Unplanned dilution back analysis in an underground mine using numerical models
Autor(a) principal: | |
---|---|
Data de Publicação: | 2022 |
Outros Autores: | , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | REM - International Engineering Journal |
Texto Completo: | http://old.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2022000400379 |
Resumo: | Abstract In underground mines, stability problems can cause unplanned dilution, increasing the costs of mining operations, such as loading, transport, crushing and grinding. This is usually dealt with by simply increasing investments with support. However, the design geometry of stopes and drifts also has a great effect on a stope’s stability. The use of empirical stability methods is a very common practice, however because of their few input parameters, it cannot predict the actual performance related to each stope and drift design. This study has as main goals a back analysis of the actual dilution, using the Equivalent Linear Overbreak Slough (ELOS) method and analysis in the drift developments at the hanging wall contact, using numerical models. The case study is an underground hard rock gold mine, with a pillar-less Transversal Stope method. The hanging wall failure was quantified using a database from 19 stopes measured by the Cavity Monitoring System (CMS). Numerical finite elements models (FEM) were used, and 5 primary stopes were selected to calibrate models. The volumes of actual dilution showed a good correlation with the volumes of the relaxation zones produced by the models. Then, new optimized drift geometry layouts at the hanging wall contact were proposed, showing a decrease in 2.35 times in the relaxation zone of the numerical models, therefore justifying the use of these models as a dilution optimization tool. This methodology also proved to be useful in the definition of cable bolt length. |
id |
FG-1_8fb7ea7c728a74c0dfd83ff66e7c37cd |
---|---|
oai_identifier_str |
oai:scielo:S2448-167X2022000400379 |
network_acronym_str |
FG-1 |
network_name_str |
REM - International Engineering Journal |
repository_id_str |
|
spelling |
Unplanned dilution back analysis in an underground mine using numerical modelsunplanned dilutiontransversal stopeshanging wallcable boltsELOS.Abstract In underground mines, stability problems can cause unplanned dilution, increasing the costs of mining operations, such as loading, transport, crushing and grinding. This is usually dealt with by simply increasing investments with support. However, the design geometry of stopes and drifts also has a great effect on a stope’s stability. The use of empirical stability methods is a very common practice, however because of their few input parameters, it cannot predict the actual performance related to each stope and drift design. This study has as main goals a back analysis of the actual dilution, using the Equivalent Linear Overbreak Slough (ELOS) method and analysis in the drift developments at the hanging wall contact, using numerical models. The case study is an underground hard rock gold mine, with a pillar-less Transversal Stope method. The hanging wall failure was quantified using a database from 19 stopes measured by the Cavity Monitoring System (CMS). Numerical finite elements models (FEM) were used, and 5 primary stopes were selected to calibrate models. The volumes of actual dilution showed a good correlation with the volumes of the relaxation zones produced by the models. Then, new optimized drift geometry layouts at the hanging wall contact were proposed, showing a decrease in 2.35 times in the relaxation zone of the numerical models, therefore justifying the use of these models as a dilution optimization tool. This methodology also proved to be useful in the definition of cable bolt length.Fundação Gorceix2022-12-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersiontext/htmlhttp://old.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2022000400379REM - International Engineering Journal v.75 n.4 2022reponame:REM - International Engineering Journalinstname:Fundação Gorceix (FG)instacron:FG10.1590/0370-44672021750093info:eu-repo/semantics/openAccessCordova,Diogo PeixotoZingano,André CezarGonçalves,Ítalo Gomeseng2022-09-15T00:00:00Zoai:scielo:S2448-167X2022000400379Revistahttps://www.rem.com.br/?lang=pt-brPRIhttps://old.scielo.br/oai/scielo-oai.php||editor@rem.com.br2448-167X2448-167Xopendoar:2022-09-15T00:00REM - International Engineering Journal - Fundação Gorceix (FG)false |
dc.title.none.fl_str_mv |
Unplanned dilution back analysis in an underground mine using numerical models |
title |
Unplanned dilution back analysis in an underground mine using numerical models |
spellingShingle |
Unplanned dilution back analysis in an underground mine using numerical models Cordova,Diogo Peixoto unplanned dilution transversal stopes hanging wall cable bolts ELOS. |
title_short |
Unplanned dilution back analysis in an underground mine using numerical models |
title_full |
Unplanned dilution back analysis in an underground mine using numerical models |
title_fullStr |
Unplanned dilution back analysis in an underground mine using numerical models |
title_full_unstemmed |
Unplanned dilution back analysis in an underground mine using numerical models |
title_sort |
Unplanned dilution back analysis in an underground mine using numerical models |
author |
Cordova,Diogo Peixoto |
author_facet |
Cordova,Diogo Peixoto Zingano,André Cezar Gonçalves,Ítalo Gomes |
author_role |
author |
author2 |
Zingano,André Cezar Gonçalves,Ítalo Gomes |
author2_role |
author author |
dc.contributor.author.fl_str_mv |
Cordova,Diogo Peixoto Zingano,André Cezar Gonçalves,Ítalo Gomes |
dc.subject.por.fl_str_mv |
unplanned dilution transversal stopes hanging wall cable bolts ELOS. |
topic |
unplanned dilution transversal stopes hanging wall cable bolts ELOS. |
description |
Abstract In underground mines, stability problems can cause unplanned dilution, increasing the costs of mining operations, such as loading, transport, crushing and grinding. This is usually dealt with by simply increasing investments with support. However, the design geometry of stopes and drifts also has a great effect on a stope’s stability. The use of empirical stability methods is a very common practice, however because of their few input parameters, it cannot predict the actual performance related to each stope and drift design. This study has as main goals a back analysis of the actual dilution, using the Equivalent Linear Overbreak Slough (ELOS) method and analysis in the drift developments at the hanging wall contact, using numerical models. The case study is an underground hard rock gold mine, with a pillar-less Transversal Stope method. The hanging wall failure was quantified using a database from 19 stopes measured by the Cavity Monitoring System (CMS). Numerical finite elements models (FEM) were used, and 5 primary stopes were selected to calibrate models. The volumes of actual dilution showed a good correlation with the volumes of the relaxation zones produced by the models. Then, new optimized drift geometry layouts at the hanging wall contact were proposed, showing a decrease in 2.35 times in the relaxation zone of the numerical models, therefore justifying the use of these models as a dilution optimization tool. This methodology also proved to be useful in the definition of cable bolt length. |
publishDate |
2022 |
dc.date.none.fl_str_mv |
2022-12-01 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://old.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2022000400379 |
url |
http://old.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2022000400379 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
10.1590/0370-44672021750093 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
text/html |
dc.publisher.none.fl_str_mv |
Fundação Gorceix |
publisher.none.fl_str_mv |
Fundação Gorceix |
dc.source.none.fl_str_mv |
REM - International Engineering Journal v.75 n.4 2022 reponame:REM - International Engineering Journal instname:Fundação Gorceix (FG) instacron:FG |
instname_str |
Fundação Gorceix (FG) |
instacron_str |
FG |
institution |
FG |
reponame_str |
REM - International Engineering Journal |
collection |
REM - International Engineering Journal |
repository.name.fl_str_mv |
REM - International Engineering Journal - Fundação Gorceix (FG) |
repository.mail.fl_str_mv |
||editor@rem.com.br |
_version_ |
1754734691989061632 |