Total Quality Management: the case of an electricity distribution company
Autor(a) principal: | |
---|---|
Data de Publicação: | 2019 |
Outros Autores: | , , , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Brazilian Journal of Operations & Production Management (Online) |
DOI: | 10.14488/BJOPM.2019.v16.n1.a5 |
Texto Completo: | https://bjopm.org.br/bjopm/article/view/639 |
Resumo: | Goal: this research aims to deploy TQM in the new customers area of an electricity distribution company, located in Campos dos Goytacazes (Rio de Janeiro), based on three management pillars: guidelines, processes and routine. Design / Methodology / Approach: the nature of this work is applied research, with a qualitative problem approach, characterized as exploratory, using case study as a technical procedure, with data collected between april and september of 2015. Results: the performed methodology allowed a reduction of both "orders after deadline" (12%) and "unproductive visits" (22%) indicators. Limitations of the investigation: the research presented limitations, first, because of the resistance of some employees during the tools implementation and second, the methodology was implemented only in a sector of the company. Practical implications: the study was based on indicators and targets already used by the company. It was proposed and implemented an anomalies analysis and tools such asthe PDCA cycle, Pareto and Ishikawa diagrams, 5W1H, and Standard Operating Procedures. Originality / Value: there is little research with emphasis on TQM, especially when referring to an analysis using three levels of management (guidelines, process and routine) in the Brazilian electricity sector. |
id |
ABEPRO_c0f926c3922b84b402ed08954350c371 |
---|---|
oai_identifier_str |
oai:ojs.bjopm.org.br:article/639 |
network_acronym_str |
ABEPRO |
network_name_str |
Brazilian Journal of Operations & Production Management (Online) |
spelling |
Total Quality Management: the case of an electricity distribution companyProduction and operation systems managementElectrical energyQuality toolsGoal: this research aims to deploy TQM in the new customers area of an electricity distribution company, located in Campos dos Goytacazes (Rio de Janeiro), based on three management pillars: guidelines, processes and routine. Design / Methodology / Approach: the nature of this work is applied research, with a qualitative problem approach, characterized as exploratory, using case study as a technical procedure, with data collected between april and september of 2015. Results: the performed methodology allowed a reduction of both "orders after deadline" (12%) and "unproductive visits" (22%) indicators. Limitations of the investigation: the research presented limitations, first, because of the resistance of some employees during the tools implementation and second, the methodology was implemented only in a sector of the company. Practical implications: the study was based on indicators and targets already used by the company. It was proposed and implemented an anomalies analysis and tools such asthe PDCA cycle, Pareto and Ishikawa diagrams, 5W1H, and Standard Operating Procedures. Originality / Value: there is little research with emphasis on TQM, especially when referring to an analysis using three levels of management (guidelines, process and routine) in the Brazilian electricity sector.Brazilian Association for Industrial Engineering and Operations Management (ABEPRO)2019-03-07info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionPeer-reviewed Articletext/htmlapplication/pdfhttps://bjopm.org.br/bjopm/article/view/63910.14488/BJOPM.2019.v16.n1.a5Brazilian Journal of Operations & Production Management; Vol. 16 No. 1 (2019): March, 2019; 53-652237-8960reponame:Brazilian Journal of Operations & Production Management (Online)instname:Associação Brasileira de Engenharia de Produção (ABEPRO)instacron:ABEPROenghttps://bjopm.org.br/bjopm/article/view/639/761https://bjopm.org.br/bjopm/article/view/639/775Copyright (c) 2019 Brazilian Journal of Operations & Production Managementinfo:eu-repo/semantics/openAccessSantos, Ana Carla de Souza Gomes dosCarvalho, Leandro MachadoSouza, Caio Ferreira deReis, Augusto da CunhaFreitag, Alberto Eduardo Besser2021-07-13T14:14:23Zoai:ojs.bjopm.org.br:article/639Revistahttps://bjopm.org.br/bjopmONGhttps://bjopm.org.br/bjopm/oaibjopm.journal@gmail.com2237-89601679-8171opendoar:2023-03-13T09:45:19.820990Brazilian Journal of Operations & Production Management (Online) - Associação Brasileira de Engenharia de Produção (ABEPRO)false |
dc.title.none.fl_str_mv |
Total Quality Management: the case of an electricity distribution company |
title |
Total Quality Management: the case of an electricity distribution company |
spellingShingle |
Total Quality Management: the case of an electricity distribution company Total Quality Management: the case of an electricity distribution company Santos, Ana Carla de Souza Gomes dos Production and operation systems management Electrical energy Quality tools Santos, Ana Carla de Souza Gomes dos Production and operation systems management Electrical energy Quality tools |
title_short |
Total Quality Management: the case of an electricity distribution company |
title_full |
Total Quality Management: the case of an electricity distribution company |
title_fullStr |
Total Quality Management: the case of an electricity distribution company Total Quality Management: the case of an electricity distribution company |
title_full_unstemmed |
Total Quality Management: the case of an electricity distribution company Total Quality Management: the case of an electricity distribution company |
title_sort |
Total Quality Management: the case of an electricity distribution company |
author |
Santos, Ana Carla de Souza Gomes dos |
author_facet |
Santos, Ana Carla de Souza Gomes dos Santos, Ana Carla de Souza Gomes dos Carvalho, Leandro Machado Souza, Caio Ferreira de Reis, Augusto da Cunha Freitag, Alberto Eduardo Besser Carvalho, Leandro Machado Souza, Caio Ferreira de Reis, Augusto da Cunha Freitag, Alberto Eduardo Besser |
author_role |
author |
author2 |
Carvalho, Leandro Machado Souza, Caio Ferreira de Reis, Augusto da Cunha Freitag, Alberto Eduardo Besser |
author2_role |
author author author author |
dc.contributor.author.fl_str_mv |
Santos, Ana Carla de Souza Gomes dos Carvalho, Leandro Machado Souza, Caio Ferreira de Reis, Augusto da Cunha Freitag, Alberto Eduardo Besser |
dc.subject.por.fl_str_mv |
Production and operation systems management Electrical energy Quality tools |
topic |
Production and operation systems management Electrical energy Quality tools |
description |
Goal: this research aims to deploy TQM in the new customers area of an electricity distribution company, located in Campos dos Goytacazes (Rio de Janeiro), based on three management pillars: guidelines, processes and routine. Design / Methodology / Approach: the nature of this work is applied research, with a qualitative problem approach, characterized as exploratory, using case study as a technical procedure, with data collected between april and september of 2015. Results: the performed methodology allowed a reduction of both "orders after deadline" (12%) and "unproductive visits" (22%) indicators. Limitations of the investigation: the research presented limitations, first, because of the resistance of some employees during the tools implementation and second, the methodology was implemented only in a sector of the company. Practical implications: the study was based on indicators and targets already used by the company. It was proposed and implemented an anomalies analysis and tools such asthe PDCA cycle, Pareto and Ishikawa diagrams, 5W1H, and Standard Operating Procedures. Originality / Value: there is little research with emphasis on TQM, especially when referring to an analysis using three levels of management (guidelines, process and routine) in the Brazilian electricity sector. |
publishDate |
2019 |
dc.date.none.fl_str_mv |
2019-03-07 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion Peer-reviewed Article |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://bjopm.org.br/bjopm/article/view/639 10.14488/BJOPM.2019.v16.n1.a5 |
url |
https://bjopm.org.br/bjopm/article/view/639 |
identifier_str_mv |
10.14488/BJOPM.2019.v16.n1.a5 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
https://bjopm.org.br/bjopm/article/view/639/761 https://bjopm.org.br/bjopm/article/view/639/775 |
dc.rights.driver.fl_str_mv |
Copyright (c) 2019 Brazilian Journal of Operations & Production Management info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Copyright (c) 2019 Brazilian Journal of Operations & Production Management |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
text/html application/pdf |
dc.publisher.none.fl_str_mv |
Brazilian Association for Industrial Engineering and Operations Management (ABEPRO) |
publisher.none.fl_str_mv |
Brazilian Association for Industrial Engineering and Operations Management (ABEPRO) |
dc.source.none.fl_str_mv |
Brazilian Journal of Operations & Production Management; Vol. 16 No. 1 (2019): March, 2019; 53-65 2237-8960 reponame:Brazilian Journal of Operations & Production Management (Online) instname:Associação Brasileira de Engenharia de Produção (ABEPRO) instacron:ABEPRO |
instname_str |
Associação Brasileira de Engenharia de Produção (ABEPRO) |
instacron_str |
ABEPRO |
institution |
ABEPRO |
reponame_str |
Brazilian Journal of Operations & Production Management (Online) |
collection |
Brazilian Journal of Operations & Production Management (Online) |
repository.name.fl_str_mv |
Brazilian Journal of Operations & Production Management (Online) - Associação Brasileira de Engenharia de Produção (ABEPRO) |
repository.mail.fl_str_mv |
bjopm.journal@gmail.com |
_version_ |
1822178652808282112 |
dc.identifier.doi.none.fl_str_mv |
10.14488/BJOPM.2019.v16.n1.a5 |