Technical and operational aspects of tunnel rounds in artisanal underground mining

Detalhes bibliográficos
Autor(a) principal: Seccatore,Jacopo
Data de Publicação: 2014
Outros Autores: Magny,Lorenzo, De Tomi,Giorgio
Tipo de documento: Artigo
Idioma: eng
Título da fonte: REM. Revista Escola de Minas (Online)
Texto Completo: http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0370-44672014000300010
Resumo: In the world today, due to the current high price of gold, thousands of artisanal small-scale mines operate without the financial or technical capacity to upgrade their production methods, often using equipment and working methods that were forsaken decades ago in the conventional mining industry. This article illustrates, with a practical example, that it is possible to achieve the modern requirements of quality, safety and productivity, while operating with mining equipment that basically possesses the same characteristics as that employed in the 1950s. The operation involved the excavation of a 6 meter long tunnel and over 25 stoping sections in both rock and concrete by drilling and blasting in an underground gold mine. The article describes how the main operational problems were overcome. An effective drilling pattern was designed in order to be easily achievable with the limited local equipment. The behavior of the local nitrate explosive was effectively predicted and managed. The interaction with the drilling teams was managed in order to determine a meeting point between their traditional working methods and the scientific view of the engineer. At the end of the article some general guidelines are proposed for the management of similar situations, in order to improve the efficiency, productivity and safety of drill and blast operations in small-scale mines.
id ESCOLADEMINAS-1_eff44fa67e4a328cbb79fc92c5a04b69
oai_identifier_str oai:scielo:S0370-44672014000300010
network_acronym_str ESCOLADEMINAS-1
network_name_str REM. Revista Escola de Minas (Online)
repository_id_str
spelling Technical and operational aspects of tunnel rounds in artisanal underground miningunderground miningsmall-scale miningdrill and blastpyrotechnic ignitionIn the world today, due to the current high price of gold, thousands of artisanal small-scale mines operate without the financial or technical capacity to upgrade their production methods, often using equipment and working methods that were forsaken decades ago in the conventional mining industry. This article illustrates, with a practical example, that it is possible to achieve the modern requirements of quality, safety and productivity, while operating with mining equipment that basically possesses the same characteristics as that employed in the 1950s. The operation involved the excavation of a 6 meter long tunnel and over 25 stoping sections in both rock and concrete by drilling and blasting in an underground gold mine. The article describes how the main operational problems were overcome. An effective drilling pattern was designed in order to be easily achievable with the limited local equipment. The behavior of the local nitrate explosive was effectively predicted and managed. The interaction with the drilling teams was managed in order to determine a meeting point between their traditional working methods and the scientific view of the engineer. At the end of the article some general guidelines are proposed for the management of similar situations, in order to improve the efficiency, productivity and safety of drill and blast operations in small-scale mines.Escola de Minas2014-09-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersiontext/htmlhttp://old.scielo.br/scielo.php?script=sci_arttext&pid=S0370-44672014000300010Rem: Revista Escola de Minas v.67 n.3 2014reponame:REM. Revista Escola de Minas (Online)instname:Escola de Minasinstacron:ESCOLA DE MINAS10.1590/S0370-44672014000300010info:eu-repo/semantics/openAccessSeccatore,JacopoMagny,LorenzoDe Tomi,Giorgioeng2014-09-30T00:00:00Zoai:scielo:S0370-44672014000300010Revistahttp://www.scielo.br/remhttps://old.scielo.br/oai/scielo-oai.phpeditor@rem.com.br1807-03530370-4467opendoar:2014-09-30T00:00REM. Revista Escola de Minas (Online) - Escola de Minasfalse
dc.title.none.fl_str_mv Technical and operational aspects of tunnel rounds in artisanal underground mining
title Technical and operational aspects of tunnel rounds in artisanal underground mining
spellingShingle Technical and operational aspects of tunnel rounds in artisanal underground mining
Seccatore,Jacopo
underground mining
small-scale mining
drill and blast
pyrotechnic ignition
title_short Technical and operational aspects of tunnel rounds in artisanal underground mining
title_full Technical and operational aspects of tunnel rounds in artisanal underground mining
title_fullStr Technical and operational aspects of tunnel rounds in artisanal underground mining
title_full_unstemmed Technical and operational aspects of tunnel rounds in artisanal underground mining
title_sort Technical and operational aspects of tunnel rounds in artisanal underground mining
author Seccatore,Jacopo
author_facet Seccatore,Jacopo
Magny,Lorenzo
De Tomi,Giorgio
author_role author
author2 Magny,Lorenzo
De Tomi,Giorgio
author2_role author
author
dc.contributor.author.fl_str_mv Seccatore,Jacopo
Magny,Lorenzo
De Tomi,Giorgio
dc.subject.por.fl_str_mv underground mining
small-scale mining
drill and blast
pyrotechnic ignition
topic underground mining
small-scale mining
drill and blast
pyrotechnic ignition
description In the world today, due to the current high price of gold, thousands of artisanal small-scale mines operate without the financial or technical capacity to upgrade their production methods, often using equipment and working methods that were forsaken decades ago in the conventional mining industry. This article illustrates, with a practical example, that it is possible to achieve the modern requirements of quality, safety and productivity, while operating with mining equipment that basically possesses the same characteristics as that employed in the 1950s. The operation involved the excavation of a 6 meter long tunnel and over 25 stoping sections in both rock and concrete by drilling and blasting in an underground gold mine. The article describes how the main operational problems were overcome. An effective drilling pattern was designed in order to be easily achievable with the limited local equipment. The behavior of the local nitrate explosive was effectively predicted and managed. The interaction with the drilling teams was managed in order to determine a meeting point between their traditional working methods and the scientific view of the engineer. At the end of the article some general guidelines are proposed for the management of similar situations, in order to improve the efficiency, productivity and safety of drill and blast operations in small-scale mines.
publishDate 2014
dc.date.none.fl_str_mv 2014-09-01
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0370-44672014000300010
url http://old.scielo.br/scielo.php?script=sci_arttext&pid=S0370-44672014000300010
dc.language.iso.fl_str_mv eng
language eng
dc.relation.none.fl_str_mv 10.1590/S0370-44672014000300010
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv text/html
dc.publisher.none.fl_str_mv Escola de Minas
publisher.none.fl_str_mv Escola de Minas
dc.source.none.fl_str_mv Rem: Revista Escola de Minas v.67 n.3 2014
reponame:REM. Revista Escola de Minas (Online)
instname:Escola de Minas
instacron:ESCOLA DE MINAS
instname_str Escola de Minas
instacron_str ESCOLA DE MINAS
institution ESCOLA DE MINAS
reponame_str REM. Revista Escola de Minas (Online)
collection REM. Revista Escola de Minas (Online)
repository.name.fl_str_mv REM. Revista Escola de Minas (Online) - Escola de Minas
repository.mail.fl_str_mv editor@rem.com.br
_version_ 1754122198959783936