Removal of organic matter and nitrogen in a HSSF constructed wetland under transient loads

Detalhes bibliográficos
Autor(a) principal: Albuquerque, Antonio
Data de Publicação: 2009
Outros Autores: Arendacz, M., Gajewska, M., Obarska-Pempkowiak, H., Randerson, Peter, Kowalik, P.
Tipo de documento: Artigo
Idioma: eng
Título da fonte: Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
Texto Completo: http://hdl.handle.net/10400.6/1324
Resumo: A monitoring campaign in a horizontal subsurface flow constructed wetland under the influence of transient loads of flow-rate, organic matter, nitrogen and suspended solids showed an irregular removal of COD and TSS and lower both removal efficiencies and mass removal rates than the ones observed in other studies for similar operating conditions. This circumstance is associated to the presence of large amount of particulate organic matter from non-point sources. The mass removal rate of ammonia increased 39% as both the water and soil temperatures increased from weeks 1–8 to weeks 9–14. A good correlation between mass load and mass removal rate was observed for all measured parameters, which attests a satisfactory response of the bed under to transient load.
id RCAP_66ff6147ca242dcec5b4fb1a9bbcc478
oai_identifier_str oai:ubibliorum.ubi.pt:10400.6/1324
network_acronym_str RCAP
network_name_str Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
repository_id_str
spelling Removal of organic matter and nitrogen in a HSSF constructed wetland under transient loadsConstructed wetlandsNitrogen removalOrganic matter removalTransient loadsA monitoring campaign in a horizontal subsurface flow constructed wetland under the influence of transient loads of flow-rate, organic matter, nitrogen and suspended solids showed an irregular removal of COD and TSS and lower both removal efficiencies and mass removal rates than the ones observed in other studies for similar operating conditions. This circumstance is associated to the presence of large amount of particulate organic matter from non-point sources. The mass removal rate of ammonia increased 39% as both the water and soil temperatures increased from weeks 1–8 to weeks 9–14. A good correlation between mass load and mass removal rate was observed for all measured parameters, which attests a satisfactory response of the bed under to transient load.IWAuBibliorumAlbuquerque, AntonioArendacz, M.Gajewska, M.Obarska-Pempkowiak, H.Randerson, PeterKowalik, P.2013-09-06T18:34:50Z20092009-01-01T00:00:00Zinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleapplication/pdfhttp://hdl.handle.net/10400.6/1324engALBUQUERQUE A., ARENDACZ M., GAJEWSKA M., OBARSKA–PEMPKOWIAK H., RANDERSON P. e KOWALIK (2009). Removal of organic matter and nitrogen in a HSSF constructed wetland under transient loads. Water Science and Technology, 60(7), 1677–1682.0273-1223info:eu-repo/semantics/openAccessreponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãoinstacron:RCAAP2023-01-16T11:38:29ZPortal AgregadorONG
dc.title.none.fl_str_mv Removal of organic matter and nitrogen in a HSSF constructed wetland under transient loads
title Removal of organic matter and nitrogen in a HSSF constructed wetland under transient loads
spellingShingle Removal of organic matter and nitrogen in a HSSF constructed wetland under transient loads
Albuquerque, Antonio
Constructed wetlands
Nitrogen removal
Organic matter removal
Transient loads
title_short Removal of organic matter and nitrogen in a HSSF constructed wetland under transient loads
title_full Removal of organic matter and nitrogen in a HSSF constructed wetland under transient loads
title_fullStr Removal of organic matter and nitrogen in a HSSF constructed wetland under transient loads
title_full_unstemmed Removal of organic matter and nitrogen in a HSSF constructed wetland under transient loads
title_sort Removal of organic matter and nitrogen in a HSSF constructed wetland under transient loads
author Albuquerque, Antonio
author_facet Albuquerque, Antonio
Arendacz, M.
Gajewska, M.
Obarska-Pempkowiak, H.
Randerson, Peter
Kowalik, P.
author_role author
author2 Arendacz, M.
Gajewska, M.
Obarska-Pempkowiak, H.
Randerson, Peter
Kowalik, P.
author2_role author
author
author
author
author
dc.contributor.none.fl_str_mv uBibliorum
dc.contributor.author.fl_str_mv Albuquerque, Antonio
Arendacz, M.
Gajewska, M.
Obarska-Pempkowiak, H.
Randerson, Peter
Kowalik, P.
dc.subject.por.fl_str_mv Constructed wetlands
Nitrogen removal
Organic matter removal
Transient loads
topic Constructed wetlands
Nitrogen removal
Organic matter removal
Transient loads
description A monitoring campaign in a horizontal subsurface flow constructed wetland under the influence of transient loads of flow-rate, organic matter, nitrogen and suspended solids showed an irregular removal of COD and TSS and lower both removal efficiencies and mass removal rates than the ones observed in other studies for similar operating conditions. This circumstance is associated to the presence of large amount of particulate organic matter from non-point sources. The mass removal rate of ammonia increased 39% as both the water and soil temperatures increased from weeks 1–8 to weeks 9–14. A good correlation between mass load and mass removal rate was observed for all measured parameters, which attests a satisfactory response of the bed under to transient load.
publishDate 2009
dc.date.none.fl_str_mv 2009
2009-01-01T00:00:00Z
2013-09-06T18:34:50Z
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://hdl.handle.net/10400.6/1324
url http://hdl.handle.net/10400.6/1324
dc.language.iso.fl_str_mv eng
language eng
dc.relation.none.fl_str_mv ALBUQUERQUE A., ARENDACZ M., GAJEWSKA M., OBARSKA–PEMPKOWIAK H., RANDERSON P. e KOWALIK (2009). Removal of organic matter and nitrogen in a HSSF constructed wetland under transient loads. Water Science and Technology, 60(7), 1677–1682.
0273-1223
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv IWA
publisher.none.fl_str_mv IWA
dc.source.none.fl_str_mv reponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação
instacron:RCAAP
instname_str Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação
instacron_str RCAAP
institution RCAAP
reponame_str Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
collection Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
repository.name.fl_str_mv
repository.mail.fl_str_mv
_version_ 1777301761116078080