Melhoria do desempenho da secção de cableamento de alumínio numa empresa de cabos elétricos
Autor(a) principal: | |
---|---|
Data de Publicação: | 2023 |
Tipo de documento: | Dissertação |
Idioma: | por |
Título da fonte: | Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
Texto Completo: | https://hdl.handle.net/1822/89071 |
Resumo: | Dissertação de mestrado em Engenharia e Gestão Industrial |
id |
RCAP_0f8779ec48d8c51794091c240b480db8 |
---|---|
oai_identifier_str |
oai:repositorium.sdum.uminho.pt:1822/89071 |
network_acronym_str |
RCAP |
network_name_str |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
repository_id_str |
7160 |
spelling |
Melhoria do desempenho da secção de cableamento de alumínio numa empresa de cabos elétricosImproving the performance of the aluminum cabling section in an electrical cable companyFerramentas LeanOEESMEDStandard workTempo de setupLean toolsSetup timesEngenharia e Tecnologia::Outras Engenharias e TecnologiasDissertação de mestrado em Engenharia e Gestão IndustrialA presente dissertação, inserida no âmbito do Mestrado em Engenharia e Gestão Industrial, foi desenvolvida em ambiente industrial na empresa Cabelte – Cabos Elétricos e Telefónicos S.A. seguindo a metodologia de investigação Action-Research. O objetivo principal do projeto foi a melhoria do desempenho da secção de cableamento de alumínio, mais precisamente da máquina cableadora CB101, devido ao seu baixo rendimento comparativamente às restantes máquinas da mesma secção. Deste modo, começou-se por analisar o sistema produtivo da empresa, de forma a obter uma visão geral do mesmo, recorrendo a ferramentas de diagnóstico e, de seguida, focou-se a análise na máquina CB101, detetando-se que o principal problema era o baixo rendimento desta, devido à grande quantidade de paragens e elevada duração das mesmas, principalmente por causa das mudanças de carga em cada um dos seus quatro corpos em diferentes momentos. Além disso, outros problemas detetados diziam respeito ao excesso de sucata, avarias da máquina e a não utilização do Overall Equipment Effectiveness (OEE) como indicador de medição da eficiência dos equipamentos. Com vista a solucionar o problema mais crítico encontrado, o tempo despendido em mudanças de carga, decidiu-se implementar mudanças de carga simultâneas para todos os corpos da máquina. Para a sua concretização foi necessário recorrer a ferramentas como o Single Minute Exchange of Die (SMED) e Standard Work. Foi ainda também utilizado o Algoritmo de Brooks para sequenciamento de operações, ao qual se efetuaram algumas modificações. A proposta de melhoria apresentada resultou numa redução diária de 43% e 51% no tempo de mudança de carga para o cabo 240 e 400, respetivamente, os dois tipos de cabo em estudo. Para além disso, o tempo diário de funcionamento da CB101 a velocidade reduzida, que ocorria antes e após cada mudança de carga, diminuiu 56%. Assim, conseguiu-se aumentar a produção da máquina em cerca de 10 toneladas diárias (55%) e, desta forma, também o valor do OEE aumentou em 45,3% para o cabo 400, não tendo sido possível obter resultados em tempo útil para o cabo 240.The following dissertation, within the scope of the Master's Degree in Industrial Engineering and Management, was developed in an industrial environment at the company Cabelte – Cabos Elétricos e Telefónicos S.A. following the Action-Research investigation methodology. The main objective of the project was to improve the performance of the aluminum cabling section, more precisely the CB101 cabling machine, due to its low performance compared to other machines in the same section. In this way, we began by analyzing the company's production system, in order to obtain an overview of it, using diagnostic tools and then, the analysis focused on the CB101 machine, from which it was detected that the main problem would be its low performance, due to the large number and long duration of stops, mainly due to the changes in load on each of its four bodies at different times. Furthermore, other problems detected concerned excess scrap, machine breakdowns and the non-use of Overall Equipment Effectiveness (OEE) as an indicator for measuring equipment efficiency. In order to solve the most critical problem encountered, the time spent changing loads, it was decided to implement simultaneous load changes for all bodies of the machine. To achieve this, it was necessary to use tools such as Single Minute Exchange of Die (SMED) and Standard Work. The Brooks Algorithm for sequencing operations was also used, to which some modifications were made. The improvement proposal presented resulted in a daily reduction of 43% and 51% in load change time for cable 240 and 400, respectively, the two types of cable under study. Furthermore, the CB101's daily operating time at reduced speed, which occurred before and after each load change, decreased by 56%. Thus, it was possible to increase the machine's production by around 10 tons per day (55%) and, in this way, the OEE value also increased by 45,3% for cable 400, while it was not possible to obtain results in a timely manner for cable 240.Sousa, Rui M.Universidade do MinhoGomes, Carla Maria Sousa2023-12-192023-12-19T00:00:00Zinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesisapplication/pdfhttps://hdl.handle.net/1822/89071por203533364info:eu-repo/semantics/openAccessreponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãoinstacron:RCAAP2024-03-02T01:19:13Zoai:repositorium.sdum.uminho.pt:1822/89071Portal AgregadorONGhttps://www.rcaap.pt/oai/openaireopendoar:71602024-03-20T03:11:42.891855Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãofalse |
dc.title.none.fl_str_mv |
Melhoria do desempenho da secção de cableamento de alumínio numa empresa de cabos elétricos Improving the performance of the aluminum cabling section in an electrical cable company |
title |
Melhoria do desempenho da secção de cableamento de alumínio numa empresa de cabos elétricos |
spellingShingle |
Melhoria do desempenho da secção de cableamento de alumínio numa empresa de cabos elétricos Gomes, Carla Maria Sousa Ferramentas Lean OEE SMED Standard work Tempo de setup Lean tools Setup times Engenharia e Tecnologia::Outras Engenharias e Tecnologias |
title_short |
Melhoria do desempenho da secção de cableamento de alumínio numa empresa de cabos elétricos |
title_full |
Melhoria do desempenho da secção de cableamento de alumínio numa empresa de cabos elétricos |
title_fullStr |
Melhoria do desempenho da secção de cableamento de alumínio numa empresa de cabos elétricos |
title_full_unstemmed |
Melhoria do desempenho da secção de cableamento de alumínio numa empresa de cabos elétricos |
title_sort |
Melhoria do desempenho da secção de cableamento de alumínio numa empresa de cabos elétricos |
author |
Gomes, Carla Maria Sousa |
author_facet |
Gomes, Carla Maria Sousa |
author_role |
author |
dc.contributor.none.fl_str_mv |
Sousa, Rui M. Universidade do Minho |
dc.contributor.author.fl_str_mv |
Gomes, Carla Maria Sousa |
dc.subject.por.fl_str_mv |
Ferramentas Lean OEE SMED Standard work Tempo de setup Lean tools Setup times Engenharia e Tecnologia::Outras Engenharias e Tecnologias |
topic |
Ferramentas Lean OEE SMED Standard work Tempo de setup Lean tools Setup times Engenharia e Tecnologia::Outras Engenharias e Tecnologias |
description |
Dissertação de mestrado em Engenharia e Gestão Industrial |
publishDate |
2023 |
dc.date.none.fl_str_mv |
2023-12-19 2023-12-19T00:00:00Z |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/masterThesis |
format |
masterThesis |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://hdl.handle.net/1822/89071 |
url |
https://hdl.handle.net/1822/89071 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.relation.none.fl_str_mv |
203533364 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.source.none.fl_str_mv |
reponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação instacron:RCAAP |
instname_str |
Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação |
instacron_str |
RCAAP |
institution |
RCAAP |
reponame_str |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
collection |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
repository.name.fl_str_mv |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação |
repository.mail.fl_str_mv |
|
_version_ |
1799137767372881920 |