How to release orders in assembly job shops?

Detalhes bibliográficos
Autor(a) principal: Fernandes, Nuno Octávio Garcia
Data de Publicação: 2011
Outros Autores: Silva, Sílvio Carmo
Tipo de documento: Artigo
Idioma: eng
Título da fonte: Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
Texto Completo: http://hdl.handle.net/1822/15896
Resumo: This paper addresses the problem of controlling the production of complex products needing assembly operations. It presents a simulation study of how WLC release methods behave in an assembly job shop where due dates are set by customers. In particular two alternative strategies to drive the release of work orders are investigated, namely: (1) assigning the same due date and different planned release dates to each work order according to the routing length of each work order and (2) assigning the same due date and the same planned release date to each work order according to the routing length of the largest work order in the assembly order. These strategies are compared and assessed on the basis of two primary performance measures, i.e. total throughput time and mean absolute deviation of the lateness. Results contribute for understanding the implications of dealing with more complex environments than haven’t been dealt with in the past by WLC research.
id RCAP_664e11c2f344772bda19513821989410
oai_identifier_str oai:repositorium.sdum.uminho.pt:1822/15896
network_acronym_str RCAP
network_name_str Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
repository_id_str 7160
spelling How to release orders in assembly job shops?Workload controlAssembly job shopsSimulationThis paper addresses the problem of controlling the production of complex products needing assembly operations. It presents a simulation study of how WLC release methods behave in an assembly job shop where due dates are set by customers. In particular two alternative strategies to drive the release of work orders are investigated, namely: (1) assigning the same due date and different planned release dates to each work order according to the routing length of each work order and (2) assigning the same due date and the same planned release date to each work order according to the routing length of the largest work order in the assembly order. These strategies are compared and assessed on the basis of two primary performance measures, i.e. total throughput time and mean absolute deviation of the lateness. Results contribute for understanding the implications of dealing with more complex environments than haven’t been dealt with in the past by WLC research.Universidade do MinhoFundação para a Ciência e a Tecnologia (FCT)Institutul de Cercetara-Dezvoltare Pentru Mecatronica Si Tehnical Masurarii (INCDTM)Universidade do MinhoFernandes, Nuno Octávio GarciaSilva, Sílvio Carmo20112011-01-01T00:00:00Zinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleapplication/pdfapplication/pdfhttp://hdl.handle.net/1822/15896eng1584-5982http://www.cefin.ro/editura/revista/index.php?pag=show_articol&id_articol=362&lang=eninfo:eu-repo/semantics/openAccessreponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãoinstacron:RCAAP2023-07-21T12:08:27Zoai:repositorium.sdum.uminho.pt:1822/15896Portal AgregadorONGhttps://www.rcaap.pt/oai/openaireopendoar:71602024-03-19T18:59:39.903330Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãofalse
dc.title.none.fl_str_mv How to release orders in assembly job shops?
title How to release orders in assembly job shops?
spellingShingle How to release orders in assembly job shops?
Fernandes, Nuno Octávio Garcia
Workload control
Assembly job shops
Simulation
title_short How to release orders in assembly job shops?
title_full How to release orders in assembly job shops?
title_fullStr How to release orders in assembly job shops?
title_full_unstemmed How to release orders in assembly job shops?
title_sort How to release orders in assembly job shops?
author Fernandes, Nuno Octávio Garcia
author_facet Fernandes, Nuno Octávio Garcia
Silva, Sílvio Carmo
author_role author
author2 Silva, Sílvio Carmo
author2_role author
dc.contributor.none.fl_str_mv Universidade do Minho
dc.contributor.author.fl_str_mv Fernandes, Nuno Octávio Garcia
Silva, Sílvio Carmo
dc.subject.por.fl_str_mv Workload control
Assembly job shops
Simulation
topic Workload control
Assembly job shops
Simulation
description This paper addresses the problem of controlling the production of complex products needing assembly operations. It presents a simulation study of how WLC release methods behave in an assembly job shop where due dates are set by customers. In particular two alternative strategies to drive the release of work orders are investigated, namely: (1) assigning the same due date and different planned release dates to each work order according to the routing length of each work order and (2) assigning the same due date and the same planned release date to each work order according to the routing length of the largest work order in the assembly order. These strategies are compared and assessed on the basis of two primary performance measures, i.e. total throughput time and mean absolute deviation of the lateness. Results contribute for understanding the implications of dealing with more complex environments than haven’t been dealt with in the past by WLC research.
publishDate 2011
dc.date.none.fl_str_mv 2011
2011-01-01T00:00:00Z
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://hdl.handle.net/1822/15896
url http://hdl.handle.net/1822/15896
dc.language.iso.fl_str_mv eng
language eng
dc.relation.none.fl_str_mv 1584-5982
http://www.cefin.ro/editura/revista/index.php?pag=show_articol&id_articol=362&lang=en
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
application/pdf
dc.publisher.none.fl_str_mv Institutul de Cercetara-Dezvoltare Pentru Mecatronica Si Tehnical Masurarii (INCDTM)
publisher.none.fl_str_mv Institutul de Cercetara-Dezvoltare Pentru Mecatronica Si Tehnical Masurarii (INCDTM)
dc.source.none.fl_str_mv reponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação
instacron:RCAAP
instname_str Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação
instacron_str RCAAP
institution RCAAP
reponame_str Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
collection Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
repository.name.fl_str_mv Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação
repository.mail.fl_str_mv
_version_ 1799132389489770496