Uma proposta de evolução do sistema Simplified Drum-Buffer-Rope para produção e distribuição para disponibilidade

Detalhes bibliográficos
Autor(a) principal: Castro, Robson Flávio
Data de Publicação: 2022
Tipo de documento: Tese
Idioma: eng
Título da fonte: Repositório Institucional da UFSCAR
Texto Completo: https://repositorio.ufscar.br/handle/ufscar/18327
Resumo: The Simplified Drum-Buffer-Rope (S-DBR) is a system that encompasses the planning, scheduling, production control, and control inventory replenishment in the supply chain. S-DBR offers distinct approaches for make-to-order and make-to-stock manufacturing environments. For this research, we focus on the method applicable to make-to-stock environments, known as Make-To-Availability (MTA) in S-DBR. MTA commits to ensuring high product availability. To adapt to merchandise distribution environments, the MTA has been expanded by incorporating new rules. While this expansion isn't considered a new method by its original authors, we refer to it as Distribution-To-Availability (DTA) to differentiate it from MTA. Our previous studies on S-DBR revealed operational challenges with both MTA and DTA. Therefore, this research aims to propose enhancements for these two methods, which are supported by four specific objectives. The first objective (i) is to conduct a systematic literature review to identify suggestions and proposed improvements for S-DBR and its predecessor, DBR. The review uncovered that the previously identified problems have yet to be addressed, and studies are scarce on S-DBR compared to DBR. One of the difficulties encountered by MTA is effectively managing manufacturing environments with sequence-dependent setup time. The second (ii) and third (iii) objectives are dedicated to tackling this challenge. Objective (ii) involves identifying dispatch rules suitable for MTA, while objective (iii) focuses on proposing a solution for MTA in sequence-dependent setup time environments. In the case of DTA, the challenge lies in planning the replenishment of stock buffers within the supply chain, particularly in the distribution network. S-DBR emphasizes the need for frequent inventory allocation but does not offer a solution that effectively balances transport costs and inventory maintenance costs. Consequently, the specific objective (iv) aims to propose a solution that enables DTA to address the trade-off between transportation costs and inventory maintenance costs, ensuring both product availability and profitability. The research results demonstrate that utilizing different dispatch rules can enhance the performance of MTA. Furthermore, our proposed solution for sequence-dependent setup time environments has improved the performance of MTA. Regarding DTA, the proposed solutions effectively ensure inventory supply in the distribution network by striking a balance between transport and inventory maintenance costs, thereby maintaining product availability and profitability.
id SCAR_6db97f4ac7320d0d3da238ccdcc9f65b
oai_identifier_str oai:repositorio.ufscar.br:ufscar/18327
network_acronym_str SCAR
network_name_str Repositório Institucional da UFSCAR
repository_id_str 4322
spelling Castro, Robson FlávioTavares Neto, Roberto Fernandeshttp://lattes.cnpq.br/6954662222457389http://lattes.cnpq.br/0980302907365440https://orcid.org/0000-0002-1569-838Xhttps://orcid.org/0000-0002-4659-1745b345ac1d-c9be-4190-8f6d-fdad70eb7fde2023-07-27T13:10:39Z2023-07-27T13:10:39Z2022-10-18CASTRO, Robson Flávio. Uma proposta de evolução do sistema Simplified Drum-Buffer-Rope para produção e distribuição para disponibilidade. 2022. Tese (Doutorado em Engenharia de Produção) – Universidade Federal de São Carlos, São Carlos, 2022. Disponível em: https://repositorio.ufscar.br/handle/ufscar/18327.https://repositorio.ufscar.br/handle/ufscar/18327The Simplified Drum-Buffer-Rope (S-DBR) is a system that encompasses the planning, scheduling, production control, and control inventory replenishment in the supply chain. S-DBR offers distinct approaches for make-to-order and make-to-stock manufacturing environments. For this research, we focus on the method applicable to make-to-stock environments, known as Make-To-Availability (MTA) in S-DBR. MTA commits to ensuring high product availability. To adapt to merchandise distribution environments, the MTA has been expanded by incorporating new rules. While this expansion isn't considered a new method by its original authors, we refer to it as Distribution-To-Availability (DTA) to differentiate it from MTA. Our previous studies on S-DBR revealed operational challenges with both MTA and DTA. Therefore, this research aims to propose enhancements for these two methods, which are supported by four specific objectives. The first objective (i) is to conduct a systematic literature review to identify suggestions and proposed improvements for S-DBR and its predecessor, DBR. The review uncovered that the previously identified problems have yet to be addressed, and studies are scarce on S-DBR compared to DBR. One of the difficulties encountered by MTA is effectively managing manufacturing environments with sequence-dependent setup time. The second (ii) and third (iii) objectives are dedicated to tackling this challenge. Objective (ii) involves identifying dispatch rules suitable for MTA, while objective (iii) focuses on proposing a solution for MTA in sequence-dependent setup time environments. In the case of DTA, the challenge lies in planning the replenishment of stock buffers within the supply chain, particularly in the distribution network. S-DBR emphasizes the need for frequent inventory allocation but does not offer a solution that effectively balances transport costs and inventory maintenance costs. Consequently, the specific objective (iv) aims to propose a solution that enables DTA to address the trade-off between transportation costs and inventory maintenance costs, ensuring both product availability and profitability. The research results demonstrate that utilizing different dispatch rules can enhance the performance of MTA. Furthermore, our proposed solution for sequence-dependent setup time environments has improved the performance of MTA. Regarding DTA, the proposed solutions effectively ensure inventory supply in the distribution network by striking a balance between transport and inventory maintenance costs, thereby maintaining product availability and profitability.O Simplified Drum-Buffer-Rope (S-DBR) é um sistema para o planejamento, programação e controle da produção, que também pode controlar a reposição de inventários na cadeia de suprimentos. O S-DBR propõe métodos diferentes para ambientes de manufatura make-to-order e make-to-stock. Nesta pesquisa, estamos interessados no método para ambientes make-to-stock, que no S-DBR é chamado de Make-To-Availability (MTA) porque assume o compromisso de garantir alta disponibilidade de produtos e oferece mecanismos específicos para tal. O MTA foi ampliado para se adequar a ambientes de distribuição de mercadorias, com a adição de novas regras. Embora essa extensão não tenha sido considerada um novo método pelos seus autores, decidimos chamá-la de Distribution-To-Availability (DTA) para distingui-la do MTA. Em nossos estudos anteriores sobre o S-DBR identificamos alguns problemas no modo de operação do MTA e do DTA. O objetivo desta pesquisa é propor melhorias para os dois métodos, que desdobramos em quatro objetivos específicos. O primeiro objetivo específico é (i) identificar as adaptações e melhorias propostas ao S-DBR e em seu precursor, DBR, através de uma revisão sistemática da literatura. Foi constatado pela revisão da literatura, que os problemas identificados anteriormente ainda não haviam sido tratados, além de haver poucos estudos sobre o S-DBR em comparação ao DBR. Uma das dificuldades do MTA é lidar com ambientes de manufatura onde há tempo de setup dependente da sequência. O segundo e terceiro objetivos específicos foram dedicados a esse problema. O segundo objetivo específico (ii) é identificar regras de despachos adequadas ao MTA. Esse estudo embasou o estudo relacionado ao terceiro objetivo específico, (iii) que é propor uma solução para o MTA voltada a ambientes com de tempo de setup dependente da sequência. No DTA, o problema está no planejamento da reposição dos buffers de estoque espalhados pela cadeia de suprimentos, mais especificamente na rede de distribuição. O S-DBR prega que a reposição de inventário deve ser frequente, porém não aponta uma solução que lide com o trade-off entre os custos de transporte e o custo de manutenção de inventário. Relacionado a isso, o objetivo específico (iv) é propor uma solução que habilite o DTA a enfrentar o trade-off entre os custos de transporte e os custos de manutenção de estoques, além de planejar a reposição de inventário para garantir tanto alta disponibilidade de produtos quanto lucratividade. Os resultados da pesquisa mostraram que o uso de diferentes regras de despacho pode melhorar o desempenho do MTA. Além disso, o desempenho do MTA melhorou com a solução que propomos para ambientes com tempo de setup dependente da sequência. Em relação ao DTA, as soluções propostas mostraram-se capazes de planejar a reposição de inventário na rede de distribuição equilibrando os custos de transporte e de manutenção de inventário, mantendo a disponibilidade dos produtos e o lucro.Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)001engUniversidade Federal de São CarlosCâmpus São CarlosPrograma de Pós-Graduação em Engenharia de Produção - PPGEPUFSCarAttribution-NoDerivs 3.0 Brazilhttp://creativecommons.org/licenses/by-nd/3.0/br/info:eu-repo/semantics/openAccessTeoria das RestriçõesSimplified Drum-Buffer-RopeMake-to-AvailabilityDistribution-to-AvailabilityTheory of ConstraintsMake-to-AvailabilityDistribution-to-AvailabilityENGENHARIAS::ENGENHARIA DE PRODUCAO::GERENCIA DE PRODUCAOUma proposta de evolução do sistema Simplified Drum-Buffer-Rope para produção e distribuição para disponibilidadeA Simplified Drum-Buffer-Rope system evolution proposal for production and distribution to availabilityinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/doctoralThesis60060001d6eb04-3d59-491d-9871-4c1193a17d16reponame:Repositório Institucional da UFSCARinstname:Universidade Federal de São Carlos (UFSCAR)instacron:UFSCARORIGINALDEFESA_FINAL_V11.pdfDEFESA_FINAL_V11.pdfTexto da teseapplication/pdf2275379https://repositorio.ufscar.br/bitstream/ufscar/18327/1/DEFESA_FINAL_V11.pdfeafd999d9bc4c0559228ff7ddc534e5aMD51CC-LICENSElicense_rdflicense_rdfapplication/rdf+xml; charset=utf-8804https://repositorio.ufscar.br/bitstream/ufscar/18327/3/license_rdf4774e414fb27824b0dfca5f33e4ff24fMD53TEXTDEFESA_FINAL_V11.pdf.txtDEFESA_FINAL_V11.pdf.txtExtracted texttext/plain327924https://repositorio.ufscar.br/bitstream/ufscar/18327/4/DEFESA_FINAL_V11.pdf.txtfa5ae425b18a4515b6f4f8b3321c6fdeMD54ufscar/183272024-05-14 17:42:26.872oai:repositorio.ufscar.br:ufscar/18327Repositório InstitucionalPUBhttps://repositorio.ufscar.br/oai/requestopendoar:43222024-05-14T17:42:26Repositório Institucional da UFSCAR - Universidade Federal de São Carlos (UFSCAR)false
dc.title.por.fl_str_mv Uma proposta de evolução do sistema Simplified Drum-Buffer-Rope para produção e distribuição para disponibilidade
dc.title.alternative.eng.fl_str_mv A Simplified Drum-Buffer-Rope system evolution proposal for production and distribution to availability
title Uma proposta de evolução do sistema Simplified Drum-Buffer-Rope para produção e distribuição para disponibilidade
spellingShingle Uma proposta de evolução do sistema Simplified Drum-Buffer-Rope para produção e distribuição para disponibilidade
Castro, Robson Flávio
Teoria das Restrições
Simplified Drum-Buffer-Rope
Make-to-Availability
Distribution-to-Availability
Theory of Constraints
Make-to-Availability
Distribution-to-Availability
ENGENHARIAS::ENGENHARIA DE PRODUCAO::GERENCIA DE PRODUCAO
title_short Uma proposta de evolução do sistema Simplified Drum-Buffer-Rope para produção e distribuição para disponibilidade
title_full Uma proposta de evolução do sistema Simplified Drum-Buffer-Rope para produção e distribuição para disponibilidade
title_fullStr Uma proposta de evolução do sistema Simplified Drum-Buffer-Rope para produção e distribuição para disponibilidade
title_full_unstemmed Uma proposta de evolução do sistema Simplified Drum-Buffer-Rope para produção e distribuição para disponibilidade
title_sort Uma proposta de evolução do sistema Simplified Drum-Buffer-Rope para produção e distribuição para disponibilidade
author Castro, Robson Flávio
author_facet Castro, Robson Flávio
author_role author
dc.contributor.authorlattes.por.fl_str_mv http://lattes.cnpq.br/0980302907365440
dc.contributor.authororcid.por.fl_str_mv https://orcid.org/0000-0002-1569-838X
dc.contributor.advisor1orcid.por.fl_str_mv https://orcid.org/0000-0002-4659-1745
dc.contributor.author.fl_str_mv Castro, Robson Flávio
dc.contributor.advisor1.fl_str_mv Tavares Neto, Roberto Fernandes
dc.contributor.advisor1Lattes.fl_str_mv http://lattes.cnpq.br/6954662222457389
dc.contributor.authorID.fl_str_mv b345ac1d-c9be-4190-8f6d-fdad70eb7fde
contributor_str_mv Tavares Neto, Roberto Fernandes
dc.subject.por.fl_str_mv Teoria das Restrições
topic Teoria das Restrições
Simplified Drum-Buffer-Rope
Make-to-Availability
Distribution-to-Availability
Theory of Constraints
Make-to-Availability
Distribution-to-Availability
ENGENHARIAS::ENGENHARIA DE PRODUCAO::GERENCIA DE PRODUCAO
dc.subject.eng.fl_str_mv Simplified Drum-Buffer-Rope
Make-to-Availability
Distribution-to-Availability
Theory of Constraints
Make-to-Availability
Distribution-to-Availability
dc.subject.cnpq.fl_str_mv ENGENHARIAS::ENGENHARIA DE PRODUCAO::GERENCIA DE PRODUCAO
description The Simplified Drum-Buffer-Rope (S-DBR) is a system that encompasses the planning, scheduling, production control, and control inventory replenishment in the supply chain. S-DBR offers distinct approaches for make-to-order and make-to-stock manufacturing environments. For this research, we focus on the method applicable to make-to-stock environments, known as Make-To-Availability (MTA) in S-DBR. MTA commits to ensuring high product availability. To adapt to merchandise distribution environments, the MTA has been expanded by incorporating new rules. While this expansion isn't considered a new method by its original authors, we refer to it as Distribution-To-Availability (DTA) to differentiate it from MTA. Our previous studies on S-DBR revealed operational challenges with both MTA and DTA. Therefore, this research aims to propose enhancements for these two methods, which are supported by four specific objectives. The first objective (i) is to conduct a systematic literature review to identify suggestions and proposed improvements for S-DBR and its predecessor, DBR. The review uncovered that the previously identified problems have yet to be addressed, and studies are scarce on S-DBR compared to DBR. One of the difficulties encountered by MTA is effectively managing manufacturing environments with sequence-dependent setup time. The second (ii) and third (iii) objectives are dedicated to tackling this challenge. Objective (ii) involves identifying dispatch rules suitable for MTA, while objective (iii) focuses on proposing a solution for MTA in sequence-dependent setup time environments. In the case of DTA, the challenge lies in planning the replenishment of stock buffers within the supply chain, particularly in the distribution network. S-DBR emphasizes the need for frequent inventory allocation but does not offer a solution that effectively balances transport costs and inventory maintenance costs. Consequently, the specific objective (iv) aims to propose a solution that enables DTA to address the trade-off between transportation costs and inventory maintenance costs, ensuring both product availability and profitability. The research results demonstrate that utilizing different dispatch rules can enhance the performance of MTA. Furthermore, our proposed solution for sequence-dependent setup time environments has improved the performance of MTA. Regarding DTA, the proposed solutions effectively ensure inventory supply in the distribution network by striking a balance between transport and inventory maintenance costs, thereby maintaining product availability and profitability.
publishDate 2022
dc.date.issued.fl_str_mv 2022-10-18
dc.date.accessioned.fl_str_mv 2023-07-27T13:10:39Z
dc.date.available.fl_str_mv 2023-07-27T13:10:39Z
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/doctoralThesis
format doctoralThesis
status_str publishedVersion
dc.identifier.citation.fl_str_mv CASTRO, Robson Flávio. Uma proposta de evolução do sistema Simplified Drum-Buffer-Rope para produção e distribuição para disponibilidade. 2022. Tese (Doutorado em Engenharia de Produção) – Universidade Federal de São Carlos, São Carlos, 2022. Disponível em: https://repositorio.ufscar.br/handle/ufscar/18327.
dc.identifier.uri.fl_str_mv https://repositorio.ufscar.br/handle/ufscar/18327
identifier_str_mv CASTRO, Robson Flávio. Uma proposta de evolução do sistema Simplified Drum-Buffer-Rope para produção e distribuição para disponibilidade. 2022. Tese (Doutorado em Engenharia de Produção) – Universidade Federal de São Carlos, São Carlos, 2022. Disponível em: https://repositorio.ufscar.br/handle/ufscar/18327.
url https://repositorio.ufscar.br/handle/ufscar/18327
dc.language.iso.fl_str_mv eng
language eng
dc.relation.confidence.fl_str_mv 600
600
dc.relation.authority.fl_str_mv 01d6eb04-3d59-491d-9871-4c1193a17d16
dc.rights.driver.fl_str_mv Attribution-NoDerivs 3.0 Brazil
http://creativecommons.org/licenses/by-nd/3.0/br/
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Attribution-NoDerivs 3.0 Brazil
http://creativecommons.org/licenses/by-nd/3.0/br/
eu_rights_str_mv openAccess
dc.publisher.none.fl_str_mv Universidade Federal de São Carlos
Câmpus São Carlos
dc.publisher.program.fl_str_mv Programa de Pós-Graduação em Engenharia de Produção - PPGEP
dc.publisher.initials.fl_str_mv UFSCar
publisher.none.fl_str_mv Universidade Federal de São Carlos
Câmpus São Carlos
dc.source.none.fl_str_mv reponame:Repositório Institucional da UFSCAR
instname:Universidade Federal de São Carlos (UFSCAR)
instacron:UFSCAR
instname_str Universidade Federal de São Carlos (UFSCAR)
instacron_str UFSCAR
institution UFSCAR
reponame_str Repositório Institucional da UFSCAR
collection Repositório Institucional da UFSCAR
bitstream.url.fl_str_mv https://repositorio.ufscar.br/bitstream/ufscar/18327/1/DEFESA_FINAL_V11.pdf
https://repositorio.ufscar.br/bitstream/ufscar/18327/3/license_rdf
https://repositorio.ufscar.br/bitstream/ufscar/18327/4/DEFESA_FINAL_V11.pdf.txt
bitstream.checksum.fl_str_mv eafd999d9bc4c0559228ff7ddc534e5a
4774e414fb27824b0dfca5f33e4ff24f
fa5ae425b18a4515b6f4f8b3321c6fde
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
repository.name.fl_str_mv Repositório Institucional da UFSCAR - Universidade Federal de São Carlos (UFSCAR)
repository.mail.fl_str_mv
_version_ 1802136425496313856