Resumo: | This study verifies the application of the management practices proposed in the PMBOK to the construction management of two major hydroelectric power plants in Brazil. Using the case study method, this research has allowed to assess management pratices concerning twenty-three PMBOK's selected propositions. The direct observations, the documents surveys and the interviews - using the 13 multiple-choice and the constructed-response questions - were the methods used to collect the required data and evidences. The job site managers, the executives of the head office and the consultant were interviewed so as to get different views of the information gathered. The research results attest that the management practices applied by managers in both studied projects are adherents to the PMBOK propositions. Moreover, it was possible to describe management practices related to time, cost, communication and to others relevant practices that were taken for granted by PMBOK. This study indicates that the references related to the project critical path, the project budget and the flexibility of the propositions of the PMBOK are among of prior aspects to be investigate in the future researches about project management.KEYWORDS: Project management; Project excellence; Hydroelectric power plant construction; PMBOK; Complex projects. |
id |
MACKENZIE_3587906328ae38f0ca5cad184639ff14 |
---|---|
oai_identifier_str |
oai:ojs.editorarevistas.mackenzie.br:article/194 |
network_acronym_str |
MACKENZIE |
network_name_str |
RAM. Revista de Administração Mackenzie |
repository_id_str |
|
spelling |
CONSTRUCTION MANAGEMENT EXCELENCE OF MAJORExcelência no gerenciamento de construção de hidrelétrica de grande porteThis study verifies the application of the management practices proposed in the PMBOK to the construction management of two major hydroelectric power plants in Brazil. Using the case study method, this research has allowed to assess management pratices concerning twenty-three PMBOK's selected propositions. The direct observations, the documents surveys and the interviews - using the 13 multiple-choice and the constructed-response questions - were the methods used to collect the required data and evidences. The job site managers, the executives of the head office and the consultant were interviewed so as to get different views of the information gathered. The research results attest that the management practices applied by managers in both studied projects are adherents to the PMBOK propositions. Moreover, it was possible to describe management practices related to time, cost, communication and to others relevant practices that were taken for granted by PMBOK. This study indicates that the references related to the project critical path, the project budget and the flexibility of the propositions of the PMBOK are among of prior aspects to be investigate in the future researches about project management.KEYWORDS: Project management; Project excellence; Hydroelectric power plant construction; PMBOK; Complex projects.Este trabalho verifica a aplicação das práticas gerenciais descritas no PMBOK, na gestão da construção de duas hidrelétricas de grande porte no Brasil. Utilizando o método do estudo de caso, esta pesquisa permitiu a obtenção dos dados práticos referentes a 23 proposições selecionadas do PMBOK. O levantamento de campo, realizado em 2005, ocorreu por observação direta, coleta de documentos, entrevistas estruturadas e abertas. Visando à obtenção de dados sob perspectivas diferentes, foram selecionados para entrevista não só os gestores atuantes nos canteiros de obras dos dois projetos, mas também os executivos da matriz e um consultor. Os resultados atestam que as práticas de gerenciamento adotadas pelos gestores dos dois projetos, caso objeto deste estudo, são aderentes às proposições do PMBOK. Obteve-se também a descrição das práticas de gerenciamento de tempo, custo, comunicação e outras práticas relevantes não contempladas pelo modelo PMBOK. O trabalho permite recomendar que os referenciais relativos a caminho crítico, orçamento e flexibilização das proposições do PMBOK estão entre os aspectos prioritários a serem investigados em futuras pesquisas sobre gerenciamento de projetos. PALAVRAS-CHAVE Gerenciamento de projetos; Excelência em projeto; Construção de hidrelétrica; PMBOK; Projetos complexos.Editora Mackenzie2008-11-26info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfapplication/pdfapplication/pdfhttps://editorarevistas.mackenzie.br/index.php/RAM/article/view/194Revista de Administração Mackenzie; Vol. 9 No. 6 (2008)Revista de Administração Mackenzie; Vol. 9 Núm. 6 (2008)Revista de Administração Mackenzie (Mackenzie Management Review); v. 9 n. 6 (2008)1678-69711518-6776reponame:RAM. Revista de Administração Mackenzieinstname:Universidade Presbiteriana Mackenzie (MACKENZIE)instacron:MACKENZIEporengspahttps://editorarevistas.mackenzie.br/index.php/RAM/article/view/194/194https://editorarevistas.mackenzie.br/index.php/RAM/article/view/194/1703https://editorarevistas.mackenzie.br/index.php/RAM/article/view/194/1704Copyright (c) 2015 Revista de Administração Mackenzieinfo:eu-repo/semantics/openAccessOkabayashi, AntonioCastelhano Bruno, Marcos AlbertoSbragia, Roberto2011-01-18T13:11:39Zoai:ojs.editorarevistas.mackenzie.br:article/194Revistahttps://editorarevistas.mackenzie.br/index.php/RAM/PUBhttps://editorarevistas.mackenzie.br/index.php/RAM/oairevista.adm@mackenzie.br1678-69711518-6776opendoar:2011-01-18T13:11:39RAM. Revista de Administração Mackenzie - Universidade Presbiteriana Mackenzie (MACKENZIE)false |
dc.title.none.fl_str_mv |
CONSTRUCTION MANAGEMENT EXCELENCE OF MAJOR Excelência no gerenciamento de construção de hidrelétrica de grande porte |
title |
CONSTRUCTION MANAGEMENT EXCELENCE OF MAJOR |
spellingShingle |
CONSTRUCTION MANAGEMENT EXCELENCE OF MAJOR Okabayashi, Antonio |
title_short |
CONSTRUCTION MANAGEMENT EXCELENCE OF MAJOR |
title_full |
CONSTRUCTION MANAGEMENT EXCELENCE OF MAJOR |
title_fullStr |
CONSTRUCTION MANAGEMENT EXCELENCE OF MAJOR |
title_full_unstemmed |
CONSTRUCTION MANAGEMENT EXCELENCE OF MAJOR |
title_sort |
CONSTRUCTION MANAGEMENT EXCELENCE OF MAJOR |
author |
Okabayashi, Antonio |
author_facet |
Okabayashi, Antonio Castelhano Bruno, Marcos Alberto Sbragia, Roberto |
author_role |
author |
author2 |
Castelhano Bruno, Marcos Alberto Sbragia, Roberto |
author2_role |
author author |
dc.contributor.author.fl_str_mv |
Okabayashi, Antonio Castelhano Bruno, Marcos Alberto Sbragia, Roberto |
description |
This study verifies the application of the management practices proposed in the PMBOK to the construction management of two major hydroelectric power plants in Brazil. Using the case study method, this research has allowed to assess management pratices concerning twenty-three PMBOK's selected propositions. The direct observations, the documents surveys and the interviews - using the 13 multiple-choice and the constructed-response questions - were the methods used to collect the required data and evidences. The job site managers, the executives of the head office and the consultant were interviewed so as to get different views of the information gathered. The research results attest that the management practices applied by managers in both studied projects are adherents to the PMBOK propositions. Moreover, it was possible to describe management practices related to time, cost, communication and to others relevant practices that were taken for granted by PMBOK. This study indicates that the references related to the project critical path, the project budget and the flexibility of the propositions of the PMBOK are among of prior aspects to be investigate in the future researches about project management.KEYWORDS: Project management; Project excellence; Hydroelectric power plant construction; PMBOK; Complex projects. |
publishDate |
2008 |
dc.date.none.fl_str_mv |
2008-11-26 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://editorarevistas.mackenzie.br/index.php/RAM/article/view/194 |
url |
https://editorarevistas.mackenzie.br/index.php/RAM/article/view/194 |
dc.language.iso.fl_str_mv |
por eng spa |
language |
por eng spa |
dc.relation.none.fl_str_mv |
https://editorarevistas.mackenzie.br/index.php/RAM/article/view/194/194 https://editorarevistas.mackenzie.br/index.php/RAM/article/view/194/1703 https://editorarevistas.mackenzie.br/index.php/RAM/article/view/194/1704 |
dc.rights.driver.fl_str_mv |
Copyright (c) 2015 Revista de Administração Mackenzie info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Copyright (c) 2015 Revista de Administração Mackenzie |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf application/pdf application/pdf |
dc.publisher.none.fl_str_mv |
Editora Mackenzie |
publisher.none.fl_str_mv |
Editora Mackenzie |
dc.source.none.fl_str_mv |
Revista de Administração Mackenzie; Vol. 9 No. 6 (2008) Revista de Administração Mackenzie; Vol. 9 Núm. 6 (2008) Revista de Administração Mackenzie (Mackenzie Management Review); v. 9 n. 6 (2008) 1678-6971 1518-6776 reponame:RAM. Revista de Administração Mackenzie instname:Universidade Presbiteriana Mackenzie (MACKENZIE) instacron:MACKENZIE |
instname_str |
Universidade Presbiteriana Mackenzie (MACKENZIE) |
instacron_str |
MACKENZIE |
institution |
MACKENZIE |
reponame_str |
RAM. Revista de Administração Mackenzie |
collection |
RAM. Revista de Administração Mackenzie |
repository.name.fl_str_mv |
RAM. Revista de Administração Mackenzie - Universidade Presbiteriana Mackenzie (MACKENZIE) |
repository.mail.fl_str_mv |
revista.adm@mackenzie.br |
_version_ |
1813820669102653440 |