Study on the factors of delay in construction works
Autor(a) principal: | |
---|---|
Data de Publicação: | 2021 |
Outros Autores: | , , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Ambiente construído (Online) |
Texto Completo: | http://old.scielo.br/scielo.php?script=sci_arttext&pid=S1678-86212021000300027 |
Resumo: | Abstract The delay in civil construction works is observed globally and affects the economy of countries. Therefore, identifying the causes of delays is of paramount importance to minimize their consequences. This paper aims at identifying the causes of delay in construction works and their analysis and existing correlations through statistical factor analysis. The research methodology included a Systematic Literature Review (SLR), a Survey Research through questionnaires and interviews was conducted, as well as the identification of the main causes of delay through the Relative Importance Index (RIL) and the ABC Curve. Finally, factor analysis of the causes of delay was performed, not limiting only to their identification. The results showed that the 12 identified causes are correlated to 4 delay factors, which account for 69.18% of the sample variance: supply management (21.41%); workforce management (20,79%); project management (17.64%) and management of climatic conditions (9.34%). It is concluded hereby that the delay factors mentioned herein can be considered management deficiencies in the projects and that the research has expanded the knowledge on construction delays, thus contributing to the frontier of knowledge to mitigate this problem in several countries, especially developing ones. |
id |
ANTAC-1_4cd6265a65139513d9e65d2a9f862812 |
---|---|
oai_identifier_str |
oai:scielo:S1678-86212021000300027 |
network_acronym_str |
ANTAC-1 |
network_name_str |
Ambiente construído (Online) |
repository_id_str |
|
spelling |
Study on the factors of delay in construction worksFactors of construction work delayFactor analysisCauses of delayProject managementAbstract The delay in civil construction works is observed globally and affects the economy of countries. Therefore, identifying the causes of delays is of paramount importance to minimize their consequences. This paper aims at identifying the causes of delay in construction works and their analysis and existing correlations through statistical factor analysis. The research methodology included a Systematic Literature Review (SLR), a Survey Research through questionnaires and interviews was conducted, as well as the identification of the main causes of delay through the Relative Importance Index (RIL) and the ABC Curve. Finally, factor analysis of the causes of delay was performed, not limiting only to their identification. The results showed that the 12 identified causes are correlated to 4 delay factors, which account for 69.18% of the sample variance: supply management (21.41%); workforce management (20,79%); project management (17.64%) and management of climatic conditions (9.34%). It is concluded hereby that the delay factors mentioned herein can be considered management deficiencies in the projects and that the research has expanded the knowledge on construction delays, thus contributing to the frontier of knowledge to mitigate this problem in several countries, especially developing ones.Associação Nacional de Tecnologia do Ambiente Construído - ANTAC2021-09-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersiontext/htmlhttp://old.scielo.br/scielo.php?script=sci_arttext&pid=S1678-86212021000300027Ambiente Construído v.21 n.3 2021reponame:Ambiente construído (Online)instname:Associação Nacional de Tecnologia do Ambiente Construído (ANTAC)instacron:ANTAC10.1590/s1678-86212021000300536info:eu-repo/semantics/openAccessCarvalho,André BrasilMaués,Luiz Maurício FurtadoMoreira,Felipe de SáReis,Caio José Losadaeng2021-05-20T00:00:00Zoai:scielo:S1678-86212021000300027Revistahttps://seer.ufrgs.br/ambienteconstruidohttps://old.scielo.br/oai/scielo-oai.php||ambienteconstruido@ufrgs.br1678-86211415-8876opendoar:2021-05-20T00:00Ambiente construído (Online) - Associação Nacional de Tecnologia do Ambiente Construído (ANTAC)false |
dc.title.none.fl_str_mv |
Study on the factors of delay in construction works |
title |
Study on the factors of delay in construction works |
spellingShingle |
Study on the factors of delay in construction works Carvalho,André Brasil Factors of construction work delay Factor analysis Causes of delay Project management |
title_short |
Study on the factors of delay in construction works |
title_full |
Study on the factors of delay in construction works |
title_fullStr |
Study on the factors of delay in construction works |
title_full_unstemmed |
Study on the factors of delay in construction works |
title_sort |
Study on the factors of delay in construction works |
author |
Carvalho,André Brasil |
author_facet |
Carvalho,André Brasil Maués,Luiz Maurício Furtado Moreira,Felipe de Sá Reis,Caio José Losada |
author_role |
author |
author2 |
Maués,Luiz Maurício Furtado Moreira,Felipe de Sá Reis,Caio José Losada |
author2_role |
author author author |
dc.contributor.author.fl_str_mv |
Carvalho,André Brasil Maués,Luiz Maurício Furtado Moreira,Felipe de Sá Reis,Caio José Losada |
dc.subject.por.fl_str_mv |
Factors of construction work delay Factor analysis Causes of delay Project management |
topic |
Factors of construction work delay Factor analysis Causes of delay Project management |
description |
Abstract The delay in civil construction works is observed globally and affects the economy of countries. Therefore, identifying the causes of delays is of paramount importance to minimize their consequences. This paper aims at identifying the causes of delay in construction works and their analysis and existing correlations through statistical factor analysis. The research methodology included a Systematic Literature Review (SLR), a Survey Research through questionnaires and interviews was conducted, as well as the identification of the main causes of delay through the Relative Importance Index (RIL) and the ABC Curve. Finally, factor analysis of the causes of delay was performed, not limiting only to their identification. The results showed that the 12 identified causes are correlated to 4 delay factors, which account for 69.18% of the sample variance: supply management (21.41%); workforce management (20,79%); project management (17.64%) and management of climatic conditions (9.34%). It is concluded hereby that the delay factors mentioned herein can be considered management deficiencies in the projects and that the research has expanded the knowledge on construction delays, thus contributing to the frontier of knowledge to mitigate this problem in several countries, especially developing ones. |
publishDate |
2021 |
dc.date.none.fl_str_mv |
2021-09-01 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://old.scielo.br/scielo.php?script=sci_arttext&pid=S1678-86212021000300027 |
url |
http://old.scielo.br/scielo.php?script=sci_arttext&pid=S1678-86212021000300027 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
10.1590/s1678-86212021000300536 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
text/html |
dc.publisher.none.fl_str_mv |
Associação Nacional de Tecnologia do Ambiente Construído - ANTAC |
publisher.none.fl_str_mv |
Associação Nacional de Tecnologia do Ambiente Construído - ANTAC |
dc.source.none.fl_str_mv |
Ambiente Construído v.21 n.3 2021 reponame:Ambiente construído (Online) instname:Associação Nacional de Tecnologia do Ambiente Construído (ANTAC) instacron:ANTAC |
instname_str |
Associação Nacional de Tecnologia do Ambiente Construído (ANTAC) |
instacron_str |
ANTAC |
institution |
ANTAC |
reponame_str |
Ambiente construído (Online) |
collection |
Ambiente construído (Online) |
repository.name.fl_str_mv |
Ambiente construído (Online) - Associação Nacional de Tecnologia do Ambiente Construído (ANTAC) |
repository.mail.fl_str_mv |
||ambienteconstruido@ufrgs.br |
_version_ |
1754209104944955392 |