Short term operation planning of hydro stations considered as price makers using the MATLAB LINPROG® function

Detalhes bibliográficos
Autor(a) principal: João Tomé Saraiva
Data de Publicação: 2016
Outros Autores: Manuel Castro, José Carlos Sousa
Tipo de documento: Livro
Idioma: eng
Título da fonte: Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
Texto Completo: https://hdl.handle.net/10216/86621
Resumo: The restructuring of power systems induced new challenges to generation companies in terms of adequately planning the operation of power stations in order to maximize their profits. In this scope, hydro resources are becoming extremely valuable given the revenues that their operation can generate. In this paper we describe the application of the Matlab® Linprog optimization function to solve the Short Term Hydro Scheduling Problem, HSP, admitting that some stations are installed in the same cascade and that some of them have pumping capabilities. The optimization module to solve the HSP problem is then integrated in an iterative process to take into account the impact that the operation decisions regarding the hydro stations under analysis have on the market prices. The updated market prices are then used to run again the HSP problem thus enabling considering the hydro stations as price makers. The developed approach is illustrated using a system based on the Portuguese Douro River cascade that includes 9 hydro stations (4 of them are pumping stations) and a total installed capacity of 1485 MW.
id RCAP_d7f7c6bc53e18ab86a2526cf01725361
oai_identifier_str oai:repositorio-aberto.up.pt:10216/86621
network_acronym_str RCAP
network_name_str Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
repository_id_str 7160
spelling Short term operation planning of hydro stations considered as price makers using the MATLAB LINPROG® functionEngenharia electrotécnica, Engenharia electrotécnica, electrónica e informáticaElectrical engineering, Electrical engineering, Electronic engineering, Information engineeringThe restructuring of power systems induced new challenges to generation companies in terms of adequately planning the operation of power stations in order to maximize their profits. In this scope, hydro resources are becoming extremely valuable given the revenues that their operation can generate. In this paper we describe the application of the Matlab® Linprog optimization function to solve the Short Term Hydro Scheduling Problem, HSP, admitting that some stations are installed in the same cascade and that some of them have pumping capabilities. The optimization module to solve the HSP problem is then integrated in an iterative process to take into account the impact that the operation decisions regarding the hydro stations under analysis have on the market prices. The updated market prices are then used to run again the HSP problem thus enabling considering the hydro stations as price makers. The developed approach is illustrated using a system based on the Portuguese Douro River cascade that includes 9 hydro stations (4 of them are pumping stations) and a total installed capacity of 1485 MW.2016-11-072016-11-07T00:00:00Zinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bookapplication/pdfhttps://hdl.handle.net/10216/86621engJoão Tomé SaraivaManuel CastroJosé Carlos Sousainfo:eu-repo/semantics/openAccessreponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãoinstacron:RCAAP2023-11-29T15:28:50Zoai:repositorio-aberto.up.pt:10216/86621Portal AgregadorONGhttps://www.rcaap.pt/oai/openaireopendoar:71602024-03-20T00:24:35.491652Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informaçãofalse
dc.title.none.fl_str_mv Short term operation planning of hydro stations considered as price makers using the MATLAB LINPROG® function
title Short term operation planning of hydro stations considered as price makers using the MATLAB LINPROG® function
spellingShingle Short term operation planning of hydro stations considered as price makers using the MATLAB LINPROG® function
João Tomé Saraiva
Engenharia electrotécnica, Engenharia electrotécnica, electrónica e informática
Electrical engineering, Electrical engineering, Electronic engineering, Information engineering
title_short Short term operation planning of hydro stations considered as price makers using the MATLAB LINPROG® function
title_full Short term operation planning of hydro stations considered as price makers using the MATLAB LINPROG® function
title_fullStr Short term operation planning of hydro stations considered as price makers using the MATLAB LINPROG® function
title_full_unstemmed Short term operation planning of hydro stations considered as price makers using the MATLAB LINPROG® function
title_sort Short term operation planning of hydro stations considered as price makers using the MATLAB LINPROG® function
author João Tomé Saraiva
author_facet João Tomé Saraiva
Manuel Castro
José Carlos Sousa
author_role author
author2 Manuel Castro
José Carlos Sousa
author2_role author
author
dc.contributor.author.fl_str_mv João Tomé Saraiva
Manuel Castro
José Carlos Sousa
dc.subject.por.fl_str_mv Engenharia electrotécnica, Engenharia electrotécnica, electrónica e informática
Electrical engineering, Electrical engineering, Electronic engineering, Information engineering
topic Engenharia electrotécnica, Engenharia electrotécnica, electrónica e informática
Electrical engineering, Electrical engineering, Electronic engineering, Information engineering
description The restructuring of power systems induced new challenges to generation companies in terms of adequately planning the operation of power stations in order to maximize their profits. In this scope, hydro resources are becoming extremely valuable given the revenues that their operation can generate. In this paper we describe the application of the Matlab® Linprog optimization function to solve the Short Term Hydro Scheduling Problem, HSP, admitting that some stations are installed in the same cascade and that some of them have pumping capabilities. The optimization module to solve the HSP problem is then integrated in an iterative process to take into account the impact that the operation decisions regarding the hydro stations under analysis have on the market prices. The updated market prices are then used to run again the HSP problem thus enabling considering the hydro stations as price makers. The developed approach is illustrated using a system based on the Portuguese Douro River cascade that includes 9 hydro stations (4 of them are pumping stations) and a total installed capacity of 1485 MW.
publishDate 2016
dc.date.none.fl_str_mv 2016-11-07
2016-11-07T00:00:00Z
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/book
format book
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://hdl.handle.net/10216/86621
url https://hdl.handle.net/10216/86621
dc.language.iso.fl_str_mv eng
language eng
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.source.none.fl_str_mv reponame:Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
instname:Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação
instacron:RCAAP
instname_str Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação
instacron_str RCAAP
institution RCAAP
reponame_str Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
collection Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos)
repository.name.fl_str_mv Repositório Científico de Acesso Aberto de Portugal (Repositórios Cientìficos) - Agência para a Sociedade do Conhecimento (UMIC) - FCT - Sociedade da Informação
repository.mail.fl_str_mv
_version_ 1799136160521388032