Heuristics methods for the flow shop scheduling problem with separated setup times
Autor(a) principal: | |
---|---|
Data de Publicação: | 2012 |
Outros Autores: | |
Tipo de documento: | Artigo |
Idioma: | por |
Título da fonte: | Revista Produção Online |
Texto Completo: | https://www.producaoonline.org.br/rpo/article/view/939 |
Resumo: | This paper deals with the permutation flow shop scheduling problem with separated machine setup times. As a result of an investigation on the problem characteristics, four heuristics methods are proposed with procedures of the construction sequencing solution by an analogy with the asymmetric traveling salesman problem with the objective of minimizing makespan. Experimental results show that one of the new heuristics methods proposed provide high quality solutions in comparisons with the evaluated methods considered in the literature. |
id |
ABEPRO-2_cf68762a9a716802c10a435ea8566804 |
---|---|
oai_identifier_str |
oai:ojs.emnuvens.com.br:article/939 |
network_acronym_str |
ABEPRO-2 |
network_name_str |
Revista Produção Online |
repository_id_str |
|
spelling |
Heuristics methods for the flow shop scheduling problem with separated setup timesMétodos heurísticos para o problema de programação flow shop com tempos de setup separadosProduction scheduling. Permutation flow shop. Setup times. Heuristic method. MakespanProgramação da produção. Flow shop permutacional. Tempos de setup. Método heurístico. Duração total da programação.This paper deals with the permutation flow shop scheduling problem with separated machine setup times. As a result of an investigation on the problem characteristics, four heuristics methods are proposed with procedures of the construction sequencing solution by an analogy with the asymmetric traveling salesman problem with the objective of minimizing makespan. Experimental results show that one of the new heuristics methods proposed provide high quality solutions in comparisons with the evaluated methods considered in the literature.Neste artigo apresentam-se métodos heurísticos para o problema de programação da produção flow shop permutacional com tempos de setup das máquinas separados dos tempos de processamento das tarefas. A partir de investigações das características do problema, quatro métodos heurísticos foram propostos com procedimentos de construção da seqüência de solução em analogia com o problema assimétrico do caixeiro-viajante, tendo como objetivo a minimização da duração total da programação da produção. Os resultados da experimentação computacional mostraram que um dos novos métodos heurísticos propostos obtém soluções de alta qualidade em comparação com os métodos avaliados considerados na literatura.Associação Brasileira de Engenharia de Produção2012-06-13info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfaudio/mpeghttps://www.producaoonline.org.br/rpo/article/view/93910.14488/1676-1901.v12i2.939Revista Produção Online; Vol. 12 No. 2 (2012); 499-521Revista Produção Online; v. 12 n. 2 (2012); 499-5211676-1901reponame:Revista Produção Onlineinstname:Associação Brasileira de Engenharia de Produção (ABEPRO)instacron:ABEPROporhttps://www.producaoonline.org.br/rpo/article/view/939/916https://www.producaoonline.org.br/rpo/article/view/939/904Copyright (c) 2014 Revista Produção Onlineinfo:eu-repo/semantics/openAccessNagano, Marcelo SeidoMesquita, Marco Stabilito2015-11-11T17:25:50Zoai:ojs.emnuvens.com.br:article/939Revistahttp://producaoonline.org.br/rpoPUBhttps://www.producaoonline.org.br/rpo/oai||producaoonline@gmail.com1676-19011676-1901opendoar:2015-11-11T17:25:50Revista Produção Online - Associação Brasileira de Engenharia de Produção (ABEPRO)false |
dc.title.none.fl_str_mv |
Heuristics methods for the flow shop scheduling problem with separated setup times Métodos heurísticos para o problema de programação flow shop com tempos de setup separados |
title |
Heuristics methods for the flow shop scheduling problem with separated setup times |
spellingShingle |
Heuristics methods for the flow shop scheduling problem with separated setup times Nagano, Marcelo Seido Production scheduling. Permutation flow shop. Setup times. Heuristic method. Makespan Programação da produção. Flow shop permutacional. Tempos de setup. Método heurístico. Duração total da programação. |
title_short |
Heuristics methods for the flow shop scheduling problem with separated setup times |
title_full |
Heuristics methods for the flow shop scheduling problem with separated setup times |
title_fullStr |
Heuristics methods for the flow shop scheduling problem with separated setup times |
title_full_unstemmed |
Heuristics methods for the flow shop scheduling problem with separated setup times |
title_sort |
Heuristics methods for the flow shop scheduling problem with separated setup times |
author |
Nagano, Marcelo Seido |
author_facet |
Nagano, Marcelo Seido Mesquita, Marco Stabilito |
author_role |
author |
author2 |
Mesquita, Marco Stabilito |
author2_role |
author |
dc.contributor.author.fl_str_mv |
Nagano, Marcelo Seido Mesquita, Marco Stabilito |
dc.subject.por.fl_str_mv |
Production scheduling. Permutation flow shop. Setup times. Heuristic method. Makespan Programação da produção. Flow shop permutacional. Tempos de setup. Método heurístico. Duração total da programação. |
topic |
Production scheduling. Permutation flow shop. Setup times. Heuristic method. Makespan Programação da produção. Flow shop permutacional. Tempos de setup. Método heurístico. Duração total da programação. |
description |
This paper deals with the permutation flow shop scheduling problem with separated machine setup times. As a result of an investigation on the problem characteristics, four heuristics methods are proposed with procedures of the construction sequencing solution by an analogy with the asymmetric traveling salesman problem with the objective of minimizing makespan. Experimental results show that one of the new heuristics methods proposed provide high quality solutions in comparisons with the evaluated methods considered in the literature. |
publishDate |
2012 |
dc.date.none.fl_str_mv |
2012-06-13 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://www.producaoonline.org.br/rpo/article/view/939 10.14488/1676-1901.v12i2.939 |
url |
https://www.producaoonline.org.br/rpo/article/view/939 |
identifier_str_mv |
10.14488/1676-1901.v12i2.939 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.relation.none.fl_str_mv |
https://www.producaoonline.org.br/rpo/article/view/939/916 https://www.producaoonline.org.br/rpo/article/view/939/904 |
dc.rights.driver.fl_str_mv |
Copyright (c) 2014 Revista Produção Online info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Copyright (c) 2014 Revista Produção Online |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf audio/mpeg |
dc.publisher.none.fl_str_mv |
Associação Brasileira de Engenharia de Produção |
publisher.none.fl_str_mv |
Associação Brasileira de Engenharia de Produção |
dc.source.none.fl_str_mv |
Revista Produção Online; Vol. 12 No. 2 (2012); 499-521 Revista Produção Online; v. 12 n. 2 (2012); 499-521 1676-1901 reponame:Revista Produção Online instname:Associação Brasileira de Engenharia de Produção (ABEPRO) instacron:ABEPRO |
instname_str |
Associação Brasileira de Engenharia de Produção (ABEPRO) |
instacron_str |
ABEPRO |
institution |
ABEPRO |
reponame_str |
Revista Produção Online |
collection |
Revista Produção Online |
repository.name.fl_str_mv |
Revista Produção Online - Associação Brasileira de Engenharia de Produção (ABEPRO) |
repository.mail.fl_str_mv |
||producaoonline@gmail.com |
_version_ |
1761536948724301824 |