Study of event-driven and periodic rescheduling on a single machine with unexpected disruptions
Autor(a) principal: | |
---|---|
Data de Publicação: | 2019 |
Outros Autores: | , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Independent Journal of Management & Production |
Texto Completo: | http://www.ijmp.jor.br/index.php/ijmp/article/view/838 |
Resumo: | This paper studies the rescheduling problem of a single machine facing unexpected disruptions in order to determine which parameters can help reducing the negative impacts of these disruptions on schedule performance. A Genetic Algorithm (GA) is used to generate the initial schedule and the updated ones according to a reactive strategy. The performance of event-driven rescheduling and periodic rescheduling policies are compared in terms of total tardiness and total cost of rescheduling. Other factors that may affect rescheduling such as disruption time, disruption duration and number of disruptions are investigated. The sensitivity of results to both due date tightness and cost factor variation is tested. The results showed that the timing of the occurrence of disruption as related to scheduling horizon has a major effect on determining the best rescheduling policy. Event-driven policy is superior to other policies for short infrequent disruptions. It was found that the periodic policy is more appropriate for long and frequent disruptions. |
id |
IJMP_189c6e35e0cf83dc33d21ea42c5e2560 |
---|---|
oai_identifier_str |
oai:www.ijmp.jor.br:article/838 |
network_acronym_str |
IJMP |
network_name_str |
Independent Journal of Management & Production |
repository_id_str |
|
spelling |
Study of event-driven and periodic rescheduling on a single machine with unexpected disruptionsSingle machinereschedulingevent-drivenperiodicrescheduling frequencyThis paper studies the rescheduling problem of a single machine facing unexpected disruptions in order to determine which parameters can help reducing the negative impacts of these disruptions on schedule performance. A Genetic Algorithm (GA) is used to generate the initial schedule and the updated ones according to a reactive strategy. The performance of event-driven rescheduling and periodic rescheduling policies are compared in terms of total tardiness and total cost of rescheduling. Other factors that may affect rescheduling such as disruption time, disruption duration and number of disruptions are investigated. The sensitivity of results to both due date tightness and cost factor variation is tested. The results showed that the timing of the occurrence of disruption as related to scheduling horizon has a major effect on determining the best rescheduling policy. Event-driven policy is superior to other policies for short infrequent disruptions. It was found that the periodic policy is more appropriate for long and frequent disruptions.Independent2019-02-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdftext/htmlhttp://www.ijmp.jor.br/index.php/ijmp/article/view/83810.14807/ijmp.v10i1.838Independent Journal of Management & Production; Vol. 10 No. 1 (2019): Independent Journal of Management & Production; 158-1852236-269X2236-269Xreponame:Independent Journal of Management & Productioninstname:Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP)instacron:IJM&Penghttp://www.ijmp.jor.br/index.php/ijmp/article/view/838/967http://www.ijmp.jor.br/index.php/ijmp/article/view/838/986Copyright (c) 2019 Moaz Magdy Tawfeek, Yomna Mahmoud Sadek, Amin Mohamed Kamel El-kharbotlyinfo:eu-repo/semantics/openAccessTawfeek, Moaz MagdySadek, Yomna MahmoudEl-kharbotly, Amin Mohamed Kamel2019-02-01T11:14:04Zoai:www.ijmp.jor.br:article/838Revistahttp://www.ijmp.jor.br/PUBhttp://www.ijmp.jor.br/index.php/ijmp/oaiijmp@ijmp.jor.br||paulo@paulorodrigues.pro.br||2236-269X2236-269Xopendoar:2019-02-01T11:14:04Independent Journal of Management & Production - Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP)false |
dc.title.none.fl_str_mv |
Study of event-driven and periodic rescheduling on a single machine with unexpected disruptions |
title |
Study of event-driven and periodic rescheduling on a single machine with unexpected disruptions |
spellingShingle |
Study of event-driven and periodic rescheduling on a single machine with unexpected disruptions Tawfeek, Moaz Magdy Single machine rescheduling event-driven periodic rescheduling frequency |
title_short |
Study of event-driven and periodic rescheduling on a single machine with unexpected disruptions |
title_full |
Study of event-driven and periodic rescheduling on a single machine with unexpected disruptions |
title_fullStr |
Study of event-driven and periodic rescheduling on a single machine with unexpected disruptions |
title_full_unstemmed |
Study of event-driven and periodic rescheduling on a single machine with unexpected disruptions |
title_sort |
Study of event-driven and periodic rescheduling on a single machine with unexpected disruptions |
author |
Tawfeek, Moaz Magdy |
author_facet |
Tawfeek, Moaz Magdy Sadek, Yomna Mahmoud El-kharbotly, Amin Mohamed Kamel |
author_role |
author |
author2 |
Sadek, Yomna Mahmoud El-kharbotly, Amin Mohamed Kamel |
author2_role |
author author |
dc.contributor.author.fl_str_mv |
Tawfeek, Moaz Magdy Sadek, Yomna Mahmoud El-kharbotly, Amin Mohamed Kamel |
dc.subject.por.fl_str_mv |
Single machine rescheduling event-driven periodic rescheduling frequency |
topic |
Single machine rescheduling event-driven periodic rescheduling frequency |
description |
This paper studies the rescheduling problem of a single machine facing unexpected disruptions in order to determine which parameters can help reducing the negative impacts of these disruptions on schedule performance. A Genetic Algorithm (GA) is used to generate the initial schedule and the updated ones according to a reactive strategy. The performance of event-driven rescheduling and periodic rescheduling policies are compared in terms of total tardiness and total cost of rescheduling. Other factors that may affect rescheduling such as disruption time, disruption duration and number of disruptions are investigated. The sensitivity of results to both due date tightness and cost factor variation is tested. The results showed that the timing of the occurrence of disruption as related to scheduling horizon has a major effect on determining the best rescheduling policy. Event-driven policy is superior to other policies for short infrequent disruptions. It was found that the periodic policy is more appropriate for long and frequent disruptions. |
publishDate |
2019 |
dc.date.none.fl_str_mv |
2019-02-01 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://www.ijmp.jor.br/index.php/ijmp/article/view/838 10.14807/ijmp.v10i1.838 |
url |
http://www.ijmp.jor.br/index.php/ijmp/article/view/838 |
identifier_str_mv |
10.14807/ijmp.v10i1.838 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
http://www.ijmp.jor.br/index.php/ijmp/article/view/838/967 http://www.ijmp.jor.br/index.php/ijmp/article/view/838/986 |
dc.rights.driver.fl_str_mv |
Copyright (c) 2019 Moaz Magdy Tawfeek, Yomna Mahmoud Sadek, Amin Mohamed Kamel El-kharbotly info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Copyright (c) 2019 Moaz Magdy Tawfeek, Yomna Mahmoud Sadek, Amin Mohamed Kamel El-kharbotly |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf text/html |
dc.publisher.none.fl_str_mv |
Independent |
publisher.none.fl_str_mv |
Independent |
dc.source.none.fl_str_mv |
Independent Journal of Management & Production; Vol. 10 No. 1 (2019): Independent Journal of Management & Production; 158-185 2236-269X 2236-269X reponame:Independent Journal of Management & Production instname:Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP) instacron:IJM&P |
instname_str |
Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP) |
instacron_str |
IJM&P |
institution |
IJM&P |
reponame_str |
Independent Journal of Management & Production |
collection |
Independent Journal of Management & Production |
repository.name.fl_str_mv |
Independent Journal of Management & Production - Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP) |
repository.mail.fl_str_mv |
ijmp@ijmp.jor.br||paulo@paulorodrigues.pro.br|| |
_version_ |
1797220491840192512 |