Potencialização da ferramenta BIM no projeto de instalações de climatização
Autor(a) principal: | |
---|---|
Data de Publicação: | 2022 |
Tipo de documento: | Dissertação |
Idioma: | por |
Título da fonte: | Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
Texto Completo: | https://hdl.handle.net/1822/83546 |
Resumo: | Dissertação de mestrado integrado em Engenharia Mecânica |
id |
RCAP_402ffec888fec63380a60b1983f93e96 |
---|---|
oai_identifier_str |
oai:repositorium.sdum.uminho.pt:1822/83546 |
network_acronym_str |
RCAP |
network_name_str |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
repository_id_str |
7160 |
spelling |
Potencialização da ferramenta BIM no projeto de instalações de climatizaçãoBuilding information modeling (BIM)ClimatizaçãoHAPRevitVentilaçãoAir conditioningVentilationEngenharia e Tecnologia::Engenharia MecânicaDissertação de mestrado integrado em Engenharia MecânicaNos últimos anos verifica-se que, a industria da Arquitetura, Engenharia e Construção (AEC), apresenta muitos problemas em termos de eficiência de colaboração entre si. Contribuindo assim para inúmeros erros na altura de executar as obras e a incumprimento de prazos, que reflete num aumento substancial do custo final da obra. Desta forma, procurou-se encontrar melhores métodos de trabalho visando uma maior eficiência na fase de projeto. Perante esta problemática neste setor surge, a metodologia BIM (Building Information Modeling). A metodologia BIM vem introduzir novos métodos de trabalho através de um processo de controlo e gestão de toda a informação criada e desenvolvida entre os diversos intervenientes do setor AEC. Esta metodologia visa a criação de um modelo virtual/digital, onde contém toda a informação necessária, permitindo uma maior colaboração entre todas as especialidades e assim diminuir as incoerências logo na fase de projeto, evitando erros e omissões e, desperdícios de materiais na altura de executar a obra. Assim, a presente dissertação tem como objetivo a realização do projeto de climatização e ventilação de um edifício industrial com o intuito de demostrar as vantagens que a utilização da metodologia BIM trás para o projeto. O edifício alvo de estudo diz respeito a um caso real, disponibilizado pela empresa Tykhe Engenharia. Posto isto, primeiramente, realizou-se um estudo inicial ao caso de estudo, de forma a carateriza-lo em termos dos espaços interiores, da zona climática onde se insere bem como de todas as soluções construtivas que o constituem. Posteriormente, com recurso ao software HAP foi possível determinar as cargas térmicas do edifício bem como dimensionar os equipamentos de climatização e ventilação preconizados. Por fim, de forma a cumprir os objetivos propostos, aplicou-se a metodologia BIM ao projeto preconizado, no qual foi criado o modelo digital/virtual da solução em colaboração com o modelo BIM da arquitetura. Conclui-se que a utilização desta metodologia no projeto de climatização e ventilação trás inúmeras vantagens, nomeadamente uma maior automatização ao projeto. Através dos parâmetros contidos no modelo é possível extrair quantidades, criar tabelas de identificação, criar etiquetas nas peças desenhadas, dimensionar sistemas mecânicos e ainda obter pormenores das instalações para melhor entendimento do projeto.In recent years, the Architecture, Engineering and Construction (AEC) industry has presented many problems in terms of the efficiency of collaboration with each other. Thus contributing to the increase in errors at the time of execution of the works and the work charge, which reflects a substantial number of the final cost of deadlines. In this way, we sought to find working methods for greater efficiency in the design phase. Faced with this problem in this sector, the BIM (Building Information Modeling) methodology arises. The BIM methodology introduces new working methods through a process of control and management of all the information created and developed between the different actors of the AEC. This methodology aims to create a virtual/digital model, which contains a collaboration between all specialties and thus reduce as inferences right in the design phase of a virtual/digital model, which contains a collaboration between all specialties and thus reduce as inferences right in the design phase, configuration errors, omissions and material waste when carrying out a work. Thus, the present dissertation aims to carry out the air conditioning and ventilation project of an industrial with the objective of demonstrating the advantages that the use of the BIM methodology brings to the project. The target building of study concerns a real case, provided by the company Tykhe Engenharia. Having said that, firstly, an initial study was carried out on the case study, in order to characterize it in terms of the spaces that constitute it, the climatic zone where it is inserted, as well as all the constructive solutions that constitute it. Subsequently, using the HAP software, it was possible to determine the thermal loads of the building as well as dimension the recommended air conditioning and ventilation equipment. Finally, in order to fulfill the proposed objectives, the BIM methodology was applied to the recommended project, in which the digital/virtual model of the solution was created in collaboration with the BIM model of the architecture. It is concluded that the use of this methodology in the air conditioning and ventilation project brings numerous advantages, namely greater automation to the project. Because, through the parameters contained in the model, it is possible to extract quantities, create identification tables, create labels on the drawn parts, dimension mechanical systems and even obtain details of the installations for a better understanding of the project.Lobarinhas, Pedro M.Universidade do MinhoVieira, Edgar Daniel Fernandes20222022-01-01T00:00:00Zinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesisapplication/pdfhttps://hdl.handle.net/1822/83546por203243684info:eu-repo/semantics/openAccessreponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãoinstacron:RCAAP2023-07-21T12:27:23Zoai:repositorium.sdum.uminho.pt:1822/83546Portal AgregadorONGhttps://www.rcaap.pt/oai/openaireopendoar:71602024-03-19T19:21:57.889927Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãofalse |
dc.title.none.fl_str_mv |
Potencialização da ferramenta BIM no projeto de instalações de climatização |
title |
Potencialização da ferramenta BIM no projeto de instalações de climatização |
spellingShingle |
Potencialização da ferramenta BIM no projeto de instalações de climatização Vieira, Edgar Daniel Fernandes Building information modeling (BIM) Climatização HAP Revit Ventilação Air conditioning Ventilation Engenharia e Tecnologia::Engenharia Mecânica |
title_short |
Potencialização da ferramenta BIM no projeto de instalações de climatização |
title_full |
Potencialização da ferramenta BIM no projeto de instalações de climatização |
title_fullStr |
Potencialização da ferramenta BIM no projeto de instalações de climatização |
title_full_unstemmed |
Potencialização da ferramenta BIM no projeto de instalações de climatização |
title_sort |
Potencialização da ferramenta BIM no projeto de instalações de climatização |
author |
Vieira, Edgar Daniel Fernandes |
author_facet |
Vieira, Edgar Daniel Fernandes |
author_role |
author |
dc.contributor.none.fl_str_mv |
Lobarinhas, Pedro M. Universidade do Minho |
dc.contributor.author.fl_str_mv |
Vieira, Edgar Daniel Fernandes |
dc.subject.por.fl_str_mv |
Building information modeling (BIM) Climatização HAP Revit Ventilação Air conditioning Ventilation Engenharia e Tecnologia::Engenharia Mecânica |
topic |
Building information modeling (BIM) Climatização HAP Revit Ventilação Air conditioning Ventilation Engenharia e Tecnologia::Engenharia Mecânica |
description |
Dissertação de mestrado integrado em Engenharia Mecânica |
publishDate |
2022 |
dc.date.none.fl_str_mv |
2022 2022-01-01T00:00:00Z |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/masterThesis |
format |
masterThesis |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://hdl.handle.net/1822/83546 |
url |
https://hdl.handle.net/1822/83546 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.relation.none.fl_str_mv |
203243684 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.source.none.fl_str_mv |
reponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação instacron:RCAAP |
instname_str |
Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação |
instacron_str |
RCAAP |
institution |
RCAAP |
reponame_str |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
collection |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
repository.name.fl_str_mv |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação |
repository.mail.fl_str_mv |
|
_version_ |
1799132687811739648 |