A utilização de leilões em modelos de expansão da rede de transmissão de energia elétrica

Detalhes bibliográficos
Autor(a) principal: Paulo, Goret Pereira
Data de Publicação: 2012
Tipo de documento: Tese
Idioma: por
Título da fonte: Repositório Institucional do FGV (FGV Repositório Digital)
Texto Completo: http://hdl.handle.net/10438/10279
Resumo: With the purpose of contributing to the literature about regulation of infrastructure sectors, this paper shows an analysis of the regulatory model used to enable the expansion of the electrical energy transmission capacity in Brazil. In this country, of continental dimensions, the transmission sector plays a vital role enabling the electrical energy supply and, thus, enabling a sustainable growth path for the economic activity. Large amounts of energy are transmitted among generator units, mainly hydroelectric power plants, which, in many cases, are located in regions quite faraway from big consumption centers. Due to the similarity among continental dimensions and volumes of energy produced and consumed, the regulatory models used for the expansion of the transmission in Brazil and Argentina are compared. Institutional and political system aspects in both countries are highlighted in order to explain the differences between the two models as well as the results achieved in each country. In this case, the challenges are highlighted for the expansion of the transmission infrastructure of high tension and large extensions in the Argentinean case, as well as the advantages of the Brazilian model that matches auctioning and a centralized planning mechanism. The peculiarities of the Brazilian regulatory model, mainly concerning the hybrid model of transmission award agreement auctions, along with periodical reviews of investor's revenue, get special attention. Through an analysis of the bids presented in the auctions carried out in Brazil between 2002 and 2008, the reaction of participants is tested as regards the change in the regulatory model introduced in 2006, when the periodical tariff review was introduced in award agreements for transmission services. With this change, participants have not increased the value of their bids at the auctions, indicating that there has not been an increase in the perception of the business risk for investors due to this regulatory change. The information used by the participants to present their bids, in the auction model for transmission expansion in Brazil, is analyzed through an extended sample of the bids presented between 1999-2011. Empirical evidences are found that the participants' bids are correlated, indicating that they take competitors' bids into account in order to elaborate their own bids.
id FGV_e15dc0d7f587c2a609aa2d4081cd7e6c
oai_identifier_str oai:repositorio.fgv.br:10438/10279
network_acronym_str FGV
network_name_str Repositório Institucional do FGV (FGV Repositório Digital)
repository_id_str 3974
spelling Paulo, Goret PereiraEscolas::EAESPAbrucio, Fernando LuizAvelino Filho, GeorgePereira, CarlosLucinda, Cláudio Ribeiro deBiderman, Ciro2012-12-14T12:10:56Z2012-12-14T12:10:56Z2012-08-15PAULO, Goret Pereira. A utilização de leilões em modelos de expansão da rede de transmissão de energia elétrica. Tese (Doutorado em Administração Pública e Governo) - FGV - Fundação Getúlio Vargas, São Paulo, 2012.http://hdl.handle.net/10438/10279With the purpose of contributing to the literature about regulation of infrastructure sectors, this paper shows an analysis of the regulatory model used to enable the expansion of the electrical energy transmission capacity in Brazil. In this country, of continental dimensions, the transmission sector plays a vital role enabling the electrical energy supply and, thus, enabling a sustainable growth path for the economic activity. Large amounts of energy are transmitted among generator units, mainly hydroelectric power plants, which, in many cases, are located in regions quite faraway from big consumption centers. Due to the similarity among continental dimensions and volumes of energy produced and consumed, the regulatory models used for the expansion of the transmission in Brazil and Argentina are compared. Institutional and political system aspects in both countries are highlighted in order to explain the differences between the two models as well as the results achieved in each country. In this case, the challenges are highlighted for the expansion of the transmission infrastructure of high tension and large extensions in the Argentinean case, as well as the advantages of the Brazilian model that matches auctioning and a centralized planning mechanism. The peculiarities of the Brazilian regulatory model, mainly concerning the hybrid model of transmission award agreement auctions, along with periodical reviews of investor's revenue, get special attention. Through an analysis of the bids presented in the auctions carried out in Brazil between 2002 and 2008, the reaction of participants is tested as regards the change in the regulatory model introduced in 2006, when the periodical tariff review was introduced in award agreements for transmission services. With this change, participants have not increased the value of their bids at the auctions, indicating that there has not been an increase in the perception of the business risk for investors due to this regulatory change. The information used by the participants to present their bids, in the auction model for transmission expansion in Brazil, is analyzed through an extended sample of the bids presented between 1999-2011. Empirical evidences are found that the participants' bids are correlated, indicating that they take competitors' bids into account in order to elaborate their own bids.Com o objetivo de contribuir com a literatura sobre a regulação dos setores de infraestrutura, este trabalho apresenta uma análise do modelo regulatório utilizado para viabilizar a expansão de capacidade do setor de transmissão de energia elétrica no Brasil. Neste país, de dimensões continentais, o setor de transmissão tem um papel de fundamental importância para garantir o suprimento de energia elétrica e, consequentemente, para viabilizar uma trajetória de crescimento sustentável da atividade econômica. Grandes quantidades de energia são transportadas entre as unidades geradoras, principalmente hidroelétricas que, em muitos casos, estão localizadas em regiões bem distantes dos grandes centros de consumo. Devido à similaridade entre as dimensões continentais e os volumes de energia produzidos e consumidos, são comparados os modelos regulatórios utilizados para a expansão da transmissão no Brasil e Argentina. Aspectos institucionais e dos sistemas políticos nos dois países são ressaltados para explicar as diferenças entre os dois modelos e os resultados alcançados em cada um dos países. Neste caso destacam-se os desafios para expansão da infraestrutura de transmissão de elevada tensão e grande extensão no caso argentino e os benefícios do modelo brasileiro que combina a realização de leilões com um mecanismo de planejamento centralizado. As especificidades do modelo regulatório brasileiro, principalmente do modelo híbrido de leilões de contratos de concessões de transmissão, acompanhado de revisões periódicas da receita dos investidores têm especial atenção. Através de uma análise dos lances apresentados nos leilões realizados no Brasil entre 2002 e 2008, testa-se a reação dos participantes com relação à mudança no modelo regulatório introduzida em 2006, ano em que foi introduzida a revisão tarifária periódica nos contratos de concessão para serviços de transmissão. Evidencia-se que, com esta mudança, os participantes não diminuíram os deságios praticados nos leilões, indicando que não houve aumento da percepção de risco do negócio para os investidores devido a esta mudança na regulação. As informações utilizadas pelos participantes para formulação dos lances, no modelo de leilões para a expansão da transmissão no Brasil, são analisadas através de uma amostra ampliada dos lances apresentados no período 1999-2011. Encontram-se evidências empíricas de que os lances dos participantes são correlacionados, indicando que estes levam em consideração os lances dos seus competidores para formulação de seus próprios lances.porElectrical energyTransmissionRegulationAuctionsEnergia elétricaTransmissãoRegulamentaçãoConcessõesLeilõesAdministração públicaEnergia elétrica - TransmissãoEnergia elétrica - Transmissão - BrasilEnergia elétrica - Brasil - RegulamentaçãoEnergia elétrica - Concessões - BrasilLeilõesA utilização de leilões em modelos de expansão da rede de transmissão de energia elétricainfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/doctoralThesisreponame:Repositório Institucional do FGV (FGV Repositório Digital)instname:Fundação Getulio Vargas (FGV)instacron:FGVinfo:eu-repo/semantics/openAccessORIGINALTESE_FINAL_versao final.pdfTESE_FINAL_versao final.pdfapplication/pdf1970825https://repositorio.fgv.br/bitstreams/d2a31bdf-9dad-4c52-82d2-98712e2ad6d2/download9eb828cc4cae7a7908af2fbff6d27c8aMD51LICENSElicense.txtlicense.txttext/plain; charset=utf-84707https://repositorio.fgv.br/bitstreams/ce1ff927-1ba1-41b9-bc2d-35e33c22b193/downloaddfb340242cced38a6cca06c627998fa1MD52TEXTTESE_FINAL_versao final.pdf.txtTESE_FINAL_versao final.pdf.txtExtracted texttext/plain103243https://repositorio.fgv.br/bitstreams/5bbfc0d9-521e-47a5-b2be-f2cc6a42662e/download26c46af0e8e47f5e562cb8f4d5ca2160MD57THUMBNAILTESE_FINAL_versao final.pdf.jpgTESE_FINAL_versao final.pdf.jpgGenerated Thumbnailimage/jpeg2791https://repositorio.fgv.br/bitstreams/4576a84d-8107-48dd-b491-546896d222d6/download421986d1b5da8ec77c5520f47f35ce09MD5810438/102792023-11-08 18:20:52.091open.accessoai:repositorio.fgv.br:10438/10279https://repositorio.fgv.brRepositório InstitucionalPRIhttp://bibliotecadigital.fgv.br/dspace-oai/requestopendoar:39742023-11-08T18:20:52Repositório Institucional do FGV (FGV Repositório Digital) - Fundação Getulio Vargas (FGV)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
dc.title.por.fl_str_mv A utilização de leilões em modelos de expansão da rede de transmissão de energia elétrica
title A utilização de leilões em modelos de expansão da rede de transmissão de energia elétrica
spellingShingle A utilização de leilões em modelos de expansão da rede de transmissão de energia elétrica
Paulo, Goret Pereira
Electrical energy
Transmission
Regulation
Auctions
Energia elétrica
Transmissão
Regulamentação
Concessões
Leilões
Administração pública
Energia elétrica - Transmissão
Energia elétrica - Transmissão - Brasil
Energia elétrica - Brasil - Regulamentação
Energia elétrica - Concessões - Brasil
Leilões
title_short A utilização de leilões em modelos de expansão da rede de transmissão de energia elétrica
title_full A utilização de leilões em modelos de expansão da rede de transmissão de energia elétrica
title_fullStr A utilização de leilões em modelos de expansão da rede de transmissão de energia elétrica
title_full_unstemmed A utilização de leilões em modelos de expansão da rede de transmissão de energia elétrica
title_sort A utilização de leilões em modelos de expansão da rede de transmissão de energia elétrica
author Paulo, Goret Pereira
author_facet Paulo, Goret Pereira
author_role author
dc.contributor.unidadefgv.por.fl_str_mv Escolas::EAESP
dc.contributor.member.none.fl_str_mv Abrucio, Fernando Luiz
Avelino Filho, George
Pereira, Carlos
Lucinda, Cláudio Ribeiro de
dc.contributor.author.fl_str_mv Paulo, Goret Pereira
dc.contributor.advisor1.fl_str_mv Biderman, Ciro
contributor_str_mv Biderman, Ciro
dc.subject.eng.fl_str_mv Electrical energy
Transmission
Regulation
Auctions
topic Electrical energy
Transmission
Regulation
Auctions
Energia elétrica
Transmissão
Regulamentação
Concessões
Leilões
Administração pública
Energia elétrica - Transmissão
Energia elétrica - Transmissão - Brasil
Energia elétrica - Brasil - Regulamentação
Energia elétrica - Concessões - Brasil
Leilões
dc.subject.por.fl_str_mv Energia elétrica
Transmissão
Regulamentação
Concessões
Leilões
dc.subject.area.por.fl_str_mv Administração pública
dc.subject.bibliodata.por.fl_str_mv Energia elétrica - Transmissão
Energia elétrica - Transmissão - Brasil
Energia elétrica - Brasil - Regulamentação
Energia elétrica - Concessões - Brasil
Leilões
description With the purpose of contributing to the literature about regulation of infrastructure sectors, this paper shows an analysis of the regulatory model used to enable the expansion of the electrical energy transmission capacity in Brazil. In this country, of continental dimensions, the transmission sector plays a vital role enabling the electrical energy supply and, thus, enabling a sustainable growth path for the economic activity. Large amounts of energy are transmitted among generator units, mainly hydroelectric power plants, which, in many cases, are located in regions quite faraway from big consumption centers. Due to the similarity among continental dimensions and volumes of energy produced and consumed, the regulatory models used for the expansion of the transmission in Brazil and Argentina are compared. Institutional and political system aspects in both countries are highlighted in order to explain the differences between the two models as well as the results achieved in each country. In this case, the challenges are highlighted for the expansion of the transmission infrastructure of high tension and large extensions in the Argentinean case, as well as the advantages of the Brazilian model that matches auctioning and a centralized planning mechanism. The peculiarities of the Brazilian regulatory model, mainly concerning the hybrid model of transmission award agreement auctions, along with periodical reviews of investor's revenue, get special attention. Through an analysis of the bids presented in the auctions carried out in Brazil between 2002 and 2008, the reaction of participants is tested as regards the change in the regulatory model introduced in 2006, when the periodical tariff review was introduced in award agreements for transmission services. With this change, participants have not increased the value of their bids at the auctions, indicating that there has not been an increase in the perception of the business risk for investors due to this regulatory change. The information used by the participants to present their bids, in the auction model for transmission expansion in Brazil, is analyzed through an extended sample of the bids presented between 1999-2011. Empirical evidences are found that the participants' bids are correlated, indicating that they take competitors' bids into account in order to elaborate their own bids.
publishDate 2012
dc.date.accessioned.fl_str_mv 2012-12-14T12:10:56Z
dc.date.available.fl_str_mv 2012-12-14T12:10:56Z
dc.date.issued.fl_str_mv 2012-08-15
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/doctoralThesis
format doctoralThesis
status_str publishedVersion
dc.identifier.citation.fl_str_mv PAULO, Goret Pereira. A utilização de leilões em modelos de expansão da rede de transmissão de energia elétrica. Tese (Doutorado em Administração Pública e Governo) - FGV - Fundação Getúlio Vargas, São Paulo, 2012.
dc.identifier.uri.fl_str_mv http://hdl.handle.net/10438/10279
identifier_str_mv PAULO, Goret Pereira. A utilização de leilões em modelos de expansão da rede de transmissão de energia elétrica. Tese (Doutorado em Administração Pública e Governo) - FGV - Fundação Getúlio Vargas, São Paulo, 2012.
url http://hdl.handle.net/10438/10279
dc.language.iso.fl_str_mv por
language por
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.source.none.fl_str_mv reponame:Repositório Institucional do FGV (FGV Repositório Digital)
instname:Fundação Getulio Vargas (FGV)
instacron:FGV
instname_str Fundação Getulio Vargas (FGV)
instacron_str FGV
institution FGV
reponame_str Repositório Institucional do FGV (FGV Repositório Digital)
collection Repositório Institucional do FGV (FGV Repositório Digital)
bitstream.url.fl_str_mv https://repositorio.fgv.br/bitstreams/d2a31bdf-9dad-4c52-82d2-98712e2ad6d2/download
https://repositorio.fgv.br/bitstreams/ce1ff927-1ba1-41b9-bc2d-35e33c22b193/download
https://repositorio.fgv.br/bitstreams/5bbfc0d9-521e-47a5-b2be-f2cc6a42662e/download
https://repositorio.fgv.br/bitstreams/4576a84d-8107-48dd-b491-546896d222d6/download
bitstream.checksum.fl_str_mv 9eb828cc4cae7a7908af2fbff6d27c8a
dfb340242cced38a6cca06c627998fa1
26c46af0e8e47f5e562cb8f4d5ca2160
421986d1b5da8ec77c5520f47f35ce09
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
MD5
repository.name.fl_str_mv Repositório Institucional do FGV (FGV Repositório Digital) - Fundação Getulio Vargas (FGV)
repository.mail.fl_str_mv
_version_ 1802749788988375040