Mathematical model and supporting algorithm to aid the sequencing and scheduling of mining with loading equipment allocation
Autor(a) principal: | |
---|---|
Data de Publicação: | 2014 |
Outros Autores: | , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | REM. Revista Escola de Minas (Online) |
Texto Completo: | http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0370-44672014000400005 |
Resumo: | This paper focuses on the sequencing and scheduling problem of open pit mining, with the allocation of loading equipment considering a medium-term horizon. This study considers the existence of a heterogeneous loading equipment fleet and two types of mineable material, namely ore or waste rock. For the mining of ore, the following requirements are taken under consideration: the mixture quality, a crusher, the processing plant capacity and a stockpile, called ROM stockpile. In this context, we present a mathematical model in mixed integer linear programming, supported by an algorithm that is responsible for moving the time horizon at each model run, aiming to generate mining orders resolved with optimality. Together, these orders describe the loading equipment mining plan. |
id |
ESCOLADEMINAS-1_4599626cc6259ad6f42b3671aa22a362 |
---|---|
oai_identifier_str |
oai:scielo:S0370-44672014000400005 |
network_acronym_str |
ESCOLADEMINAS-1 |
network_name_str |
REM. Revista Escola de Minas (Online) |
repository_id_str |
|
spelling |
Mathematical model and supporting algorithm to aid the sequencing and scheduling of mining with loading equipment allocationmixed integer linear programmingschedulingmining planningThis paper focuses on the sequencing and scheduling problem of open pit mining, with the allocation of loading equipment considering a medium-term horizon. This study considers the existence of a heterogeneous loading equipment fleet and two types of mineable material, namely ore or waste rock. For the mining of ore, the following requirements are taken under consideration: the mixture quality, a crusher, the processing plant capacity and a stockpile, called ROM stockpile. In this context, we present a mathematical model in mixed integer linear programming, supported by an algorithm that is responsible for moving the time horizon at each model run, aiming to generate mining orders resolved with optimality. Together, these orders describe the loading equipment mining plan.Escola de Minas2014-12-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersiontext/htmlhttp://old.scielo.br/scielo.php?script=sci_arttext&pid=S0370-44672014000400005Rem: Revista Escola de Minas v.67 n.4 2014reponame:REM. Revista Escola de Minas (Online)instname:Escola de Minasinstacron:ESCOLA DE MINAS10.1590/0370-44672014670175info:eu-repo/semantics/openAccessAndrade,ArthurSantoro,MiguelTomi,Giorgio deeng2014-11-07T00:00:00Zoai:scielo:S0370-44672014000400005Revistahttp://www.scielo.br/remhttps://old.scielo.br/oai/scielo-oai.phpeditor@rem.com.br1807-03530370-4467opendoar:2014-11-07T00:00REM. Revista Escola de Minas (Online) - Escola de Minasfalse |
dc.title.none.fl_str_mv |
Mathematical model and supporting algorithm to aid the sequencing and scheduling of mining with loading equipment allocation |
title |
Mathematical model and supporting algorithm to aid the sequencing and scheduling of mining with loading equipment allocation |
spellingShingle |
Mathematical model and supporting algorithm to aid the sequencing and scheduling of mining with loading equipment allocation Andrade,Arthur mixed integer linear programming scheduling mining planning |
title_short |
Mathematical model and supporting algorithm to aid the sequencing and scheduling of mining with loading equipment allocation |
title_full |
Mathematical model and supporting algorithm to aid the sequencing and scheduling of mining with loading equipment allocation |
title_fullStr |
Mathematical model and supporting algorithm to aid the sequencing and scheduling of mining with loading equipment allocation |
title_full_unstemmed |
Mathematical model and supporting algorithm to aid the sequencing and scheduling of mining with loading equipment allocation |
title_sort |
Mathematical model and supporting algorithm to aid the sequencing and scheduling of mining with loading equipment allocation |
author |
Andrade,Arthur |
author_facet |
Andrade,Arthur Santoro,Miguel Tomi,Giorgio de |
author_role |
author |
author2 |
Santoro,Miguel Tomi,Giorgio de |
author2_role |
author author |
dc.contributor.author.fl_str_mv |
Andrade,Arthur Santoro,Miguel Tomi,Giorgio de |
dc.subject.por.fl_str_mv |
mixed integer linear programming scheduling mining planning |
topic |
mixed integer linear programming scheduling mining planning |
description |
This paper focuses on the sequencing and scheduling problem of open pit mining, with the allocation of loading equipment considering a medium-term horizon. This study considers the existence of a heterogeneous loading equipment fleet and two types of mineable material, namely ore or waste rock. For the mining of ore, the following requirements are taken under consideration: the mixture quality, a crusher, the processing plant capacity and a stockpile, called ROM stockpile. In this context, we present a mathematical model in mixed integer linear programming, supported by an algorithm that is responsible for moving the time horizon at each model run, aiming to generate mining orders resolved with optimality. Together, these orders describe the loading equipment mining plan. |
publishDate |
2014 |
dc.date.none.fl_str_mv |
2014-12-01 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0370-44672014000400005 |
url |
http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0370-44672014000400005 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
10.1590/0370-44672014670175 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
text/html |
dc.publisher.none.fl_str_mv |
Escola de Minas |
publisher.none.fl_str_mv |
Escola de Minas |
dc.source.none.fl_str_mv |
Rem: Revista Escola de Minas v.67 n.4 2014 reponame:REM. Revista Escola de Minas (Online) instname:Escola de Minas instacron:ESCOLA DE MINAS |
instname_str |
Escola de Minas |
instacron_str |
ESCOLA DE MINAS |
institution |
ESCOLA DE MINAS |
reponame_str |
REM. Revista Escola de Minas (Online) |
collection |
REM. Revista Escola de Minas (Online) |
repository.name.fl_str_mv |
REM. Revista Escola de Minas (Online) - Escola de Minas |
repository.mail.fl_str_mv |
editor@rem.com.br |
_version_ |
1754122198966075392 |