A two-level genetic algorithm for the multi-mode resource-constrained project scheduling problem
Autor(a) principal: | |
---|---|
Data de Publicação: | 2011 |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
Texto Completo: | http://hdl.handle.net/10400.22/4298 |
Resumo: | This paper presents a genetic algorithm for the multimode resource-constrained project scheduling problem (MRCPSP), in which multiple execution modes are available for each of the activities of the project. The objective function is the minimization of the construction project completion time. To solve the problem, is applied a two-level genetic algorithm, which makes use of two separate levels and extend the parameterized schedule generation scheme by introducing an improvement procedure. It is evaluated the quality of the schedule and present detailed comparative computational results for the MRCPSP, which reveal that this approach is a competitive algorithm. |
id |
RCAP_cfc1a255a8fe34ec10b279349a904edd |
---|---|
oai_identifier_str |
oai:recipp.ipp.pt:10400.22/4298 |
network_acronym_str |
RCAP |
network_name_str |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
repository_id_str |
7160 |
spelling |
A two-level genetic algorithm for the multi-mode resource-constrained project scheduling problemConstruction managementProject schedulingMulti-mode RCPSPResource constraintsGenetic algorithmsThis paper presents a genetic algorithm for the multimode resource-constrained project scheduling problem (MRCPSP), in which multiple execution modes are available for each of the activities of the project. The objective function is the minimization of the construction project completion time. To solve the problem, is applied a two-level genetic algorithm, which makes use of two separate levels and extend the parameterized schedule generation scheme by introducing an improvement procedure. It is evaluated the quality of the schedule and present detailed comparative computational results for the MRCPSP, which reveal that this approach is a competitive algorithm.University PressRepositório Científico do Instituto Politécnico do PortoMagalhães-Mendes, J.2014-04-01T15:32:02Z20112011-01-01T00:00:00Zinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleapplication/pdfhttp://hdl.handle.net/10400.22/4298eng2074-130810400.22/4298info:eu-repo/semantics/openAccessreponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãoinstacron:RCAAP2023-03-13T12:44:24Zoai:recipp.ipp.pt:10400.22/4298Portal AgregadorONGhttps://www.rcaap.pt/oai/openaireopendoar:71602024-03-19T17:25:11.540524Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãofalse |
dc.title.none.fl_str_mv |
A two-level genetic algorithm for the multi-mode resource-constrained project scheduling problem |
title |
A two-level genetic algorithm for the multi-mode resource-constrained project scheduling problem |
spellingShingle |
A two-level genetic algorithm for the multi-mode resource-constrained project scheduling problem Magalhães-Mendes, J. Construction management Project scheduling Multi-mode RCPSP Resource constraints Genetic algorithms |
title_short |
A two-level genetic algorithm for the multi-mode resource-constrained project scheduling problem |
title_full |
A two-level genetic algorithm for the multi-mode resource-constrained project scheduling problem |
title_fullStr |
A two-level genetic algorithm for the multi-mode resource-constrained project scheduling problem |
title_full_unstemmed |
A two-level genetic algorithm for the multi-mode resource-constrained project scheduling problem |
title_sort |
A two-level genetic algorithm for the multi-mode resource-constrained project scheduling problem |
author |
Magalhães-Mendes, J. |
author_facet |
Magalhães-Mendes, J. |
author_role |
author |
dc.contributor.none.fl_str_mv |
Repositório Científico do Instituto Politécnico do Porto |
dc.contributor.author.fl_str_mv |
Magalhães-Mendes, J. |
dc.subject.por.fl_str_mv |
Construction management Project scheduling Multi-mode RCPSP Resource constraints Genetic algorithms |
topic |
Construction management Project scheduling Multi-mode RCPSP Resource constraints Genetic algorithms |
description |
This paper presents a genetic algorithm for the multimode resource-constrained project scheduling problem (MRCPSP), in which multiple execution modes are available for each of the activities of the project. The objective function is the minimization of the construction project completion time. To solve the problem, is applied a two-level genetic algorithm, which makes use of two separate levels and extend the parameterized schedule generation scheme by introducing an improvement procedure. It is evaluated the quality of the schedule and present detailed comparative computational results for the MRCPSP, which reveal that this approach is a competitive algorithm. |
publishDate |
2011 |
dc.date.none.fl_str_mv |
2011 2011-01-01T00:00:00Z 2014-04-01T15:32:02Z |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://hdl.handle.net/10400.22/4298 |
url |
http://hdl.handle.net/10400.22/4298 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
2074-1308 10400.22/4298 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
University Press |
publisher.none.fl_str_mv |
University Press |
dc.source.none.fl_str_mv |
reponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação instacron:RCAAP |
instname_str |
Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação |
instacron_str |
RCAAP |
institution |
RCAAP |
reponame_str |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
collection |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) |
repository.name.fl_str_mv |
Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação |
repository.mail.fl_str_mv |
|
_version_ |
1799131345606148096 |