Setup time reduction in pvc boots production through smed technique
Autor(a) principal: | |
---|---|
Data de Publicação: | 2012 |
Outros Autores: | , |
Tipo de documento: | Artigo |
Idioma: | por |
Título da fonte: | Revista Produção Online |
Texto Completo: | https://www.producaoonline.org.br/rpo/article/view/770 |
Resumo: | The competition imposed by the market requires of the organizations the continuous improvement of its processes, products and offered services, with lower production costs. This article addresses this issue describing the resulting improvements from the implementation of Single Minute Exchange of Die (SMED) in the process of exchange the mold of the injection machine of PVC during the boots manufacturing. The case study was conducted in a large company of footwear, located in the state of Paraiba. In order to find the best alternative to the problem of the setup of the molds, were used the SMED and the methodology for problem resolution, and then was implemented the solution that generated greater productivity for the company. Among the improvements made, we should emphasize the reduction of inactive time of 11.56 minutes to 5 minutes, reducing the time needed for the adjustments of the molds with the implementation of guides for centering and shims to standardize the heights of the molds. |
id |
ABEPRO-2_4ff6f68fbdf914d71342a6713bf3f565 |
---|---|
oai_identifier_str |
oai:ojs.emnuvens.com.br:article/770 |
network_acronym_str |
ABEPRO-2 |
network_name_str |
Revista Produção Online |
repository_id_str |
|
spelling |
Setup time reduction in pvc boots production through smed techniqueRedução do tempo de setup na produção de botas de pvc através da técnica TRFThe competition imposed by the market requires of the organizations the continuous improvement of its processes, products and offered services, with lower production costs. This article addresses this issue describing the resulting improvements from the implementation of Single Minute Exchange of Die (SMED) in the process of exchange the mold of the injection machine of PVC during the boots manufacturing. The case study was conducted in a large company of footwear, located in the state of Paraiba. In order to find the best alternative to the problem of the setup of the molds, were used the SMED and the methodology for problem resolution, and then was implemented the solution that generated greater productivity for the company. Among the improvements made, we should emphasize the reduction of inactive time of 11.56 minutes to 5 minutes, reducing the time needed for the adjustments of the molds with the implementation of guides for centering and shims to standardize the heights of the molds.A competitividade imposta pelo mercado exige das organizações melhoria contínua de seus processos, produtos e serviços oferecidos, com menores custos de produção. Este artigo aborda este tema ao descrever as melhorias advindas com a implementação da Troca Rápida de Ferramentas (TRF), no processo de troca de molde da máquina injetora de PVC na fabricação de botas. O estudo de caso foi realizado numa empresa do ramo de calçados de grande porte, localizada no estado da Paraíba. No intuito de encontrar a melhor alternativa para o problema de setup elevado, foram utilizadas a TRF e a metodologia de resolução de problemas, sendo então implementada a solução que gerou maior produtividade para a empresa. Dentre as melhorias obtidas, merecem destaque a redução do tempo de máquina parada de 11,56 para 5 minutos, a redução do tempo de ajustes dos moldes com a implantação de guias de centragem e calços para padronizar as alturas dos moldes.Associação Brasileira de Engenharia de Produção2012-03-07info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfaudio/mpeghttps://www.producaoonline.org.br/rpo/article/view/77010.14488/1676-1901.v12i1.770Revista Produção Online; Vol. 12 No. 1 (2012); 119-132Revista Produção Online; v. 12 n. 1 (2012); 119-1321676-1901reponame:Revista Produção Onlineinstname:Associação Brasileira de Engenharia de Produção (ABEPRO)instacron:ABEPROporhttps://www.producaoonline.org.br/rpo/article/view/770/867https://www.producaoonline.org.br/rpo/article/view/770/882Copyright (c) 2014 Revista Produção Onlineinfo:eu-repo/semantics/openAccessda Costa, Amanda HerculanoGomes de Lima, Jeane de FátimaBarreto Gomes, Maria de Lourdes2015-11-11T17:25:51Zoai:ojs.emnuvens.com.br:article/770Revistahttp://producaoonline.org.br/rpoPUBhttps://www.producaoonline.org.br/rpo/oai||producaoonline@gmail.com1676-19011676-1901opendoar:2015-11-11T17:25:51Revista Produção Online - Associação Brasileira de Engenharia de Produção (ABEPRO)false |
dc.title.none.fl_str_mv |
Setup time reduction in pvc boots production through smed technique Redução do tempo de setup na produção de botas de pvc através da técnica TRF |
title |
Setup time reduction in pvc boots production through smed technique |
spellingShingle |
Setup time reduction in pvc boots production through smed technique da Costa, Amanda Herculano |
title_short |
Setup time reduction in pvc boots production through smed technique |
title_full |
Setup time reduction in pvc boots production through smed technique |
title_fullStr |
Setup time reduction in pvc boots production through smed technique |
title_full_unstemmed |
Setup time reduction in pvc boots production through smed technique |
title_sort |
Setup time reduction in pvc boots production through smed technique |
author |
da Costa, Amanda Herculano |
author_facet |
da Costa, Amanda Herculano Gomes de Lima, Jeane de Fátima Barreto Gomes, Maria de Lourdes |
author_role |
author |
author2 |
Gomes de Lima, Jeane de Fátima Barreto Gomes, Maria de Lourdes |
author2_role |
author author |
dc.contributor.author.fl_str_mv |
da Costa, Amanda Herculano Gomes de Lima, Jeane de Fátima Barreto Gomes, Maria de Lourdes |
description |
The competition imposed by the market requires of the organizations the continuous improvement of its processes, products and offered services, with lower production costs. This article addresses this issue describing the resulting improvements from the implementation of Single Minute Exchange of Die (SMED) in the process of exchange the mold of the injection machine of PVC during the boots manufacturing. The case study was conducted in a large company of footwear, located in the state of Paraiba. In order to find the best alternative to the problem of the setup of the molds, were used the SMED and the methodology for problem resolution, and then was implemented the solution that generated greater productivity for the company. Among the improvements made, we should emphasize the reduction of inactive time of 11.56 minutes to 5 minutes, reducing the time needed for the adjustments of the molds with the implementation of guides for centering and shims to standardize the heights of the molds. |
publishDate |
2012 |
dc.date.none.fl_str_mv |
2012-03-07 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://www.producaoonline.org.br/rpo/article/view/770 10.14488/1676-1901.v12i1.770 |
url |
https://www.producaoonline.org.br/rpo/article/view/770 |
identifier_str_mv |
10.14488/1676-1901.v12i1.770 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.relation.none.fl_str_mv |
https://www.producaoonline.org.br/rpo/article/view/770/867 https://www.producaoonline.org.br/rpo/article/view/770/882 |
dc.rights.driver.fl_str_mv |
Copyright (c) 2014 Revista Produção Online info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Copyright (c) 2014 Revista Produção Online |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf audio/mpeg |
dc.publisher.none.fl_str_mv |
Associação Brasileira de Engenharia de Produção |
publisher.none.fl_str_mv |
Associação Brasileira de Engenharia de Produção |
dc.source.none.fl_str_mv |
Revista Produção Online; Vol. 12 No. 1 (2012); 119-132 Revista Produção Online; v. 12 n. 1 (2012); 119-132 1676-1901 reponame:Revista Produção Online instname:Associação Brasileira de Engenharia de Produção (ABEPRO) instacron:ABEPRO |
instname_str |
Associação Brasileira de Engenharia de Produção (ABEPRO) |
instacron_str |
ABEPRO |
institution |
ABEPRO |
reponame_str |
Revista Produção Online |
collection |
Revista Produção Online |
repository.name.fl_str_mv |
Revista Produção Online - Associação Brasileira de Engenharia de Produção (ABEPRO) |
repository.mail.fl_str_mv |
||producaoonline@gmail.com |
_version_ |
1761536948224131072 |