Component redundancy allocation in optimal cost preventive maintenance scheduling

Detalhes bibliográficos
Autor(a) principal: Siopa, Jorge Miguel Peralta
Data de Publicação: 2014
Outros Autores: Garção, José Eugénio Semedo, Silva, Júlio Montalvão e
Tipo de documento: Artigo
Idioma: eng
Título da fonte: Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
Texto Completo: http://hdl.handle.net/10174/12620
https://doi.org/10.1057/jors.2014.56
Resumo: This work presents a methodology to assist maintenance teams in defining the maintenance schedule and redundancy allocation that minimise the life-cycle average cost of a system. The minimal data required are three average costs and one reliability function. This methodology is useful in a system design phase, since in this situation data is usually scarce or inaccurate, but can also be applied in the exploration phase. It consists of an adaptation of the classical optimal age replacement method, combined with a redundancy allocation problem. A set of simple illustrative examples covering a variety of operating conditions is presented, demonstrating quantitatively the applicability of the methodology to a range of maintenance optimisation decisions.
id RCAP_79871a317a1c6a7a46e11bb340c3bd0e
oai_identifier_str oai:dspace.uevora.pt:10174/12620
network_acronym_str RCAP
network_name_str Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
repository_id_str 7160
spelling Component redundancy allocation in optimal cost preventive maintenance schedulinglife-cycle costmaintenanceoptimal age replacementredundancyreliabilityThis work presents a methodology to assist maintenance teams in defining the maintenance schedule and redundancy allocation that minimise the life-cycle average cost of a system. The minimal data required are three average costs and one reliability function. This methodology is useful in a system design phase, since in this situation data is usually scarce or inaccurate, but can also be applied in the exploration phase. It consists of an adaptation of the classical optimal age replacement method, combined with a redundancy allocation problem. A set of simple illustrative examples covering a variety of operating conditions is presented, demonstrating quantitatively the applicability of the methodology to a range of maintenance optimisation decisions.Journal of the Operational Research Society, Palgrave Macmillan2015-02-19T09:51:58Z2015-02-192014-06-18T00:00:00Zinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articlehttp://hdl.handle.net/10174/12620http://hdl.handle.net/10174/12620https://doi.org/10.1057/jors.2014.56eng@Article{Siopa, author="Siopa, J. M. P. and Garcao, J. E. S. and e S. J. M.", title="Maintenance schedule and redundancy allocation", journal="J Oper Res Soc", year="", month="", publisher="Palgrave Macmillan", volume="", number="", pages="--", issn="0160-5682",jorge.siopa@ipleiria.ptjesg@uevora.ptjulio.montalvao@ist.utl.pt285Siopa, Jorge Miguel PeraltaGarção, José Eugénio SemedoSilva, Júlio Montalvão einfo:eu-repo/semantics/openAccessreponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãoinstacron:RCAAP2024-01-03T18:56:35Zoai:dspace.uevora.pt:10174/12620Portal AgregadorONGhttps://www.rcaap.pt/oai/openaireopendoar:71602024-03-20T01:05:48.988760Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãofalse
dc.title.none.fl_str_mv Component redundancy allocation in optimal cost preventive maintenance scheduling
title Component redundancy allocation in optimal cost preventive maintenance scheduling
spellingShingle Component redundancy allocation in optimal cost preventive maintenance scheduling
Siopa, Jorge Miguel Peralta
life-cycle cost
maintenance
optimal age replacement
redundancy
reliability
title_short Component redundancy allocation in optimal cost preventive maintenance scheduling
title_full Component redundancy allocation in optimal cost preventive maintenance scheduling
title_fullStr Component redundancy allocation in optimal cost preventive maintenance scheduling
title_full_unstemmed Component redundancy allocation in optimal cost preventive maintenance scheduling
title_sort Component redundancy allocation in optimal cost preventive maintenance scheduling
author Siopa, Jorge Miguel Peralta
author_facet Siopa, Jorge Miguel Peralta
Garção, José Eugénio Semedo
Silva, Júlio Montalvão e
author_role author
author2 Garção, José Eugénio Semedo
Silva, Júlio Montalvão e
author2_role author
author
dc.contributor.author.fl_str_mv Siopa, Jorge Miguel Peralta
Garção, José Eugénio Semedo
Silva, Júlio Montalvão e
dc.subject.por.fl_str_mv life-cycle cost
maintenance
optimal age replacement
redundancy
reliability
topic life-cycle cost
maintenance
optimal age replacement
redundancy
reliability
description This work presents a methodology to assist maintenance teams in defining the maintenance schedule and redundancy allocation that minimise the life-cycle average cost of a system. The minimal data required are three average costs and one reliability function. This methodology is useful in a system design phase, since in this situation data is usually scarce or inaccurate, but can also be applied in the exploration phase. It consists of an adaptation of the classical optimal age replacement method, combined with a redundancy allocation problem. A set of simple illustrative examples covering a variety of operating conditions is presented, demonstrating quantitatively the applicability of the methodology to a range of maintenance optimisation decisions.
publishDate 2014
dc.date.none.fl_str_mv 2014-06-18T00:00:00Z
2015-02-19T09:51:58Z
2015-02-19
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://hdl.handle.net/10174/12620
http://hdl.handle.net/10174/12620
https://doi.org/10.1057/jors.2014.56
url http://hdl.handle.net/10174/12620
https://doi.org/10.1057/jors.2014.56
dc.language.iso.fl_str_mv eng
language eng
dc.relation.none.fl_str_mv @Article{Siopa, author="Siopa, J. M. P. and Garcao, J. E. S. and e S. J. M.", title="Maintenance schedule and redundancy allocation", journal="J Oper Res Soc", year="", month="", publisher="Palgrave Macmillan", volume="", number="", pages="--", issn="0160-5682",
jorge.siopa@ipleiria.pt
jesg@uevora.pt
julio.montalvao@ist.utl.pt
285
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.publisher.none.fl_str_mv Journal of the Operational Research Society, Palgrave Macmillan
publisher.none.fl_str_mv Journal of the Operational Research Society, Palgrave Macmillan
dc.source.none.fl_str_mv reponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação
instacron:RCAAP
instname_str Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação
instacron_str RCAAP
institution RCAAP
reponame_str Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
collection Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
repository.name.fl_str_mv Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação
repository.mail.fl_str_mv
_version_ 1799136543159353344