O risco do custo e do tempo no escanamento de projetos

Detalhes bibliográficos
Autor(a) principal: Vieira, Andreia Cristina Ferreira
Data de Publicação: 2012
Tipo de documento: Dissertação
Idioma: por
Título da fonte: Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
Texto Completo: http://hdl.handle.net/10400.22/1153
Resumo: Dissertação apresentada ao Instituto Politécnico do Porto para obtenção do Grau de Mestre em Logística Orientada por: Prof. Dr. Pedro Godinho
id RCAP_4fbe37dbab8c6078a4dfa0327fad3a17
oai_identifier_str oai:recipp.ipp.pt:10400.22/1153
network_acronym_str RCAP
network_name_str Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
repository_id_str 7160
spelling O risco do custo e do tempo no escanamento de projetosDecisão em situação de incertezaCaminho críticoGestão de projetosCompromisso tempo/custoRuta críticaGestión de proyectosDecisión en condiciones de incertidumbreCompromiso de timpo/cuestoDecision under uncertaintyCritical pathProject managementTime / cost trade-offDissertação apresentada ao Instituto Politécnico do Porto para obtenção do Grau de Mestre em Logística Orientada por: Prof. Dr. Pedro GodinhoA gestão de projetos têm cada vez maior relevância e por isso há uma série de procedimentos a ter em atenção em cada projeto, nomeadamente na fase da programação. Neste trabalho, essa fase será escrutinada pelos vários métodos nela utilizados, particularmente o modelo CPM (Critical Path Method) e PERT (Program Evaluation and Review Technique). Todavia, tais modelos apresentam limitações quando aplicados na realidade devido à incerteza sempre patente (tanto em termos de custos, como de tempo). O CPM pressupõe custos e tempos conhecidos à partida, algo que geralmente não se passa em projetos reais. Apesar do PERT já considerar distribuições de probabilidades para a duração das atividades, assume também pressupostos sobre a forma destas distribuições que não se adequam à generalidade dos projetos. Sendo estes modelos os mais utilizados, há que ter presentes as suas limitações e as consequências destas. É por isso que será feita uma simulação onde serão analisados empiricamente os erros induzidos. Para além das limitações já referidas em relação aos métodos indicados, é ainda necessário ter em consideração que nenhum deles está vocacionado para apoiar decisões relativas à melhor forma de executar as diferentes tarefas, especialmente na presença de incerteza. Será apresentada (teoricamente) uma sugestão de modelo alternativo com capacidade para incorporar a incerteza nos custos e tempos esperados de um projeto e determinar as decisões ótimas a tomar relativamente à escolha do modo de execução das tarefas. Esse modelo multimodo, estocástico e dinâmico considerará que cada tarefa pode ser executada de diferentes modos. As decisões serão tomadas tendo em conta o momento do projeto em que nos encontramos. As principais conclusões obtidas foram que a escolha de uma correta distribuição na gestão de projetos é fundamental, não se pode ignorar a variância das atividades fora do caminho crítico e os modelos deterministas fornecem resultados muitas vezes erróneos.La gestión de proyectos tiene cada vez más relevancia y por eso hay un conjunto de procedimientos que hay que tener en cuenta en cada uno de los proyectos, nombradamente en la fase de la programación. En este trabajo, esa fase será escrudiñada por los varios métodos en ella utilizados, en particular el modelo CPM (Critical Path Method) y PERT (Program Evaluation and Review Technique). Sin embargo, tales modelos presentan limitaciones cuando aplicados a la realidad debido a la incertidumbre siempre existente (tanto en términos de los cuestos, como de tiempo). El CPM como lo sabemos supone cuestos y tiempos conocidos desde el inicio, y eso es algo que no ocurre en la realidad. Aunque el PERT ya considere probabilidades distintas, asume también suposiciones sobre la forma de distribución de probabilidades que no se adecuan a la generalidad de los proyectos. Siendo estos modelos los más utilizados, hay que tener en cuenta sus limitaciones y, a la vez, sus consecuencias. Por ello, se hará una simulación donde serán analizados empíricamente los errores inducidos. Además de las limitaciones ya referidas con relación a los métodos indicados, es necesario todavía, tener en cuenta que ninguno de ellos esta direccionado para apoyar decisiones relativas a la mejor forma de ejecutar las diferentes tareas, especialmente cuando existe la incertidumbre. Será presentada (en teoría) una sugerencia de modelo alternativo con capacidad para incorporar la incertidumbre de los cuestos y tiempos ya esperados de un proyecto y determinar las decisiones optimas a tomar con relación a la escoja del modo de ejecución de las tareas. Ese modelo multimodo, estocástico y dinámico considerará que cada tarea puede ser ejecutada de diferentes modos, y la escoja del modo tiene consecuencias en el tiempo y el cuesto de la ejecución de las tareas. Las decisiones se tomarán teniendo en cuenta el momento del proyecto en que nos encontramos. Las principales conclusiones fueron que la elección de una distribución correcta en la gestión de proyectos es fundamental, no podemos ignorar la variación de las actividades fuera de la ruta crítica y los modelos deterministas a veces ofrecen resultados incorrectos.Project management has become increasingly important and so there are several procedures to be taken into account in each project, especially in the programming phase. In the present work, this phase will be scrutinized by the various methods used in it, particularly the CPM (Critical Path Method) and PERT (Program Evaluation and Review Technique) models. However, these models have limitations when applied to real projects, due to the uncertainty that always exists (in terms of costs and time). In the CPM, costs and durations are assumed to be known at the outset, something that usually doesn’t happen in real projects. Although PERT considers probability distributions for the duration of activities, it also assumes distributions that don’t conform to most projects. Since these models are the most widely used, one must take into account their limitations and consequences of these. That's why some simulations will be performed in order to analyze empirically the errors induced by the models' assumptions. In addition to the aforementioned limitations in the methods indicated, it’s still necessary to consider that none of them is devoted to support decisions on the best way to perform different tasks, especially in the presence of uncertainty. An alternative model will also be presented (in theory), with the ability to incorporate uncertainty in the costs and expected time of a project, and determine the optimal decisions to be made regarding the choice of the mode of execution of tasks. This multimode model, stochastic and dynamic, considers that each task can be performed in different ways. Decisions will be made taking into account the time of the project in which we are. The main conclusions were that the choice of a correct distribution in project management is critical, we cannot ignore the variance of activities outside the critical path and deterministic models often provide erroneous results.Instituto Politécnico do Porto. Instituto Superior de Contabilidade e Administração do PortoGodinho, PedroRepositório Científico do Instituto Politécnico do PortoVieira, Andreia Cristina Ferreira2013-03-11T14:22:06Z20122012-01-01T00:00:00Zinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesisapplication/pdfhttp://hdl.handle.net/10400.22/1153porinfo:eu-repo/semantics/openAccessreponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãoinstacron:RCAAP2023-03-13T12:40:31Zoai:recipp.ipp.pt:10400.22/1153Portal AgregadorONGhttps://www.rcaap.pt/oai/openaireopendoar:71602024-03-19T17:22:21.675403Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãofalse
dc.title.none.fl_str_mv O risco do custo e do tempo no escanamento de projetos
title O risco do custo e do tempo no escanamento de projetos
spellingShingle O risco do custo e do tempo no escanamento de projetos
Vieira, Andreia Cristina Ferreira
Decisão em situação de incerteza
Caminho crítico
Gestão de projetos
Compromisso tempo/custo
Ruta crítica
Gestión de proyectos
Decisión en condiciones de incertidumbre
Compromiso de timpo/cuesto
Decision under uncertainty
Critical path
Project management
Time / cost trade-off
title_short O risco do custo e do tempo no escanamento de projetos
title_full O risco do custo e do tempo no escanamento de projetos
title_fullStr O risco do custo e do tempo no escanamento de projetos
title_full_unstemmed O risco do custo e do tempo no escanamento de projetos
title_sort O risco do custo e do tempo no escanamento de projetos
author Vieira, Andreia Cristina Ferreira
author_facet Vieira, Andreia Cristina Ferreira
author_role author
dc.contributor.none.fl_str_mv Godinho, Pedro
Repositório Científico do Instituto Politécnico do Porto
dc.contributor.author.fl_str_mv Vieira, Andreia Cristina Ferreira
dc.subject.por.fl_str_mv Decisão em situação de incerteza
Caminho crítico
Gestão de projetos
Compromisso tempo/custo
Ruta crítica
Gestión de proyectos
Decisión en condiciones de incertidumbre
Compromiso de timpo/cuesto
Decision under uncertainty
Critical path
Project management
Time / cost trade-off
topic Decisão em situação de incerteza
Caminho crítico
Gestão de projetos
Compromisso tempo/custo
Ruta crítica
Gestión de proyectos
Decisión en condiciones de incertidumbre
Compromiso de timpo/cuesto
Decision under uncertainty
Critical path
Project management
Time / cost trade-off
description Dissertação apresentada ao Instituto Politécnico do Porto para obtenção do Grau de Mestre em Logística Orientada por: Prof. Dr. Pedro Godinho
publishDate 2012
dc.date.none.fl_str_mv 2012
2012-01-01T00:00:00Z
2013-03-11T14:22:06Z
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/masterThesis
format masterThesis
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://hdl.handle.net/10400.22/1153
url http://hdl.handle.net/10400.22/1153
dc.language.iso.fl_str_mv por
language por
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Instituto Politécnico do Porto. Instituto Superior de Contabilidade e Administração do Porto
publisher.none.fl_str_mv Instituto Politécnico do Porto. Instituto Superior de Contabilidade e Administração do Porto
dc.source.none.fl_str_mv reponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação
instacron:RCAAP
instname_str Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação
instacron_str RCAAP
institution RCAAP
reponame_str Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
collection Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
repository.name.fl_str_mv Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação
repository.mail.fl_str_mv
_version_ 1799131318929326080