Project portfolio risk categorisation – factor analysis results
Autor(a) principal: | |
---|---|
Data de Publicação: | 2022 |
Outros Autores: | |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
Texto Completo: | https://doi.org/10.12821/ijispm060403 |
Resumo: | The subject of this article is project portfolio risk categorisation. Research conducted indicated categories containing the most probable and significant risks. The research described in this paper was carried out in two stages. In the first stage, the relevant literature was reviewed and the Delphi method was used to identify 36 risks specific to a project portfolio. In the second stage, the respondents (project portfolio managers) assessed the probability of each risk occurring and the impact of that risk on the objectives of the project portfolio. The empirical data obtained in this way made it possible to conduct an exploratory factor analysis and to identify the risk categories of the project portfolio. The presented results may also contribute to a broader discussion concerning the validity of identifying project portfolio risks and how to categorise them. The results may be useful for further discussion on the empirical confirmation of three categories of portfolio risks proposed by the Project Management Institute. |
id |
RCAP_c374febc1bb6cfa6494254c7d54f6754 |
---|---|
oai_identifier_str |
oai:journals.uminho.pt:article/3808 |
network_acronym_str |
RCAP |
network_name_str |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
repository_id_str |
7160 |
spelling |
Project portfolio risk categorisation – factor analysis resultsproject portfolio riskportfolio risk categorizationfactor analysis resultsThe subject of this article is project portfolio risk categorisation. Research conducted indicated categories containing the most probable and significant risks. The research described in this paper was carried out in two stages. In the first stage, the relevant literature was reviewed and the Delphi method was used to identify 36 risks specific to a project portfolio. In the second stage, the respondents (project portfolio managers) assessed the probability of each risk occurring and the impact of that risk on the objectives of the project portfolio. The empirical data obtained in this way made it possible to conduct an exploratory factor analysis and to identify the risk categories of the project portfolio. The presented results may also contribute to a broader discussion concerning the validity of identifying project portfolio risks and how to categorise them. The results may be useful for further discussion on the empirical confirmation of three categories of portfolio risks proposed by the Project Management Institute.UMinho Editora2022-01-27info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleapplication/pdfhttps://doi.org/10.12821/ijispm060403https://doi.org/10.12821/ijispm060403International Journal of Information Systems and Project Management; Vol. 6 N.º 4 (2018); 39-58International Journal of Information Systems and Project Management; Vol. 6 No. 4 (2018); 39-582182-7788reponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãoinstacron:RCAAPenghttps://revistas.uminho.pt/index.php/ijispm/article/view/3808https://revistas.uminho.pt/index.php/ijispm/article/view/3808/3865Hofman, MariuszGrela, Grzegorzinfo:eu-repo/semantics/openAccess2023-03-23T11:57:48Zoai:journals.uminho.pt:article/3808Portal AgregadorONGhttps://www.rcaap.pt/oai/openaireopendoar:71602024-03-19T17:45:16.437238Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãofalse |
dc.title.none.fl_str_mv |
Project portfolio risk categorisation – factor analysis results |
title |
Project portfolio risk categorisation – factor analysis results |
spellingShingle |
Project portfolio risk categorisation – factor analysis results Hofman, Mariusz project portfolio risk portfolio risk categorization factor analysis results |
title_short |
Project portfolio risk categorisation – factor analysis results |
title_full |
Project portfolio risk categorisation – factor analysis results |
title_fullStr |
Project portfolio risk categorisation – factor analysis results |
title_full_unstemmed |
Project portfolio risk categorisation – factor analysis results |
title_sort |
Project portfolio risk categorisation – factor analysis results |
author |
Hofman, Mariusz |
author_facet |
Hofman, Mariusz Grela, Grzegorz |
author_role |
author |
author2 |
Grela, Grzegorz |
author2_role |
author |
dc.contributor.author.fl_str_mv |
Hofman, Mariusz Grela, Grzegorz |
dc.subject.por.fl_str_mv |
project portfolio risk portfolio risk categorization factor analysis results |
topic |
project portfolio risk portfolio risk categorization factor analysis results |
description |
The subject of this article is project portfolio risk categorisation. Research conducted indicated categories containing the most probable and significant risks. The research described in this paper was carried out in two stages. In the first stage, the relevant literature was reviewed and the Delphi method was used to identify 36 risks specific to a project portfolio. In the second stage, the respondents (project portfolio managers) assessed the probability of each risk occurring and the impact of that risk on the objectives of the project portfolio. The empirical data obtained in this way made it possible to conduct an exploratory factor analysis and to identify the risk categories of the project portfolio. The presented results may also contribute to a broader discussion concerning the validity of identifying project portfolio risks and how to categorise them. The results may be useful for further discussion on the empirical confirmation of three categories of portfolio risks proposed by the Project Management Institute. |
publishDate |
2022 |
dc.date.none.fl_str_mv |
2022-01-27 |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://doi.org/10.12821/ijispm060403 https://doi.org/10.12821/ijispm060403 |
url |
https://doi.org/10.12821/ijispm060403 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
https://revistas.uminho.pt/index.php/ijispm/article/view/3808 https://revistas.uminho.pt/index.php/ijispm/article/view/3808/3865 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
UMinho Editora |
publisher.none.fl_str_mv |
UMinho Editora |
dc.source.none.fl_str_mv |
International Journal of Information Systems and Project Management; Vol. 6 N.º 4 (2018); 39-58 International Journal of Information Systems and Project Management; Vol. 6 No. 4 (2018); 39-58 2182-7788 reponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação instacron:RCAAP |
instname_str |
Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação |
instacron_str |
RCAAP |
institution |
RCAAP |
reponame_str |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
collection |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
repository.name.fl_str_mv |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação |
repository.mail.fl_str_mv |
|
_version_ |
1799131537597267968 |