PSCPF: planning, scheduling and control of patient flow

Detalhes bibliográficos
Autor(a) principal: Souza,Thiago A.
Data de Publicação: 2021
Outros Autores: Vaccaro,Guilherme L. R., Lima,Rui M.
Tipo de documento: Artigo
Idioma: eng
Título da fonte: Production
Texto Completo: http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0103-65132021000100210
Resumo: Abstract Paper aims Lack of operational planning in healthcare organizations may result in service disconnection and reduced value per effort to the patient. Production Planning, Scheduling and Control assists in determining “what,” “how much,” “when” and “where” to deliver, which may be of great relevance to healthcare services. This study proposes a structural framework and analyzes the implementation of PPSC concepts in OR management. Originality The application of concepts from manufacturing applied to healthcare as the PPSC, present in this text, demonstrates the crossing and alignment of global management techniques and tools applicable to both areas. Research method The discussion is based on data gathered through action-research in a Brazilian public hospital. Main findings In the hospital under study, the PSCPF implementation resulted in increased production control of surgeries, increased efficiency in management of waiting lists, increased operational efficiency, and motivational gains from staff integration. Implications for theory and practice The understanding and proper implementation of the concept of PPSC contributed to mitigate problems related to capacity management, reduced the unawareness of different levels of demand and waiting lists, cut down scheduling errors, and prevented the provision of false information from the disconnection between the various areas of the hospital.
id ABEPRO-1_5c69b02d012a46a9cb082d1aa5a49ab4
oai_identifier_str oai:scielo:S0103-65132021000100210
network_acronym_str ABEPRO-1
network_name_str Production
repository_id_str
spelling PSCPF: planning, scheduling and control of patient flowHealthcare managementLean healthcareProduction planning and controlPatient flowOperating roomAbstract Paper aims Lack of operational planning in healthcare organizations may result in service disconnection and reduced value per effort to the patient. Production Planning, Scheduling and Control assists in determining “what,” “how much,” “when” and “where” to deliver, which may be of great relevance to healthcare services. This study proposes a structural framework and analyzes the implementation of PPSC concepts in OR management. Originality The application of concepts from manufacturing applied to healthcare as the PPSC, present in this text, demonstrates the crossing and alignment of global management techniques and tools applicable to both areas. Research method The discussion is based on data gathered through action-research in a Brazilian public hospital. Main findings In the hospital under study, the PSCPF implementation resulted in increased production control of surgeries, increased efficiency in management of waiting lists, increased operational efficiency, and motivational gains from staff integration. Implications for theory and practice The understanding and proper implementation of the concept of PPSC contributed to mitigate problems related to capacity management, reduced the unawareness of different levels of demand and waiting lists, cut down scheduling errors, and prevented the provision of false information from the disconnection between the various areas of the hospital.Associação Brasileira de Engenharia de Produção2021-01-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersiontext/htmlhttp://old.scielo.br/scielo.php?script=sci_arttext&pid=S0103-65132021000100210Production v.31 2021reponame:Productioninstname:Associação Brasileira de Engenharia de Produção (ABEPRO)instacron:ABEPRO10.1590/0103-6513.20200006info:eu-repo/semantics/openAccessSouza,Thiago A.Vaccaro,Guilherme L. R.Lima,Rui M.eng2021-06-09T00:00:00Zoai:scielo:S0103-65132021000100210Revistahttps://www.scielo.br/j/prod/https://old.scielo.br/oai/scielo-oai.php||production@editoracubo.com.br1980-54110103-6513opendoar:2021-06-09T00:00Production - Associação Brasileira de Engenharia de Produção (ABEPRO)false
dc.title.none.fl_str_mv PSCPF: planning, scheduling and control of patient flow
title PSCPF: planning, scheduling and control of patient flow
spellingShingle PSCPF: planning, scheduling and control of patient flow
Souza,Thiago A.
Healthcare management
Lean healthcare
Production planning and control
Patient flow
Operating room
title_short PSCPF: planning, scheduling and control of patient flow
title_full PSCPF: planning, scheduling and control of patient flow
title_fullStr PSCPF: planning, scheduling and control of patient flow
title_full_unstemmed PSCPF: planning, scheduling and control of patient flow
title_sort PSCPF: planning, scheduling and control of patient flow
author Souza,Thiago A.
author_facet Souza,Thiago A.
Vaccaro,Guilherme L. R.
Lima,Rui M.
author_role author
author2 Vaccaro,Guilherme L. R.
Lima,Rui M.
author2_role author
author
dc.contributor.author.fl_str_mv Souza,Thiago A.
Vaccaro,Guilherme L. R.
Lima,Rui M.
dc.subject.por.fl_str_mv Healthcare management
Lean healthcare
Production planning and control
Patient flow
Operating room
topic Healthcare management
Lean healthcare
Production planning and control
Patient flow
Operating room
description Abstract Paper aims Lack of operational planning in healthcare organizations may result in service disconnection and reduced value per effort to the patient. Production Planning, Scheduling and Control assists in determining “what,” “how much,” “when” and “where” to deliver, which may be of great relevance to healthcare services. This study proposes a structural framework and analyzes the implementation of PPSC concepts in OR management. Originality The application of concepts from manufacturing applied to healthcare as the PPSC, present in this text, demonstrates the crossing and alignment of global management techniques and tools applicable to both areas. Research method The discussion is based on data gathered through action-research in a Brazilian public hospital. Main findings In the hospital under study, the PSCPF implementation resulted in increased production control of surgeries, increased efficiency in management of waiting lists, increased operational efficiency, and motivational gains from staff integration. Implications for theory and practice The understanding and proper implementation of the concept of PPSC contributed to mitigate problems related to capacity management, reduced the unawareness of different levels of demand and waiting lists, cut down scheduling errors, and prevented the provision of false information from the disconnection between the various areas of the hospital.
publishDate 2021
dc.date.none.fl_str_mv 2021-01-01
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0103-65132021000100210
url http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0103-65132021000100210
dc.language.iso.fl_str_mv eng
language eng
dc.relation.none.fl_str_mv 10.1590/0103-6513.20200006
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv text/html
dc.publisher.none.fl_str_mv Associação Brasileira de Engenharia de Produção
publisher.none.fl_str_mv Associação Brasileira de Engenharia de Produção
dc.source.none.fl_str_mv Production v.31 2021
reponame:Production
instname:Associação Brasileira de Engenharia de Produção (ABEPRO)
instacron:ABEPRO
instname_str Associação Brasileira de Engenharia de Produção (ABEPRO)
instacron_str ABEPRO
institution ABEPRO
reponame_str Production
collection Production
repository.name.fl_str_mv Production - Associação Brasileira de Engenharia de Produção (ABEPRO)
repository.mail.fl_str_mv ||production@editoracubo.com.br
_version_ 1754213154795028480