Integration of risk analysis methods in aerospace research projects

Detalhes bibliográficos
Autor(a) principal: Borges, Sarah Francisca de Souza
Data de Publicação: 2022
Outros Autores: Belderrain, Mischel Carmen Neyra, Junior, Moacyr Machado Cardoso, Castilho, Diogo Silva
Tipo de documento: Artigo
Idioma: eng
Título da fonte: Independent Journal of Management & Production
Texto Completo: http://www.ijmp.jor.br/index.php/ijmp/article/view/1467
Resumo: Organizations are exposed to several types of risks, such as environmental, legal, operational, financial, and technological; that are subjected to epistemic uncertainty. In this context, a contemporary issue is how to deal with accidents, with greater difficulty in understanding the sociotechnical system, due to its complex and dynamic characteristics, in an attempt to prevent accidents based on components’ behavior. Although, for most complex systems and projects, a record of the exposure to hazards is incomplete or nonexistent, especially when it is highly innovative. This study developed a risk analysis framework for complex aerospace research projects by integrating different methods: problem structuring, safety control action analysis, and prioritization of results. Three methods are proposed: (1) Soft Systems Methodology (SSM) for initial review and understanding of the problem situation, and preliminary identification of hazards and losses; (2) Systems-Theoretic Process Analysis (STPA), to identify Unsafe Control Actions (UCAs) and their causal scenarios; and (3), Preferences Sorting Technique by Similarity to Ideal Solution (TOPSIS Fuzzy) for prioritization of the UCAs and mitigating causal scenarios. This proposal was applied to the Liquid Propulsion Injection Systems Laboratory (CEPROS), and, through the SSM, 7 hazards and 4 losses were found. On the other hand, the STPA method found 15 loops with 48 UCAs and 106 causal scenarios. In the end, it is recommended that the Decision Maker establishes a cut-off criterion, that is, a Hierarchy of Management and Control of the identified UCAs. The proposed methods follow the line of sociotechnical systems, considering the difficulty of the decision-maker for risk analysis in aerospace research projects. Thus, this work presents a structure of different methods covering the entire risk management process, increasing the difficulty in fulfilling the mission due to the level of complexity of the project, and supporting strategies for coordinated decision-making.
id IJMP_568e1b046818c494ddd7596bcb803bae
oai_identifier_str oai:www.ijmp.jor.br:article/1467
network_acronym_str IJMP
network_name_str Independent Journal of Management & Production
repository_id_str
spelling Integration of risk analysis methods in aerospace research projectsRisk analysisComplex problemProblem structuring.Organizations are exposed to several types of risks, such as environmental, legal, operational, financial, and technological; that are subjected to epistemic uncertainty. In this context, a contemporary issue is how to deal with accidents, with greater difficulty in understanding the sociotechnical system, due to its complex and dynamic characteristics, in an attempt to prevent accidents based on components’ behavior. Although, for most complex systems and projects, a record of the exposure to hazards is incomplete or nonexistent, especially when it is highly innovative. This study developed a risk analysis framework for complex aerospace research projects by integrating different methods: problem structuring, safety control action analysis, and prioritization of results. Three methods are proposed: (1) Soft Systems Methodology (SSM) for initial review and understanding of the problem situation, and preliminary identification of hazards and losses; (2) Systems-Theoretic Process Analysis (STPA), to identify Unsafe Control Actions (UCAs) and their causal scenarios; and (3), Preferences Sorting Technique by Similarity to Ideal Solution (TOPSIS Fuzzy) for prioritization of the UCAs and mitigating causal scenarios. This proposal was applied to the Liquid Propulsion Injection Systems Laboratory (CEPROS), and, through the SSM, 7 hazards and 4 losses were found. On the other hand, the STPA method found 15 loops with 48 UCAs and 106 causal scenarios. In the end, it is recommended that the Decision Maker establishes a cut-off criterion, that is, a Hierarchy of Management and Control of the identified UCAs. The proposed methods follow the line of sociotechnical systems, considering the difficulty of the decision-maker for risk analysis in aerospace research projects. Thus, this work presents a structure of different methods covering the entire risk management process, increasing the difficulty in fulfilling the mission due to the level of complexity of the project, and supporting strategies for coordinated decision-making.Independent2022-03-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdftext/htmlhttp://www.ijmp.jor.br/index.php/ijmp/article/view/146710.14807/ijmp.v13i1.1467Independent Journal of Management & Production; Vol. 13 No. 1 (2022): Independent Journal of Management & Production; 291-3202236-269X2236-269Xreponame:Independent Journal of Management & Productioninstname:Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP)instacron:IJM&Penghttp://www.ijmp.jor.br/index.php/ijmp/article/view/1467/2108http://www.ijmp.jor.br/index.php/ijmp/article/view/1467/2109Copyright (c) 2021 Sarah Francisca de Souza Borgeshttp://creativecommons.org/licenses/by-nc-sa/4.0info:eu-repo/semantics/openAccessBorges, Sarah Francisca de SouzaBelderrain, Mischel Carmen NeyraJunior, Moacyr Machado CardosoCastilho, Diogo Silva2022-03-01T10:34:36Zoai:www.ijmp.jor.br:article/1467Revistahttp://www.ijmp.jor.br/PUBhttp://www.ijmp.jor.br/index.php/ijmp/oaiijmp@ijmp.jor.br||paulo@paulorodrigues.pro.br||2236-269X2236-269Xopendoar:2022-03-01T10:34:36Independent Journal of Management & Production - Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP)false
dc.title.none.fl_str_mv Integration of risk analysis methods in aerospace research projects
title Integration of risk analysis methods in aerospace research projects
spellingShingle Integration of risk analysis methods in aerospace research projects
Borges, Sarah Francisca de Souza
Risk analysis
Complex problem
Problem structuring.
title_short Integration of risk analysis methods in aerospace research projects
title_full Integration of risk analysis methods in aerospace research projects
title_fullStr Integration of risk analysis methods in aerospace research projects
title_full_unstemmed Integration of risk analysis methods in aerospace research projects
title_sort Integration of risk analysis methods in aerospace research projects
author Borges, Sarah Francisca de Souza
author_facet Borges, Sarah Francisca de Souza
Belderrain, Mischel Carmen Neyra
Junior, Moacyr Machado Cardoso
Castilho, Diogo Silva
author_role author
author2 Belderrain, Mischel Carmen Neyra
Junior, Moacyr Machado Cardoso
Castilho, Diogo Silva
author2_role author
author
author
dc.contributor.author.fl_str_mv Borges, Sarah Francisca de Souza
Belderrain, Mischel Carmen Neyra
Junior, Moacyr Machado Cardoso
Castilho, Diogo Silva
dc.subject.por.fl_str_mv Risk analysis
Complex problem
Problem structuring.
topic Risk analysis
Complex problem
Problem structuring.
description Organizations are exposed to several types of risks, such as environmental, legal, operational, financial, and technological; that are subjected to epistemic uncertainty. In this context, a contemporary issue is how to deal with accidents, with greater difficulty in understanding the sociotechnical system, due to its complex and dynamic characteristics, in an attempt to prevent accidents based on components’ behavior. Although, for most complex systems and projects, a record of the exposure to hazards is incomplete or nonexistent, especially when it is highly innovative. This study developed a risk analysis framework for complex aerospace research projects by integrating different methods: problem structuring, safety control action analysis, and prioritization of results. Three methods are proposed: (1) Soft Systems Methodology (SSM) for initial review and understanding of the problem situation, and preliminary identification of hazards and losses; (2) Systems-Theoretic Process Analysis (STPA), to identify Unsafe Control Actions (UCAs) and their causal scenarios; and (3), Preferences Sorting Technique by Similarity to Ideal Solution (TOPSIS Fuzzy) for prioritization of the UCAs and mitigating causal scenarios. This proposal was applied to the Liquid Propulsion Injection Systems Laboratory (CEPROS), and, through the SSM, 7 hazards and 4 losses were found. On the other hand, the STPA method found 15 loops with 48 UCAs and 106 causal scenarios. In the end, it is recommended that the Decision Maker establishes a cut-off criterion, that is, a Hierarchy of Management and Control of the identified UCAs. The proposed methods follow the line of sociotechnical systems, considering the difficulty of the decision-maker for risk analysis in aerospace research projects. Thus, this work presents a structure of different methods covering the entire risk management process, increasing the difficulty in fulfilling the mission due to the level of complexity of the project, and supporting strategies for coordinated decision-making.
publishDate 2022
dc.date.none.fl_str_mv 2022-03-01
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://www.ijmp.jor.br/index.php/ijmp/article/view/1467
10.14807/ijmp.v13i1.1467
url http://www.ijmp.jor.br/index.php/ijmp/article/view/1467
identifier_str_mv 10.14807/ijmp.v13i1.1467
dc.language.iso.fl_str_mv eng
language eng
dc.relation.none.fl_str_mv http://www.ijmp.jor.br/index.php/ijmp/article/view/1467/2108
http://www.ijmp.jor.br/index.php/ijmp/article/view/1467/2109
dc.rights.driver.fl_str_mv Copyright (c) 2021 Sarah Francisca de Souza Borges
http://creativecommons.org/licenses/by-nc-sa/4.0
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Copyright (c) 2021 Sarah Francisca de Souza Borges
http://creativecommons.org/licenses/by-nc-sa/4.0
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
text/html
dc.publisher.none.fl_str_mv Independent
publisher.none.fl_str_mv Independent
dc.source.none.fl_str_mv Independent Journal of Management & Production; Vol. 13 No. 1 (2022): Independent Journal of Management & Production; 291-320
2236-269X
2236-269X
reponame:Independent Journal of Management & Production
instname:Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP)
instacron:IJM&P
instname_str Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP)
instacron_str IJM&P
institution IJM&P
reponame_str Independent Journal of Management & Production
collection Independent Journal of Management & Production
repository.name.fl_str_mv Independent Journal of Management & Production - Instituto Federal de Educação, Ciência e Tecnologia de São Paulo (IFSP)
repository.mail.fl_str_mv ijmp@ijmp.jor.br||paulo@paulorodrigues.pro.br||
_version_ 1797220493593411584