Unplanned dilution back analysis in an underground mine using numerical models

Detalhes bibliográficos
Autor(a) principal: Cordova,Diogo Peixoto
Data de Publicação: 2022
Outros Autores: Zingano,André Cezar, Gonçalves,Ítalo Gomes
Tipo de documento: Artigo
Idioma: eng
Título da fonte: REM - International Engineering Journal
Texto Completo: http://old.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2022000400379
Resumo: Abstract In underground mines, stability problems can cause unplanned dilution, increasing the costs of mining operations, such as loading, transport, crushing and grinding. This is usually dealt with by simply increasing investments with support. However, the design geometry of stopes and drifts also has a great effect on a stope’s stability. The use of empirical stability methods is a very common practice, however because of their few input parameters, it cannot predict the actual performance related to each stope and drift design. This study has as main goals a back analysis of the actual dilution, using the Equivalent Linear Overbreak Slough (ELOS) method and analysis in the drift developments at the hanging wall contact, using numerical models. The case study is an underground hard rock gold mine, with a pillar-less Transversal Stope method. The hanging wall failure was quantified using a database from 19 stopes measured by the Cavity Monitoring System (CMS). Numerical finite elements models (FEM) were used, and 5 primary stopes were selected to calibrate models. The volumes of actual dilution showed a good correlation with the volumes of the relaxation zones produced by the models. Then, new optimized drift geometry layouts at the hanging wall contact were proposed, showing a decrease in 2.35 times in the relaxation zone of the numerical models, therefore justifying the use of these models as a dilution optimization tool. This methodology also proved to be useful in the definition of cable bolt length.
id FG-1_8fb7ea7c728a74c0dfd83ff66e7c37cd
oai_identifier_str oai:scielo:S2448-167X2022000400379
network_acronym_str FG-1
network_name_str REM - International Engineering Journal
repository_id_str
spelling Unplanned dilution back analysis in an underground mine using numerical modelsunplanned dilutiontransversal stopeshanging wallcable boltsELOS.Abstract In underground mines, stability problems can cause unplanned dilution, increasing the costs of mining operations, such as loading, transport, crushing and grinding. This is usually dealt with by simply increasing investments with support. However, the design geometry of stopes and drifts also has a great effect on a stope’s stability. The use of empirical stability methods is a very common practice, however because of their few input parameters, it cannot predict the actual performance related to each stope and drift design. This study has as main goals a back analysis of the actual dilution, using the Equivalent Linear Overbreak Slough (ELOS) method and analysis in the drift developments at the hanging wall contact, using numerical models. The case study is an underground hard rock gold mine, with a pillar-less Transversal Stope method. The hanging wall failure was quantified using a database from 19 stopes measured by the Cavity Monitoring System (CMS). Numerical finite elements models (FEM) were used, and 5 primary stopes were selected to calibrate models. The volumes of actual dilution showed a good correlation with the volumes of the relaxation zones produced by the models. Then, new optimized drift geometry layouts at the hanging wall contact were proposed, showing a decrease in 2.35 times in the relaxation zone of the numerical models, therefore justifying the use of these models as a dilution optimization tool. This methodology also proved to be useful in the definition of cable bolt length.Fundação Gorceix2022-12-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersiontext/htmlhttp://old.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2022000400379REM - International Engineering Journal v.75 n.4 2022reponame:REM - International Engineering Journalinstname:Fundação Gorceix (FG)instacron:FG10.1590/0370-44672021750093info:eu-repo/semantics/openAccessCordova,Diogo PeixotoZingano,André CezarGonçalves,Ítalo Gomeseng2022-09-15T00:00:00Zoai:scielo:S2448-167X2022000400379Revistahttps://www.rem.com.br/?lang=pt-brPRIhttps://old.scielo.br/oai/scielo-oai.php||editor@rem.com.br2448-167X2448-167Xopendoar:2022-09-15T00:00REM - International Engineering Journal - Fundação Gorceix (FG)false
dc.title.none.fl_str_mv Unplanned dilution back analysis in an underground mine using numerical models
title Unplanned dilution back analysis in an underground mine using numerical models
spellingShingle Unplanned dilution back analysis in an underground mine using numerical models
Cordova,Diogo Peixoto
unplanned dilution
transversal stopes
hanging wall
cable bolts
ELOS.
title_short Unplanned dilution back analysis in an underground mine using numerical models
title_full Unplanned dilution back analysis in an underground mine using numerical models
title_fullStr Unplanned dilution back analysis in an underground mine using numerical models
title_full_unstemmed Unplanned dilution back analysis in an underground mine using numerical models
title_sort Unplanned dilution back analysis in an underground mine using numerical models
author Cordova,Diogo Peixoto
author_facet Cordova,Diogo Peixoto
Zingano,André Cezar
Gonçalves,Ítalo Gomes
author_role author
author2 Zingano,André Cezar
Gonçalves,Ítalo Gomes
author2_role author
author
dc.contributor.author.fl_str_mv Cordova,Diogo Peixoto
Zingano,André Cezar
Gonçalves,Ítalo Gomes
dc.subject.por.fl_str_mv unplanned dilution
transversal stopes
hanging wall
cable bolts
ELOS.
topic unplanned dilution
transversal stopes
hanging wall
cable bolts
ELOS.
description Abstract In underground mines, stability problems can cause unplanned dilution, increasing the costs of mining operations, such as loading, transport, crushing and grinding. This is usually dealt with by simply increasing investments with support. However, the design geometry of stopes and drifts also has a great effect on a stope’s stability. The use of empirical stability methods is a very common practice, however because of their few input parameters, it cannot predict the actual performance related to each stope and drift design. This study has as main goals a back analysis of the actual dilution, using the Equivalent Linear Overbreak Slough (ELOS) method and analysis in the drift developments at the hanging wall contact, using numerical models. The case study is an underground hard rock gold mine, with a pillar-less Transversal Stope method. The hanging wall failure was quantified using a database from 19 stopes measured by the Cavity Monitoring System (CMS). Numerical finite elements models (FEM) were used, and 5 primary stopes were selected to calibrate models. The volumes of actual dilution showed a good correlation with the volumes of the relaxation zones produced by the models. Then, new optimized drift geometry layouts at the hanging wall contact were proposed, showing a decrease in 2.35 times in the relaxation zone of the numerical models, therefore justifying the use of these models as a dilution optimization tool. This methodology also proved to be useful in the definition of cable bolt length.
publishDate 2022
dc.date.none.fl_str_mv 2022-12-01
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://old.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2022000400379
url http://old.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2022000400379
dc.language.iso.fl_str_mv eng
language eng
dc.relation.none.fl_str_mv 10.1590/0370-44672021750093
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv text/html
dc.publisher.none.fl_str_mv Fundação Gorceix
publisher.none.fl_str_mv Fundação Gorceix
dc.source.none.fl_str_mv REM - International Engineering Journal v.75 n.4 2022
reponame:REM - International Engineering Journal
instname:Fundação Gorceix (FG)
instacron:FG
instname_str Fundação Gorceix (FG)
instacron_str FG
institution FG
reponame_str REM - International Engineering Journal
collection REM - International Engineering Journal
repository.name.fl_str_mv REM - International Engineering Journal - Fundação Gorceix (FG)
repository.mail.fl_str_mv ||editor@rem.com.br
_version_ 1754734691989061632