Study on the factors of delay in construction works

Detalhes bibliográficos
Autor(a) principal: Carvalho,André Brasil
Data de Publicação: 2021
Outros Autores: Maués,Luiz Maurício Furtado, Moreira,Felipe de Sá, Reis,Caio José Losada
Tipo de documento: Artigo
Idioma: eng
Título da fonte: Ambiente construído (Online)
Texto Completo: http://old.scielo.br/scielo.php?script=sci_arttext&pid=S1678-86212021000300027
Resumo: Abstract The delay in civil construction works is observed globally and affects the economy of countries. Therefore, identifying the causes of delays is of paramount importance to minimize their consequences. This paper aims at identifying the causes of delay in construction works and their analysis and existing correlations through statistical factor analysis. The research methodology included a Systematic Literature Review (SLR), a Survey Research through questionnaires and interviews was conducted, as well as the identification of the main causes of delay through the Relative Importance Index (RIL) and the ABC Curve. Finally, factor analysis of the causes of delay was performed, not limiting only to their identification. The results showed that the 12 identified causes are correlated to 4 delay factors, which account for 69.18% of the sample variance: supply management (21.41%); workforce management (20,79%); project management (17.64%) and management of climatic conditions (9.34%). It is concluded hereby that the delay factors mentioned herein can be considered management deficiencies in the projects and that the research has expanded the knowledge on construction delays, thus contributing to the frontier of knowledge to mitigate this problem in several countries, especially developing ones.
id ANTAC-1_4cd6265a65139513d9e65d2a9f862812
oai_identifier_str oai:scielo:S1678-86212021000300027
network_acronym_str ANTAC-1
network_name_str Ambiente construído (Online)
repository_id_str
spelling Study on the factors of delay in construction worksFactors of construction work delayFactor analysisCauses of delayProject managementAbstract The delay in civil construction works is observed globally and affects the economy of countries. Therefore, identifying the causes of delays is of paramount importance to minimize their consequences. This paper aims at identifying the causes of delay in construction works and their analysis and existing correlations through statistical factor analysis. The research methodology included a Systematic Literature Review (SLR), a Survey Research through questionnaires and interviews was conducted, as well as the identification of the main causes of delay through the Relative Importance Index (RIL) and the ABC Curve. Finally, factor analysis of the causes of delay was performed, not limiting only to their identification. The results showed that the 12 identified causes are correlated to 4 delay factors, which account for 69.18% of the sample variance: supply management (21.41%); workforce management (20,79%); project management (17.64%) and management of climatic conditions (9.34%). It is concluded hereby that the delay factors mentioned herein can be considered management deficiencies in the projects and that the research has expanded the knowledge on construction delays, thus contributing to the frontier of knowledge to mitigate this problem in several countries, especially developing ones.Associação Nacional de Tecnologia do Ambiente Construído - ANTAC2021-09-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersiontext/htmlhttp://old.scielo.br/scielo.php?script=sci_arttext&pid=S1678-86212021000300027Ambiente Construído v.21 n.3 2021reponame:Ambiente construído (Online)instname:Associação Nacional de Tecnologia do Ambiente Construído (ANTAC)instacron:ANTAC10.1590/s1678-86212021000300536info:eu-repo/semantics/openAccessCarvalho,André BrasilMaués,Luiz Maurício FurtadoMoreira,Felipe de SáReis,Caio José Losadaeng2021-05-20T00:00:00Zoai:scielo:S1678-86212021000300027Revistahttps://seer.ufrgs.br/ambienteconstruidohttps://old.scielo.br/oai/scielo-oai.php||ambienteconstruido@ufrgs.br1678-86211415-8876opendoar:2021-05-20T00:00Ambiente construído (Online) - Associação Nacional de Tecnologia do Ambiente Construído (ANTAC)false
dc.title.none.fl_str_mv Study on the factors of delay in construction works
title Study on the factors of delay in construction works
spellingShingle Study on the factors of delay in construction works
Carvalho,André Brasil
Factors of construction work delay
Factor analysis
Causes of delay
Project management
title_short Study on the factors of delay in construction works
title_full Study on the factors of delay in construction works
title_fullStr Study on the factors of delay in construction works
title_full_unstemmed Study on the factors of delay in construction works
title_sort Study on the factors of delay in construction works
author Carvalho,André Brasil
author_facet Carvalho,André Brasil
Maués,Luiz Maurício Furtado
Moreira,Felipe de Sá
Reis,Caio José Losada
author_role author
author2 Maués,Luiz Maurício Furtado
Moreira,Felipe de Sá
Reis,Caio José Losada
author2_role author
author
author
dc.contributor.author.fl_str_mv Carvalho,André Brasil
Maués,Luiz Maurício Furtado
Moreira,Felipe de Sá
Reis,Caio José Losada
dc.subject.por.fl_str_mv Factors of construction work delay
Factor analysis
Causes of delay
Project management
topic Factors of construction work delay
Factor analysis
Causes of delay
Project management
description Abstract The delay in civil construction works is observed globally and affects the economy of countries. Therefore, identifying the causes of delays is of paramount importance to minimize their consequences. This paper aims at identifying the causes of delay in construction works and their analysis and existing correlations through statistical factor analysis. The research methodology included a Systematic Literature Review (SLR), a Survey Research through questionnaires and interviews was conducted, as well as the identification of the main causes of delay through the Relative Importance Index (RIL) and the ABC Curve. Finally, factor analysis of the causes of delay was performed, not limiting only to their identification. The results showed that the 12 identified causes are correlated to 4 delay factors, which account for 69.18% of the sample variance: supply management (21.41%); workforce management (20,79%); project management (17.64%) and management of climatic conditions (9.34%). It is concluded hereby that the delay factors mentioned herein can be considered management deficiencies in the projects and that the research has expanded the knowledge on construction delays, thus contributing to the frontier of knowledge to mitigate this problem in several countries, especially developing ones.
publishDate 2021
dc.date.none.fl_str_mv 2021-09-01
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://old.scielo.br/scielo.php?script=sci_arttext&pid=S1678-86212021000300027
url http://old.scielo.br/scielo.php?script=sci_arttext&pid=S1678-86212021000300027
dc.language.iso.fl_str_mv eng
language eng
dc.relation.none.fl_str_mv 10.1590/s1678-86212021000300536
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv text/html
dc.publisher.none.fl_str_mv Associação Nacional de Tecnologia do Ambiente Construído - ANTAC
publisher.none.fl_str_mv Associação Nacional de Tecnologia do Ambiente Construído - ANTAC
dc.source.none.fl_str_mv Ambiente Construído v.21 n.3 2021
reponame:Ambiente construído (Online)
instname:Associação Nacional de Tecnologia do Ambiente Construído (ANTAC)
instacron:ANTAC
instname_str Associação Nacional de Tecnologia do Ambiente Construído (ANTAC)
instacron_str ANTAC
institution ANTAC
reponame_str Ambiente construído (Online)
collection Ambiente construído (Online)
repository.name.fl_str_mv Ambiente construído (Online) - Associação Nacional de Tecnologia do Ambiente Construído (ANTAC)
repository.mail.fl_str_mv ||ambienteconstruido@ufrgs.br
_version_ 1754209104944955392