A Study on Just-in-Time Implementation in Portugal: Some Empirical Evidence
Autor(a) principal: | |
---|---|
Data de Publicação: | 2010 |
Outros Autores: | |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Brazilian Journal of Operations & Production Management (Online) |
Texto Completo: | https://bjopm.org.br/bjopm/article/view/BJV5N1_2008_P1 |
Resumo: | The objective of this paper is to find how far the Just-in-Time system is being implementedby Portuguese manufacturing firms, as well as assessing its perception and its potentialbenefits by managers. First, several studies about the implementation of the Just-in-Timesystem in various countries over the past 25 years are reviewed, and then the descriptivesurvey research is reported. Data were collected from a mail questionnaire sent to a fewhundred firms in Portugal. The findings show that the surveyed firms view the Just-in-Timesystem as a way to reduce inventories, to increase quality, and to eliminate waste. Despitethis good perception, less than 6% of the surveyed firms have the necessary conditions tosuccessfully implement a Just-in-Time system. A significant practical implication of thisstudy is that Portuguese firms should use Just-in-Time as a philosophy rather than as asolution for operations-related problems. Another contribution is to point out the mostcommon difficulties for its implementation, so that Portuguese firms that want to do it canbe prepared to overcome those difficulties. |
id |
ABEPRO_5f7da0f48fcf9bd421de1b575e01b06b |
---|---|
oai_identifier_str |
oai:ojs.bjopm.org.br:article/59 |
network_acronym_str |
ABEPRO |
network_name_str |
Brazilian Journal of Operations & Production Management (Online) |
repository_id_str |
|
spelling |
A Study on Just-in-Time Implementation in Portugal: Some Empirical EvidenceThe objective of this paper is to find how far the Just-in-Time system is being implementedby Portuguese manufacturing firms, as well as assessing its perception and its potentialbenefits by managers. First, several studies about the implementation of the Just-in-Timesystem in various countries over the past 25 years are reviewed, and then the descriptivesurvey research is reported. Data were collected from a mail questionnaire sent to a fewhundred firms in Portugal. The findings show that the surveyed firms view the Just-in-Timesystem as a way to reduce inventories, to increase quality, and to eliminate waste. Despitethis good perception, less than 6% of the surveyed firms have the necessary conditions tosuccessfully implement a Just-in-Time system. A significant practical implication of thisstudy is that Portuguese firms should use Just-in-Time as a philosophy rather than as asolution for operations-related problems. Another contribution is to point out the mostcommon difficulties for its implementation, so that Portuguese firms that want to do it canbe prepared to overcome those difficulties.Brazilian Association for Industrial Engineering and Operations Management (ABEPRO)2010-02-10info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionPeer-reviewed Articleapplication/pdfhttps://bjopm.org.br/bjopm/article/view/BJV5N1_2008_P1Brazilian Journal of Operations & Production Management; Vol. 5 No. 1 (2008): July, 2008; 5-222237-8960reponame:Brazilian Journal of Operations & Production Management (Online)instname:Associação Brasileira de Engenharia de Produção (ABEPRO)instacron:ABEPROenghttps://bjopm.org.br/bjopm/article/view/BJV5N1_2008_P1/pdf_51Moreira, Maria Rosário Mota Oliveira AlvesAlves, Rui Alberto Ferreira Santosinfo:eu-repo/semantics/openAccess2019-04-04T07:28:59Zoai:ojs.bjopm.org.br:article/59Revistahttps://bjopm.org.br/bjopmONGhttps://bjopm.org.br/bjopm/oaibjopm.journal@gmail.com2237-89601679-8171opendoar:2023-03-13T09:45:02.276971Brazilian Journal of Operations & Production Management (Online) - Associação Brasileira de Engenharia de Produção (ABEPRO)false |
dc.title.none.fl_str_mv |
A Study on Just-in-Time Implementation in Portugal: Some Empirical Evidence |
title |
A Study on Just-in-Time Implementation in Portugal: Some Empirical Evidence |
spellingShingle |
A Study on Just-in-Time Implementation in Portugal: Some Empirical Evidence Moreira, Maria Rosário Mota Oliveira Alves |
title_short |
A Study on Just-in-Time Implementation in Portugal: Some Empirical Evidence |
title_full |
A Study on Just-in-Time Implementation in Portugal: Some Empirical Evidence |
title_fullStr |
A Study on Just-in-Time Implementation in Portugal: Some Empirical Evidence |
title_full_unstemmed |
A Study on Just-in-Time Implementation in Portugal: Some Empirical Evidence |
title_sort |
A Study on Just-in-Time Implementation in Portugal: Some Empirical Evidence |
author |
Moreira, Maria Rosário Mota Oliveira Alves |
author_facet |
Moreira, Maria Rosário Mota Oliveira Alves Alves, Rui Alberto Ferreira Santos |
author_role |
author |
author2 |
Alves, Rui Alberto Ferreira Santos |
author2_role |
author |
dc.contributor.author.fl_str_mv |
Moreira, Maria Rosário Mota Oliveira Alves Alves, Rui Alberto Ferreira Santos |
description |
The objective of this paper is to find how far the Just-in-Time system is being implementedby Portuguese manufacturing firms, as well as assessing its perception and its potentialbenefits by managers. First, several studies about the implementation of the Just-in-Timesystem in various countries over the past 25 years are reviewed, and then the descriptivesurvey research is reported. Data were collected from a mail questionnaire sent to a fewhundred firms in Portugal. The findings show that the surveyed firms view the Just-in-Timesystem as a way to reduce inventories, to increase quality, and to eliminate waste. Despitethis good perception, less than 6% of the surveyed firms have the necessary conditions tosuccessfully implement a Just-in-Time system. A significant practical implication of thisstudy is that Portuguese firms should use Just-in-Time as a philosophy rather than as asolution for operations-related problems. Another contribution is to point out the mostcommon difficulties for its implementation, so that Portuguese firms that want to do it canbe prepared to overcome those difficulties. |
publishDate |
2010 |
dc.date.none.fl_str_mv |
2010-02-10 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion Peer-reviewed Article |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://bjopm.org.br/bjopm/article/view/BJV5N1_2008_P1 |
url |
https://bjopm.org.br/bjopm/article/view/BJV5N1_2008_P1 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
https://bjopm.org.br/bjopm/article/view/BJV5N1_2008_P1/pdf_51 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
Brazilian Association for Industrial Engineering and Operations Management (ABEPRO) |
publisher.none.fl_str_mv |
Brazilian Association for Industrial Engineering and Operations Management (ABEPRO) |
dc.source.none.fl_str_mv |
Brazilian Journal of Operations & Production Management; Vol. 5 No. 1 (2008): July, 2008; 5-22 2237-8960 reponame:Brazilian Journal of Operations & Production Management (Online) instname:Associação Brasileira de Engenharia de Produção (ABEPRO) instacron:ABEPRO |
instname_str |
Associação Brasileira de Engenharia de Produção (ABEPRO) |
instacron_str |
ABEPRO |
institution |
ABEPRO |
reponame_str |
Brazilian Journal of Operations & Production Management (Online) |
collection |
Brazilian Journal of Operations & Production Management (Online) |
repository.name.fl_str_mv |
Brazilian Journal of Operations & Production Management (Online) - Associação Brasileira de Engenharia de Produção (ABEPRO) |
repository.mail.fl_str_mv |
bjopm.journal@gmail.com |
_version_ |
1797051459950346240 |