Site selection process for new nuclear power plants-a method to support decision making and improving public participation
Autor(a) principal: | |
---|---|
Data de Publicação: | 2011 |
Outros Autores: | , , , |
Tipo de documento: | Artigo de conferência |
Idioma: | eng |
Título da fonte: | Repositório Institucional do IEN |
Texto Completo: | http://carpedien.ien.gov.br:8080/handle/ien/2435 |
Resumo: | The Brazilian Energy Plan (PNE 2030) that guides the Government in formulating its strategy for expanding energy supply by 2030 highlights the need for the Brazilian electrical system have more than 4,000 MW from nuclear sources by 2025. Therefore, the Government presented a proposal to build four more nuclear power plants with capacity of 1,000 MW each, at first, two in the Northeast and two in Southeast. The selection and site assessment are key parts of the installation process of a nuclear plant and may significantly affect the cost, public acceptance and safety of the facility during its entire life cycle. The result of this initial stage, it can even seriously affect program success. Wrong decisions in the process of site selection may also require a financial commitment to higher planned in a later phase of the project, besides causing extensive and expensive downtime. Select the location where these units will be built is not a trivial process, because involves the consideration of multiple criteria and judgments in addition to obtaining, organizing and managing a diverse range of data, both qualitative and quantitative, to assist in decision making and ensure that the site selected is the most appropriate in relation to safety and technical, economic and environmental feasibility. This paper presents an overview of the site selection process and its stages, the criteria involved in each step, the tools to support decision making that can be used and the difficulties in applying a formal process of decision making. Also discussed are ways to make the process more transparent and democratic, increasing public involvement as a way to improve acceptance and reduce opposition from various sectors of society, trying to minimize the expense and time involved in the implementation of undertakings of this kind. |
id |
IEN_e23d91baff53851462322f6d0b16a8d4 |
---|---|
oai_identifier_str |
oai:carpedien.ien.gov.br:ien/2435 |
network_acronym_str |
IEN |
network_name_str |
Repositório Institucional do IEN |
spelling |
Martins, Vivian B.Cunha, Tatiana S.Lamego, Francisco FernandoLapa, Celso Marcelo FranklinInstituto de Engenharia Nuclear2018-06-08T17:55:28Z2018-06-08T17:55:28Z2011-10http://carpedien.ien.gov.br:8080/handle/ien/2435Submitted by Marcele Costal de Castro (costalcastro@gmail.com) on 2018-06-08T17:55:28Z No. of bitstreams: 1 lection Process for New Nuclear Power Plants - a Method to Support Decision Making and Improving Public Participation.pdf: 243694 bytes, checksum: 7d77b50830d43d0e694e4f006c96f167 (MD5)Made available in DSpace on 2018-06-08T17:55:28Z (GMT). No. of bitstreams: 1 lection Process for New Nuclear Power Plants - a Method to Support Decision Making and Improving Public Participation.pdf: 243694 bytes, checksum: 7d77b50830d43d0e694e4f006c96f167 (MD5) Previous issue date: 2011-10The Brazilian Energy Plan (PNE 2030) that guides the Government in formulating its strategy for expanding energy supply by 2030 highlights the need for the Brazilian electrical system have more than 4,000 MW from nuclear sources by 2025. Therefore, the Government presented a proposal to build four more nuclear power plants with capacity of 1,000 MW each, at first, two in the Northeast and two in Southeast. The selection and site assessment are key parts of the installation process of a nuclear plant and may significantly affect the cost, public acceptance and safety of the facility during its entire life cycle. The result of this initial stage, it can even seriously affect program success. Wrong decisions in the process of site selection may also require a financial commitment to higher planned in a later phase of the project, besides causing extensive and expensive downtime. Select the location where these units will be built is not a trivial process, because involves the consideration of multiple criteria and judgments in addition to obtaining, organizing and managing a diverse range of data, both qualitative and quantitative, to assist in decision making and ensure that the site selected is the most appropriate in relation to safety and technical, economic and environmental feasibility. This paper presents an overview of the site selection process and its stages, the criteria involved in each step, the tools to support decision making that can be used and the difficulties in applying a formal process of decision making. Also discussed are ways to make the process more transparent and democratic, increasing public involvement as a way to improve acceptance and reduce opposition from various sectors of society, trying to minimize the expense and time involved in the implementation of undertakings of this kind.engInstituto de Engenharia NuclearIENBrasilINAC 2011Nuclear power plantsPublic participationBrasilian eletrical systemsSite selection process for new nuclear power plants-a method to support decision making and improving public participationinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/conferenceObjectV INACinfo:eu-repo/semantics/openAccessreponame:Repositório Institucional do IENinstname:Instituto de Engenharia Nuclearinstacron:IENLICENSElicense.txtlicense.txttext/plain; charset=utf-81748http://carpedien.ien.gov.br:8080/xmlui/bitstream/ien/2435/2/license.txt8a4605be74aa9ea9d79846c1fba20a33MD52ORIGINALlection Process for New Nuclear Power Plants - a Method to Support Decision Making and Improving Public Participation.pdflection Process for New Nuclear Power Plants - a Method to Support Decision Making and Improving Public Participation.pdfapplication/pdf243694http://carpedien.ien.gov.br:8080/xmlui/bitstream/ien/2435/1/lection+Process+for+New+Nuclear+Power+Plants+-+a+Method+to+Support+Decision+Making+and+Improving+Public+Participation.pdf7d77b50830d43d0e694e4f006c96f167MD51ien/2435oai:carpedien.ien.gov.br:ien/24352018-06-08 14:55:28.873Dspace IENlsales@ien.gov.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 |
dc.title.pt_BR.fl_str_mv |
Site selection process for new nuclear power plants-a method to support decision making and improving public participation |
title |
Site selection process for new nuclear power plants-a method to support decision making and improving public participation |
spellingShingle |
Site selection process for new nuclear power plants-a method to support decision making and improving public participation Martins, Vivian B. INAC 2011 Nuclear power plants Public participation Brasilian eletrical systems |
title_short |
Site selection process for new nuclear power plants-a method to support decision making and improving public participation |
title_full |
Site selection process for new nuclear power plants-a method to support decision making and improving public participation |
title_fullStr |
Site selection process for new nuclear power plants-a method to support decision making and improving public participation |
title_full_unstemmed |
Site selection process for new nuclear power plants-a method to support decision making and improving public participation |
title_sort |
Site selection process for new nuclear power plants-a method to support decision making and improving public participation |
author |
Martins, Vivian B. |
author_facet |
Martins, Vivian B. Cunha, Tatiana S. Lamego, Francisco Fernando Lapa, Celso Marcelo Franklin Instituto de Engenharia Nuclear |
author_role |
author |
author2 |
Cunha, Tatiana S. Lamego, Francisco Fernando Lapa, Celso Marcelo Franklin Instituto de Engenharia Nuclear |
author2_role |
author author author author |
dc.contributor.author.fl_str_mv |
Martins, Vivian B. Cunha, Tatiana S. Lamego, Francisco Fernando Lapa, Celso Marcelo Franklin Instituto de Engenharia Nuclear |
dc.subject.por.fl_str_mv |
INAC 2011 Nuclear power plants Public participation Brasilian eletrical systems |
topic |
INAC 2011 Nuclear power plants Public participation Brasilian eletrical systems |
dc.description.abstract.por.fl_txt_mv |
The Brazilian Energy Plan (PNE 2030) that guides the Government in formulating its strategy for expanding energy supply by 2030 highlights the need for the Brazilian electrical system have more than 4,000 MW from nuclear sources by 2025. Therefore, the Government presented a proposal to build four more nuclear power plants with capacity of 1,000 MW each, at first, two in the Northeast and two in Southeast. The selection and site assessment are key parts of the installation process of a nuclear plant and may significantly affect the cost, public acceptance and safety of the facility during its entire life cycle. The result of this initial stage, it can even seriously affect program success. Wrong decisions in the process of site selection may also require a financial commitment to higher planned in a later phase of the project, besides causing extensive and expensive downtime. Select the location where these units will be built is not a trivial process, because involves the consideration of multiple criteria and judgments in addition to obtaining, organizing and managing a diverse range of data, both qualitative and quantitative, to assist in decision making and ensure that the site selected is the most appropriate in relation to safety and technical, economic and environmental feasibility. This paper presents an overview of the site selection process and its stages, the criteria involved in each step, the tools to support decision making that can be used and the difficulties in applying a formal process of decision making. Also discussed are ways to make the process more transparent and democratic, increasing public involvement as a way to improve acceptance and reduce opposition from various sectors of society, trying to minimize the expense and time involved in the implementation of undertakings of this kind. |
description |
The Brazilian Energy Plan (PNE 2030) that guides the Government in formulating its strategy for expanding energy supply by 2030 highlights the need for the Brazilian electrical system have more than 4,000 MW from nuclear sources by 2025. Therefore, the Government presented a proposal to build four more nuclear power plants with capacity of 1,000 MW each, at first, two in the Northeast and two in Southeast. The selection and site assessment are key parts of the installation process of a nuclear plant and may significantly affect the cost, public acceptance and safety of the facility during its entire life cycle. The result of this initial stage, it can even seriously affect program success. Wrong decisions in the process of site selection may also require a financial commitment to higher planned in a later phase of the project, besides causing extensive and expensive downtime. Select the location where these units will be built is not a trivial process, because involves the consideration of multiple criteria and judgments in addition to obtaining, organizing and managing a diverse range of data, both qualitative and quantitative, to assist in decision making and ensure that the site selected is the most appropriate in relation to safety and technical, economic and environmental feasibility. This paper presents an overview of the site selection process and its stages, the criteria involved in each step, the tools to support decision making that can be used and the difficulties in applying a formal process of decision making. Also discussed are ways to make the process more transparent and democratic, increasing public involvement as a way to improve acceptance and reduce opposition from various sectors of society, trying to minimize the expense and time involved in the implementation of undertakings of this kind. |
publishDate |
2011 |
dc.date.issued.fl_str_mv |
2011-10 |
dc.date.accessioned.fl_str_mv |
2018-06-08T17:55:28Z |
dc.date.available.fl_str_mv |
2018-06-08T17:55:28Z |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/conferenceObject |
status_str |
publishedVersion |
format |
conferenceObject |
dc.identifier.uri.fl_str_mv |
http://carpedien.ien.gov.br:8080/handle/ien/2435 |
url |
http://carpedien.ien.gov.br:8080/handle/ien/2435 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.publisher.none.fl_str_mv |
Instituto de Engenharia Nuclear |
dc.publisher.initials.fl_str_mv |
IEN |
dc.publisher.country.fl_str_mv |
Brasil |
publisher.none.fl_str_mv |
Instituto de Engenharia Nuclear |
dc.source.none.fl_str_mv |
reponame:Repositório Institucional do IEN instname:Instituto de Engenharia Nuclear instacron:IEN |
reponame_str |
Repositório Institucional do IEN |
collection |
Repositório Institucional do IEN |
instname_str |
Instituto de Engenharia Nuclear |
instacron_str |
IEN |
institution |
IEN |
bitstream.url.fl_str_mv |
http://carpedien.ien.gov.br:8080/xmlui/bitstream/ien/2435/2/license.txt http://carpedien.ien.gov.br:8080/xmlui/bitstream/ien/2435/1/lection+Process+for+New+Nuclear+Power+Plants+-+a+Method+to+Support+Decision+Making+and+Improving+Public+Participation.pdf |
bitstream.checksum.fl_str_mv |
8a4605be74aa9ea9d79846c1fba20a33 7d77b50830d43d0e694e4f006c96f167 |
bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 |
repository.name.fl_str_mv |
Dspace IEN |
repository.mail.fl_str_mv |
lsales@ien.gov.br |
_version_ |
1656026994037489664 |