Building continuous improvement practices in a project management team through the application of lean office and design thinking concepts

Detalhes bibliográficos
Autor(a) principal: Teixeira, Joana Maria Pereira
Data de Publicação: 2023
Tipo de documento: Dissertação
Idioma: eng
Título da fonte: Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
Texto Completo: https://hdl.handle.net/1822/89061
Resumo: Dissertação de mestrado em Industrial Engineering and Management
id RCAP_a01c0ed3acb6eadea337723af2be0e26
oai_identifier_str oai:repositorium.sdum.uminho.pt:1822/89061
network_acronym_str RCAP
network_name_str Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
repository_id_str 7160
spelling Building continuous improvement practices in a project management team through the application of lean office and design thinking conceptsConstrução de práticas de melhoria contínua numa equipa de gestão de projetos através da aplicação de conceitos de lean office e design thinkingDesign thinkingContinuous improvementLean officeProject managementProcess standardizationInformation managementEngenharia e Tecnologia::Outras Engenharias e TecnologiasDissertação de mestrado em Industrial Engineering and ManagementConceitos como globalização e o próprio avanço da tecnologia trazem desafios para qualquer setor. Estes desafios requerem que as empresas abracem sistemas mais produtivos, quer em ambientes de fábrica ou em escritórios. O setor automóvel em específico tem vindo a sofrer enormes transformações nos últimos anos, tornando-se imprescindível que as equipas de trabalho possam ter fluxos de trabalho com a maior automatização possível e de valor acrescentado. O objetivo deste projeto, desenvolvido em colaboração entre a Universidade do Minho e a Bosch Car Multimedia S.A., foi a implementação de conceitos Lean Office com abordagens de Design Thinking numa equipa de gestão de projetos de industrialização. Recorrendo à metodologia de investigação-ação (Action Research), inicialmente elaborou-se um diagnóstico dos problemas e necessidades da equipa, seguido da implementação de algumas propostas de melhoria. A primeira ação implementada foi a criação de um sistema de melhoria contínua, através da divisão da equipa em quatro grupos, cada um abordando um tópico diferente. Os quatro grupos seguiram um plano comum de pontos de controlo para o resto da equipa, plano este baseado nos moldes do ciclo PDCA, ferramenta de Lean Office. Criou-se ainda uma plataforma interativa onde se poderiam adicionar e registar oportunidades de melhoria e tópicos a trabalhar. Aliado a isso, foi proposto um plano ou ciclo anual de melhoria contínua, onde a equipa anualmente revia os tópicos a trabalhar, através do uso da plataforma mencionada, com pontos de controlo e apresentações do status atual de cada tópico. Por último, mais numa vertente de gestão de informação e standardização de processos, criou-se uma página web partilhada por todos, com a centralização de instruções de trabalho, links e documentos. Durante a implementação destas propostas de melhoria, pretendeu-se envolver ao máximo as pessoas, considerando as suas opiniões e necessidades. Através da avaliação de resultados conduzida no final do projeto, concluiu-se que esse objetivo foi cumprido, que o trabalho da equipa foi facilitado e a melhoria contínua foi dinamizada.Concepts such as globalization and the very advance of technology bring challenges to any sector. These challenges require companies to embrace more productive systems, whether in factory or office environments. The automotive sector in particular has undergone enormous transformations in recent years, making it essential for work teams to have workflows with the greatest possible automation and added value. The aim of this project, developed in collaboration between the University of Minho and Bosch Car Multimedia S.A., was to implement Lean Office concepts with Design Thinking approaches in an industrialization project management team. Using action research methodology, a diagnosis of the team's problems and needs was initially drawn up, followed by the implementation of some proposals for improvement. The first action implemented was the creation of a continuous improvement system by dividing the team into four groups, each addressing a different topic. The four groups followed a common plan of control points for the rest of the team, a plan based on the PDCA cycle, a Lean Office tool. An interactive platform was also created where opportunities for improvement and topics to work on could be added and recorded. Allied to this, an annual continuous improvement plan or cycle was proposed, where the team would review the topics to be worked on every year, using the platform mentioned, with checkpoints and presentations of the current status of each topic. Lastly, with a view to managing information and standardizing processes, a web page was created that was shared by everyone, centralizing work instructions, links and documents. During the implementation of these improvement proposals, the aim was to involve people as much as possible, taking their opinions and needs into account. Through the evaluation of results conducted at the end of the project, it was concluded that this objective had been met, that the team's work had been facilitated and that continuous improvement had been boosted.Lima, Rui M.Domingues, José Pedro TeixeiraUniversidade do MinhoTeixeira, Joana Maria Pereira2023-12-062023-12-06T00:00:00Zinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesisapplication/pdfhttps://hdl.handle.net/1822/89061eng203532570info:eu-repo/semantics/openAccessreponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãoinstacron:RCAAP2024-03-02T01:19:04Zoai:repositorium.sdum.uminho.pt:1822/89061Portal AgregadorONGhttps://www.rcaap.pt/oai/openaireopendoar:71602024-03-20T03:11:41.780587Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãofalse
dc.title.none.fl_str_mv Building continuous improvement practices in a project management team through the application of lean office and design thinking concepts
Construção de práticas de melhoria contínua numa equipa de gestão de projetos através da aplicação de conceitos de lean office e design thinking
title Building continuous improvement practices in a project management team through the application of lean office and design thinking concepts
spellingShingle Building continuous improvement practices in a project management team through the application of lean office and design thinking concepts
Teixeira, Joana Maria Pereira
Design thinking
Continuous improvement
Lean office
Project management
Process standardization
Information management
Engenharia e Tecnologia::Outras Engenharias e Tecnologias
title_short Building continuous improvement practices in a project management team through the application of lean office and design thinking concepts
title_full Building continuous improvement practices in a project management team through the application of lean office and design thinking concepts
title_fullStr Building continuous improvement practices in a project management team through the application of lean office and design thinking concepts
title_full_unstemmed Building continuous improvement practices in a project management team through the application of lean office and design thinking concepts
title_sort Building continuous improvement practices in a project management team through the application of lean office and design thinking concepts
author Teixeira, Joana Maria Pereira
author_facet Teixeira, Joana Maria Pereira
author_role author
dc.contributor.none.fl_str_mv Lima, Rui M.
Domingues, José Pedro Teixeira
Universidade do Minho
dc.contributor.author.fl_str_mv Teixeira, Joana Maria Pereira
dc.subject.por.fl_str_mv Design thinking
Continuous improvement
Lean office
Project management
Process standardization
Information management
Engenharia e Tecnologia::Outras Engenharias e Tecnologias
topic Design thinking
Continuous improvement
Lean office
Project management
Process standardization
Information management
Engenharia e Tecnologia::Outras Engenharias e Tecnologias
description Dissertação de mestrado em Industrial Engineering and Management
publishDate 2023
dc.date.none.fl_str_mv 2023-12-06
2023-12-06T00:00:00Z
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/masterThesis
format masterThesis
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://hdl.handle.net/1822/89061
url https://hdl.handle.net/1822/89061
dc.language.iso.fl_str_mv eng
language eng
dc.relation.none.fl_str_mv 203532570
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.source.none.fl_str_mv reponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação
instacron:RCAAP
instname_str Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação
instacron_str RCAAP
institution RCAAP
reponame_str Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
collection Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
repository.name.fl_str_mv Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação
repository.mail.fl_str_mv
_version_ 1799137767344570368