METHODOLOGY FOR OPTIMIZING THE LAYOUT OF ROOMS AND PILLARS – CASE STUDY URUCUM MINE

Detalhes bibliográficos
Autor(a) principal: NASCIMENTO, LUCAS
Data de Publicação: 2023
Tipo de documento: Artigo
Idioma: por
Título da fonte: Holos
Texto Completo: http://www2.ifrn.edu.br/ojs/index.php/HOLOS/article/view/15729
Resumo: For design of rooms and pillars in underground mining, traditional design methods are commonly used, which is not usually configured as the premise of the best geometry for maximum ore extraction. As an alternative, presents at a proposal for optimized layout redesign of rooms and pillars of a defined area at Urucum mine, a manganese mine, located in Corumbá-MS. This is possible by establishing ore recovery functions, whose variables are geometric with geotechnical and operational constraints. The combination of these recovery functions and constraints can be mathematically encoded in non-linear programming algorithms, with the main objective of maximizing mine recovery and obtaining the greatest possible utilization of the ore body. As a result of the optimization process using nonlinear mathematics, a new mine layout with higher profitability and maintenance of operational safety conditions is obtained.
id IFRN-3_f80b0e33eee7db611c60e6b668d8a364
oai_identifier_str oai:holos.ifrn.edu.br:article/15729
network_acronym_str IFRN-3
network_name_str Holos
repository_id_str
spelling METHODOLOGY FOR OPTIMIZING THE LAYOUT OF ROOMS AND PILLARS – CASE STUDY URUCUM MINEMETODOLOGIA PARA OTIMIZAÇÃO DE LEIAUTE DE CÂMARAS E PILARES – ESTUDO DE CASO MINA URUCUMCâmaras e Pilares, Método de Coates, Otimização de Recuperação de LavraFor design of rooms and pillars in underground mining, traditional design methods are commonly used, which is not usually configured as the premise of the best geometry for maximum ore extraction. As an alternative, presents at a proposal for optimized layout redesign of rooms and pillars of a defined area at Urucum mine, a manganese mine, located in Corumbá-MS. This is possible by establishing ore recovery functions, whose variables are geometric with geotechnical and operational constraints. The combination of these recovery functions and constraints can be mathematically encoded in non-linear programming algorithms, with the main objective of maximizing mine recovery and obtaining the greatest possible utilization of the ore body. As a result of the optimization process using nonlinear mathematics, a new mine layout with higher profitability and maintenance of operational safety conditions is obtained. Para dimensionamento de câmaras e pilares em mineração subterrânea, utiliza-se comumente métodos de dimensionamento tradicionais, o que não se configura, usualmente, como premissa da melhor geometria para a máxima extração do minério. Como alternativa, apresenta-se uma proposta de redimensionamento otimizado de leiaute das câmaras e pilares de uma área definida na mina Urucum, uma mina de manganês, situada em Corumbá-MS. Isto é possível estabelecendo funções de recuperação do minério, cujas variáveis são geométricas com restrições geotécnicas e operacionais. A combinação dessas funções de recuperação e das restrições pode ser codificada matematicamente em algoritmos de programação não linear, tendo como objetivo principal tornar máxima a recuperação da mina e obter o maior aproveitamento possível da jazida. Como resultado do processo de otimização utilizando matemática não linear, obtém-se um novo leiaute de mina com maior rentabilidade e manutenção das condições de segurança operacional.Instituto Federal de Educação, Ciência e Tecnologia do Rio Grande do Norte2023-12-27info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersiontextohttp://www2.ifrn.edu.br/ojs/index.php/HOLOS/article/view/1572910.15628/holos.2023.15729HOLOS; v. 6 n. 39 (2023): v.6 (2023)1807-1600reponame:Holosinstname:Instituto Federal do Rio Grande do Norte (IFRN)instacron:IFRNInglêsporRooms and Pillars, Coates Method, Recovery Optimization in MiningCâmaras e Pilares, Método de Coates, Otimização de Recuperação de Lavrahttps://creativecommons.org/licenses/by-nc-nd/4.0info:eu-repo/semantics/openAccessNASCIMENTO, LUCAS2023-12-27T23:07:38Zoai:holos.ifrn.edu.br:article/15729Revistahttp://www2.ifrn.edu.br/ojs/index.php/HOLOSPUBhttp://www2.ifrn.edu.br/ojs/index.php/HOLOS/oaiholos@ifrn.edu.br||jyp.leite@ifrn.edu.br||propi@ifrn.edu.br1807-16001518-1634opendoar:2023-12-27T23:07:38Holos - Instituto Federal do Rio Grande do Norte (IFRN)false
dc.title.none.fl_str_mv METHODOLOGY FOR OPTIMIZING THE LAYOUT OF ROOMS AND PILLARS – CASE STUDY URUCUM MINE
METODOLOGIA PARA OTIMIZAÇÃO DE LEIAUTE DE CÂMARAS E PILARES – ESTUDO DE CASO MINA URUCUM
title METHODOLOGY FOR OPTIMIZING THE LAYOUT OF ROOMS AND PILLARS – CASE STUDY URUCUM MINE
spellingShingle METHODOLOGY FOR OPTIMIZING THE LAYOUT OF ROOMS AND PILLARS – CASE STUDY URUCUM MINE
NASCIMENTO, LUCAS
Câmaras e Pilares, Método de Coates, Otimização de Recuperação de Lavra
title_short METHODOLOGY FOR OPTIMIZING THE LAYOUT OF ROOMS AND PILLARS – CASE STUDY URUCUM MINE
title_full METHODOLOGY FOR OPTIMIZING THE LAYOUT OF ROOMS AND PILLARS – CASE STUDY URUCUM MINE
title_fullStr METHODOLOGY FOR OPTIMIZING THE LAYOUT OF ROOMS AND PILLARS – CASE STUDY URUCUM MINE
title_full_unstemmed METHODOLOGY FOR OPTIMIZING THE LAYOUT OF ROOMS AND PILLARS – CASE STUDY URUCUM MINE
title_sort METHODOLOGY FOR OPTIMIZING THE LAYOUT OF ROOMS AND PILLARS – CASE STUDY URUCUM MINE
author NASCIMENTO, LUCAS
author_facet NASCIMENTO, LUCAS
author_role author
dc.contributor.author.fl_str_mv NASCIMENTO, LUCAS
dc.subject.por.fl_str_mv Câmaras e Pilares, Método de Coates, Otimização de Recuperação de Lavra
topic Câmaras e Pilares, Método de Coates, Otimização de Recuperação de Lavra
description For design of rooms and pillars in underground mining, traditional design methods are commonly used, which is not usually configured as the premise of the best geometry for maximum ore extraction. As an alternative, presents at a proposal for optimized layout redesign of rooms and pillars of a defined area at Urucum mine, a manganese mine, located in Corumbá-MS. This is possible by establishing ore recovery functions, whose variables are geometric with geotechnical and operational constraints. The combination of these recovery functions and constraints can be mathematically encoded in non-linear programming algorithms, with the main objective of maximizing mine recovery and obtaining the greatest possible utilization of the ore body. As a result of the optimization process using nonlinear mathematics, a new mine layout with higher profitability and maintenance of operational safety conditions is obtained.
publishDate 2023
dc.date.none.fl_str_mv 2023-12-27
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
texto
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://www2.ifrn.edu.br/ojs/index.php/HOLOS/article/view/15729
10.15628/holos.2023.15729
url http://www2.ifrn.edu.br/ojs/index.php/HOLOS/article/view/15729
identifier_str_mv 10.15628/holos.2023.15729
dc.language.iso.fl_str_mv Inglês
por
language_invalid_str_mv Inglês
language por
dc.rights.driver.fl_str_mv https://creativecommons.org/licenses/by-nc-nd/4.0
info:eu-repo/semantics/openAccess
rights_invalid_str_mv https://creativecommons.org/licenses/by-nc-nd/4.0
eu_rights_str_mv openAccess
dc.coverage.none.fl_str_mv Rooms and Pillars, Coates Method, Recovery Optimization in Mining
Câmaras e Pilares, Método de Coates, Otimização de Recuperação de Lavra
dc.publisher.none.fl_str_mv Instituto Federal de Educação, Ciência e Tecnologia do Rio Grande do Norte
publisher.none.fl_str_mv Instituto Federal de Educação, Ciência e Tecnologia do Rio Grande do Norte
dc.source.none.fl_str_mv HOLOS; v. 6 n. 39 (2023): v.6 (2023)
1807-1600
reponame:Holos
instname:Instituto Federal do Rio Grande do Norte (IFRN)
instacron:IFRN
instname_str Instituto Federal do Rio Grande do Norte (IFRN)
instacron_str IFRN
institution IFRN
reponame_str Holos
collection Holos
repository.name.fl_str_mv Holos - Instituto Federal do Rio Grande do Norte (IFRN)
repository.mail.fl_str_mv holos@ifrn.edu.br||jyp.leite@ifrn.edu.br||propi@ifrn.edu.br
_version_ 1798951616734298112