completion of this project, but in the meantime, this paper shows the a priory accuracy assessment of the spatial position of the point, it being the exit point to the existing bench of the open pit at the elevation +420m.
id ESCOLADEMINAS-1_5f6d000679d0c9214623c56c7b1cc7b2
oai_identifier_str oai:scielo:S0370-44672015000300323
network_acronym_str ESCOLADEMINAS-1
network_name_str REM. Revista Escola de Minas (Online)
repository_id_str
spelling Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of "Podbracan"underground miningbauxite minemine surveyinga priori accuracy assessmentMining projects for mineral resource mining contain in certain cases specific technical and technological solutions, these being the result of the mine’s characteristic spatial position and the geometry of the ore deposit, existing mining works, structures, and terrain relief etc. For the purpose of completion of the mining project, it is necessary to carry out a series of mining and surveying tasks during the pre-project and project stage of mining, as well as during the construction of mining facilities and excavation of mineral resources. Specific features of the project concerning excavation of the remaining reserves of bauxite in the deposit of "Podbracan", and in this way the forthcoming mining and surveying works, are displayed by the integration of the underground mining project into the existing mine chambers, infrastructure structures on the terrain surface and into the open pit. Large number of mining and surveying works will follow the completion of this project, but in the meantime, this paper shows the a priory accuracy assessment of the spatial position of the point, it being the exit point to the existing bench of the open pit at the elevation +420m.Escola de Minas2015-09-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersiontext/htmlhttp://old.scielo.br/scielo.php?script=sci_arttext&pid=S0370-44672015000300323Rem: Revista Escola de Minas v.68 n.3 2015reponame:REM. Revista Escola de Minas (Online)instname:Escola de Minasinstacron:ESCOLA DE MINAS10.1590/0370-44672014680100info:eu-repo/semantics/openAccessMilutinovic,AleksandarGanic,AleksandarDiyab,Thamer RayesTokalic,RadeGanic,Merieng2015-09-02T00:00:00Zoai:scielo:S0370-44672015000300323Revistahttp://www.scielo.br/remhttps://old.scielo.br/oai/scielo-oai.phpeditor@rem.com.br1807-03530370-4467opendoar:2015-09-02T00:00REM. Revista Escola de Minas (Online) - Escola de Minasfalse
dc.title.none.fl_str_mv Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of "Podbracan"
title Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of "Podbracan"
spellingShingle Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of "Podbracan"
Milutinovic,Aleksandar
underground mining
bauxite mine
mine surveying
a priori accuracy assessment
title_short Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of "Podbracan"
title_full Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of "Podbracan"
title_fullStr Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of "Podbracan"
title_full_unstemmed Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of "Podbracan"
title_sort Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of "Podbracan"
author Milutinovic,Aleksandar
author_facet Milutinovic,Aleksandar
Ganic,Aleksandar
Diyab,Thamer Rayes
Tokalic,Rade
Ganic,Meri
author_role author
author2 Ganic,Aleksandar
Diyab,Thamer Rayes
Tokalic,Rade
Ganic,Meri
author2_role author
author
author
author
dc.contributor.author.fl_str_mv Milutinovic,Aleksandar
Ganic,Aleksandar
Diyab,Thamer Rayes
Tokalic,Rade
Ganic,Meri
dc.subject.por.fl_str_mv underground mining
bauxite mine
mine surveying
a priori accuracy assessment
topic underground mining
bauxite mine
mine surveying
a priori accuracy assessment
description Mining projects for mineral resource mining contain in certain cases specific technical and technological solutions, these being the result of the mine’s characteristic spatial position and the geometry of the ore deposit, existing mining works, structures, and terrain relief etc. For the purpose of completion of the mining project, it is necessary to carry out a series of mining and surveying tasks during the pre-project and project stage of mining, as well as during the construction of mining facilities and excavation of mineral resources. Specific features of the project concerning excavation of the remaining reserves of bauxite in the deposit of "Podbracan", and in this way the forthcoming mining and surveying works, are displayed by the integration of the underground mining project into the existing mine chambers, infrastructure structures on the terrain surface and into the open pit. Large number of mining and surveying works will follow the completion of this project, but in the meantime, this paper shows the a priory accuracy assessment of the spatial position of the point, it being the exit point to the existing bench of the open pit at the elevation +420m.
publishDate 2015
dc.date.none.fl_str_mv 2015-09-01
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0370-44672015000300323
url http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0370-44672015000300323
dc.language.iso.fl_str_mv eng
language eng
dc.relation.none.fl_str_mv 10.1590/0370-44672014680100
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv text/html
dc.publisher.none.fl_str_mv Escola de Minas
publisher.none.fl_str_mv Escola de Minas
dc.source.none.fl_str_mv Rem: Revista Escola de Minas v.68 n.3 2015
reponame:REM. Revista Escola de Minas (Online)
instname:Escola de Minas
instacron:ESCOLA DE MINAS
instname_str Escola de Minas
instacron_str ESCOLA DE MINAS
institution ESCOLA DE MINAS
reponame_str REM. Revista Escola de Minas (Online)
collection REM. Revista Escola de Minas (Online)
repository.name.fl_str_mv REM. Revista Escola de Minas (Online) - Escola de Minas
repository.mail.fl_str_mv editor@rem.com.br
_version_ 1754122199027941376