Grade uncertainty embedded in long term scheduling: stochastic mine planning
Autor(a) principal: | |
---|---|
Data de Publicação: | 2019 |
Outros Autores: | , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | REM - International Engineering Journal |
Texto Completo: | http://old.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2019000300275 |
Resumo: | Abstract The inclusion of grade uncertainty for multivariate mineral deposits is of great importance for the correct management of subsequent decisions involved in mining planning. Mapping grade uncertainties allows maximization of profit and resource extraction. In this article, the co-simulation turning band algorithm is applied with the aim of predicting multivariate grade uncertainties. Moreover, a probabilistic analysis in long term mining sequencing is proposed in order to select the best given grade scheduling uncertainty derived from the simulations. A case study in a phosphate mine shows that the correlation of co-simulated variables honors the original data and there is an improvement in the project by an increase in Net Present Value (NPV) planning considering grade uncertainties. A comparison is performed with the results derived from the selected schedule and the results using the model based on kriged grades. |
id |
FG-1_a112655347946b3f67c76aad893da080 |
---|---|
oai_identifier_str |
oai:scielo:S2448-167X2019000300275 |
network_acronym_str |
FG-1 |
network_name_str |
REM - International Engineering Journal |
repository_id_str |
|
spelling |
Grade uncertainty embedded in long term scheduling: stochastic mine planninggrade uncertaintyturning bands co-simulationmine schedulingAbstract The inclusion of grade uncertainty for multivariate mineral deposits is of great importance for the correct management of subsequent decisions involved in mining planning. Mapping grade uncertainties allows maximization of profit and resource extraction. In this article, the co-simulation turning band algorithm is applied with the aim of predicting multivariate grade uncertainties. Moreover, a probabilistic analysis in long term mining sequencing is proposed in order to select the best given grade scheduling uncertainty derived from the simulations. A case study in a phosphate mine shows that the correlation of co-simulated variables honors the original data and there is an improvement in the project by an increase in Net Present Value (NPV) planning considering grade uncertainties. A comparison is performed with the results derived from the selected schedule and the results using the model based on kriged grades.Fundação Gorceix2019-06-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersiontext/htmlhttp://old.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2019000300275REM - International Engineering Journal v.72 n.2 2019reponame:REM - International Engineering Journalinstname:Fundação Gorceix (FG)instacron:FG10.1590/0370-44672018720119info:eu-repo/semantics/openAccessCherchenevski,Pablo KouryCosta,João Felipe Coimbra LeiteRubio,Ricardo Hundelshausseneng2019-03-19T00:00:00Zoai:scielo:S2448-167X2019000300275Revistahttps://www.rem.com.br/?lang=pt-brPRIhttps://old.scielo.br/oai/scielo-oai.php||editor@rem.com.br2448-167X2448-167Xopendoar:2019-03-19T00:00REM - International Engineering Journal - Fundação Gorceix (FG)false |
dc.title.none.fl_str_mv |
Grade uncertainty embedded in long term scheduling: stochastic mine planning |
title |
Grade uncertainty embedded in long term scheduling: stochastic mine planning |
spellingShingle |
Grade uncertainty embedded in long term scheduling: stochastic mine planning Cherchenevski,Pablo Koury grade uncertainty turning bands co-simulation mine scheduling |
title_short |
Grade uncertainty embedded in long term scheduling: stochastic mine planning |
title_full |
Grade uncertainty embedded in long term scheduling: stochastic mine planning |
title_fullStr |
Grade uncertainty embedded in long term scheduling: stochastic mine planning |
title_full_unstemmed |
Grade uncertainty embedded in long term scheduling: stochastic mine planning |
title_sort |
Grade uncertainty embedded in long term scheduling: stochastic mine planning |
author |
Cherchenevski,Pablo Koury |
author_facet |
Cherchenevski,Pablo Koury Costa,João Felipe Coimbra Leite Rubio,Ricardo Hundelshaussen |
author_role |
author |
author2 |
Costa,João Felipe Coimbra Leite Rubio,Ricardo Hundelshaussen |
author2_role |
author author |
dc.contributor.author.fl_str_mv |
Cherchenevski,Pablo Koury Costa,João Felipe Coimbra Leite Rubio,Ricardo Hundelshaussen |
dc.subject.por.fl_str_mv |
grade uncertainty turning bands co-simulation mine scheduling |
topic |
grade uncertainty turning bands co-simulation mine scheduling |
description |
Abstract The inclusion of grade uncertainty for multivariate mineral deposits is of great importance for the correct management of subsequent decisions involved in mining planning. Mapping grade uncertainties allows maximization of profit and resource extraction. In this article, the co-simulation turning band algorithm is applied with the aim of predicting multivariate grade uncertainties. Moreover, a probabilistic analysis in long term mining sequencing is proposed in order to select the best given grade scheduling uncertainty derived from the simulations. A case study in a phosphate mine shows that the correlation of co-simulated variables honors the original data and there is an improvement in the project by an increase in Net Present Value (NPV) planning considering grade uncertainties. A comparison is performed with the results derived from the selected schedule and the results using the model based on kriged grades. |
publishDate |
2019 |
dc.date.none.fl_str_mv |
2019-06-01 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://old.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2019000300275 |
url |
http://old.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2019000300275 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
10.1590/0370-44672018720119 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
text/html |
dc.publisher.none.fl_str_mv |
Fundação Gorceix |
publisher.none.fl_str_mv |
Fundação Gorceix |
dc.source.none.fl_str_mv |
REM - International Engineering Journal v.72 n.2 2019 reponame:REM - International Engineering Journal instname:Fundação Gorceix (FG) instacron:FG |
instname_str |
Fundação Gorceix (FG) |
instacron_str |
FG |
institution |
FG |
reponame_str |
REM - International Engineering Journal |
collection |
REM - International Engineering Journal |
repository.name.fl_str_mv |
REM - International Engineering Journal - Fundação Gorceix (FG) |
repository.mail.fl_str_mv |
||editor@rem.com.br |
_version_ |
1754734691364110336 |