Development and analysis of production sequencing rules to minimize tardiness measures in flow shop with setup times
Autor(a) principal: | |
---|---|
Data de Publicação: | 2018 |
Outros Autores: | |
Tipo de documento: | Artigo |
Idioma: | por |
Título da fonte: | Revista Produção Online |
Texto Completo: | https://www.producaoonline.org.br/rpo/article/view/2819 |
Resumo: | Priority rules are production scheduling methods with many advantages, among others, the easy implementation and simple understanding. Therefore, this study aims to develop new priority rules for minimizing tardiness measures in a flow shop environment with sequence-independent setup times. The total tardiness of the schedule, the maximum tardiness and the percent of tardy jobs were analyzed as measures of performance. The study considers a flow shop with m machines and n jobs, and thus presents results for different options of problem-size. The research also evidence results for the different scenarios that can be seen in production, according to a high or low tardiness factor and the amplitude of the due dates. The results were generated by computational experiments. Among the new priority rules proposed, SPT3 rule constitutes a new alternative sequencing of production, able to present greater success than the traditional EDD. |
id |
ABEPRO-2_df8ee2c821bf1017fd37adc41b9865f0 |
---|---|
oai_identifier_str |
oai:ojs.emnuvens.com.br:article/2819 |
network_acronym_str |
ABEPRO-2 |
network_name_str |
Revista Produção Online |
repository_id_str |
|
spelling |
Development and analysis of production sequencing rules to minimize tardiness measures in flow shop with setup timesDesenvolvimento e análise de regras de sequenciamento da produção para minimização de medidas de atraso em flow shop com tempos de setupScheduling. Flow shop. Tardiness. Priority rules. Sequence-independent setup times.Programação da produção. Flow shop. Medidas de atraso. Regras de prioridade. Setup independente da sequência.Priority rules are production scheduling methods with many advantages, among others, the easy implementation and simple understanding. Therefore, this study aims to develop new priority rules for minimizing tardiness measures in a flow shop environment with sequence-independent setup times. The total tardiness of the schedule, the maximum tardiness and the percent of tardy jobs were analyzed as measures of performance. The study considers a flow shop with m machines and n jobs, and thus presents results for different options of problem-size. The research also evidence results for the different scenarios that can be seen in production, according to a high or low tardiness factor and the amplitude of the due dates. The results were generated by computational experiments. Among the new priority rules proposed, SPT3 rule constitutes a new alternative sequencing of production, able to present greater success than the traditional EDD.As regras de sequenciamento são métodos de programação da produção que possuem como vantagens, dentre outras, sua fácil implementação e simples compreensão. Neste sentido, este trabalho tem como objetivo o desenvolvimento de novas regras de sequenciamento para a minimização de medidas de atraso em um ambiente flow shop com setup independente da sequência. Foram analisadas, como medidas de desempenho, o atraso total da programação, o atraso máximo e o número de tarefas atrasadas. O estudo considera um flow shop com m máquinas e n tarefas, e, portanto, traz resultados para diferentes ambientes (relacionados ao porte do problema). A pesquisa traz resultados também em relação aos diferentes cenários que se pode observar na produção, de acordo com um alto ou baixo fator de atraso e com a amplitude da faixa de datas de entrega. Os resultados foram gerados através da experimentação computacional. Dentre as novas regras de prioridade propostas, destacam-se os resultados obtidos pela regra SPT3, constituindo uma nova alternativa de sequenciamento da produção, capaz de apresentar melhor desempenho que a regra clássica EDD.Associação Brasileira de Engenharia de Produção2018-06-15info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfvideo/mp4https://www.producaoonline.org.br/rpo/article/view/281910.14488/1676-1901.v18i2.2819Revista Produção Online; Vol. 18 No. 2 (2018); 454-478Revista Produção Online; v. 18 n. 2 (2018); 454-4781676-1901reponame:Revista Produção Onlineinstname:Associação Brasileira de Engenharia de Produção (ABEPRO)instacron:ABEPROporhttps://www.producaoonline.org.br/rpo/article/view/2819/1658https://www.producaoonline.org.br/rpo/article/view/2819/1659Copyright (c) 2018 Revista Produção Onlineinfo:eu-repo/semantics/openAccessSilva, Tatiane CarvalhoFuchigami, Helio Yochihiro2018-06-16T02:46:02Zoai:ojs.emnuvens.com.br:article/2819Revistahttp://producaoonline.org.br/rpoPUBhttps://www.producaoonline.org.br/rpo/oai||producaoonline@gmail.com1676-19011676-1901opendoar:2018-06-16T02:46:02Revista Produção Online - Associação Brasileira de Engenharia de Produção (ABEPRO)false |
dc.title.none.fl_str_mv |
Development and analysis of production sequencing rules to minimize tardiness measures in flow shop with setup times Desenvolvimento e análise de regras de sequenciamento da produção para minimização de medidas de atraso em flow shop com tempos de setup |
title |
Development and analysis of production sequencing rules to minimize tardiness measures in flow shop with setup times |
spellingShingle |
Development and analysis of production sequencing rules to minimize tardiness measures in flow shop with setup times Silva, Tatiane Carvalho Scheduling. Flow shop. Tardiness. Priority rules. Sequence-independent setup times. Programação da produção. Flow shop. Medidas de atraso. Regras de prioridade. Setup independente da sequência. |
title_short |
Development and analysis of production sequencing rules to minimize tardiness measures in flow shop with setup times |
title_full |
Development and analysis of production sequencing rules to minimize tardiness measures in flow shop with setup times |
title_fullStr |
Development and analysis of production sequencing rules to minimize tardiness measures in flow shop with setup times |
title_full_unstemmed |
Development and analysis of production sequencing rules to minimize tardiness measures in flow shop with setup times |
title_sort |
Development and analysis of production sequencing rules to minimize tardiness measures in flow shop with setup times |
author |
Silva, Tatiane Carvalho |
author_facet |
Silva, Tatiane Carvalho Fuchigami, Helio Yochihiro |
author_role |
author |
author2 |
Fuchigami, Helio Yochihiro |
author2_role |
author |
dc.contributor.author.fl_str_mv |
Silva, Tatiane Carvalho Fuchigami, Helio Yochihiro |
dc.subject.por.fl_str_mv |
Scheduling. Flow shop. Tardiness. Priority rules. Sequence-independent setup times. Programação da produção. Flow shop. Medidas de atraso. Regras de prioridade. Setup independente da sequência. |
topic |
Scheduling. Flow shop. Tardiness. Priority rules. Sequence-independent setup times. Programação da produção. Flow shop. Medidas de atraso. Regras de prioridade. Setup independente da sequência. |
description |
Priority rules are production scheduling methods with many advantages, among others, the easy implementation and simple understanding. Therefore, this study aims to develop new priority rules for minimizing tardiness measures in a flow shop environment with sequence-independent setup times. The total tardiness of the schedule, the maximum tardiness and the percent of tardy jobs were analyzed as measures of performance. The study considers a flow shop with m machines and n jobs, and thus presents results for different options of problem-size. The research also evidence results for the different scenarios that can be seen in production, according to a high or low tardiness factor and the amplitude of the due dates. The results were generated by computational experiments. Among the new priority rules proposed, SPT3 rule constitutes a new alternative sequencing of production, able to present greater success than the traditional EDD. |
publishDate |
2018 |
dc.date.none.fl_str_mv |
2018-06-15 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://www.producaoonline.org.br/rpo/article/view/2819 10.14488/1676-1901.v18i2.2819 |
url |
https://www.producaoonline.org.br/rpo/article/view/2819 |
identifier_str_mv |
10.14488/1676-1901.v18i2.2819 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.relation.none.fl_str_mv |
https://www.producaoonline.org.br/rpo/article/view/2819/1658 https://www.producaoonline.org.br/rpo/article/view/2819/1659 |
dc.rights.driver.fl_str_mv |
Copyright (c) 2018 Revista Produção Online info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Copyright (c) 2018 Revista Produção Online |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf video/mp4 |
dc.publisher.none.fl_str_mv |
Associação Brasileira de Engenharia de Produção |
publisher.none.fl_str_mv |
Associação Brasileira de Engenharia de Produção |
dc.source.none.fl_str_mv |
Revista Produção Online; Vol. 18 No. 2 (2018); 454-478 Revista Produção Online; v. 18 n. 2 (2018); 454-478 1676-1901 reponame:Revista Produção Online instname:Associação Brasileira de Engenharia de Produção (ABEPRO) instacron:ABEPRO |
instname_str |
Associação Brasileira de Engenharia de Produção (ABEPRO) |
instacron_str |
ABEPRO |
institution |
ABEPRO |
reponame_str |
Revista Produção Online |
collection |
Revista Produção Online |
repository.name.fl_str_mv |
Revista Produção Online - Associação Brasileira de Engenharia de Produção (ABEPRO) |
repository.mail.fl_str_mv |
||producaoonline@gmail.com |
_version_ |
1761536950566649856 |