Identificação dos fatores críticos de sucesso na implementação do Building Information Modeling pelo setor de pré-moldados de concreto

Detalhes bibliográficos
Autor(a) principal: Melo, Arthur Henrique Vieira de Melo
Data de Publicação: 2023
Tipo de documento: Dissertação
Idioma: por
Título da fonte: Repositório Institucional da UFSCAR
Texto Completo: https://repositorio.ufscar.br/handle/ufscar/18139
Resumo: The industrialization of construction is perceived as a solution to the problems of the conventional method of building, improving the sector’s productivity and the quality of products and rationalizing the use of human, financial and environmental resources. One of the strategies used by the prefabricated sector is the Building Information Modeling (BIM) implementation due to the reliability of the models’ information and the integration between systems and technologies. Despite the synergy between BIM and prefabricated construction, the BIM implementation is a complex process and presents barriers to success. In this sense, this dissertation has as its main objective the definition and analysis of the Critical Success Factors (CSF) related to the implementation of BIM in the precast concrete sector in Brazil. The research method adopted is exploratory and was initiated with a systematic literature review (RSL) where the 25 main barriers addressed in the literature were identified. Subsequently, questionnaires were applied to nine companies in the sector, where the respondents exposed their perceptions about the BIM implementation process in their respective companies. In the sample analyzed, the main improvements pointed out by the BIM adoption focus on improving information management and optimizing the design, production and assembly process. However, in the companies analyzed, there was some difficulty in planning the implementation process, from the definition of objectives, deadlines and responsible, contributing to a partial use of BIM and reduction of the benefits of adoption. Respondents also assessed 25 barriers identified in the RSL in relation to their degree of importance for the successful implementation of BIM using a Likert scale. Based on the score received by each barrier, ten FCS were defined: high initial cost; lack of trained BIM professionals; resistance to integrated and collaborative work; misunderstanding of the benefits of BIM; lack of BIM implementation plan; interoperability problems; lack of communication between the model and the production system; lack of technical support; lack of leadership from senior management; resistance to data sharing. Despite the small sample, the interrelationships between the FCS were analyzed through Principal Component Analysis (PCA) in order to establish a roadmap for future research. Thus, the FCS were evaluated qualitatively through the PCA, considering the grouping of the FCS into two main components: factors related to people and organization and factors related to processes and technology.
id SCAR_e23f578c2cc7e6697a24fbd25927660d
oai_identifier_str oai:repositorio.ufscar.br:ufscar/18139
network_acronym_str SCAR
network_name_str Repositório Institucional da UFSCAR
repository_id_str 4322
spelling Melo, Arthur Henrique Vieira de MeloSerra, Sheyla Mara Baptistahttp://lattes.cnpq.br/8528385567782505http://lattes.cnpq.br/5866055806229295https://orcid.org/0000-0002-1299-4984https://orcid.org/0000-0002-9508-976Xc2ca3256-7934-44dc-b24c-eef333d3c2522023-06-13T12:23:41Z2023-06-13T12:23:41Z2023-04-01MELO, Arthur Henrique Vieira de Melo. Identificação dos fatores críticos de sucesso na implementação do Building Information Modeling pelo setor de pré-moldados de concreto. 2023. Dissertação (Mestrado em Engenharia Civil) – Universidade Federal de São Carlos, São Carlos, 2023. Disponível em: https://repositorio.ufscar.br/handle/ufscar/18139.https://repositorio.ufscar.br/handle/ufscar/18139The industrialization of construction is perceived as a solution to the problems of the conventional method of building, improving the sector’s productivity and the quality of products and rationalizing the use of human, financial and environmental resources. One of the strategies used by the prefabricated sector is the Building Information Modeling (BIM) implementation due to the reliability of the models’ information and the integration between systems and technologies. Despite the synergy between BIM and prefabricated construction, the BIM implementation is a complex process and presents barriers to success. In this sense, this dissertation has as its main objective the definition and analysis of the Critical Success Factors (CSF) related to the implementation of BIM in the precast concrete sector in Brazil. The research method adopted is exploratory and was initiated with a systematic literature review (RSL) where the 25 main barriers addressed in the literature were identified. Subsequently, questionnaires were applied to nine companies in the sector, where the respondents exposed their perceptions about the BIM implementation process in their respective companies. In the sample analyzed, the main improvements pointed out by the BIM adoption focus on improving information management and optimizing the design, production and assembly process. However, in the companies analyzed, there was some difficulty in planning the implementation process, from the definition of objectives, deadlines and responsible, contributing to a partial use of BIM and reduction of the benefits of adoption. Respondents also assessed 25 barriers identified in the RSL in relation to their degree of importance for the successful implementation of BIM using a Likert scale. Based on the score received by each barrier, ten FCS were defined: high initial cost; lack of trained BIM professionals; resistance to integrated and collaborative work; misunderstanding of the benefits of BIM; lack of BIM implementation plan; interoperability problems; lack of communication between the model and the production system; lack of technical support; lack of leadership from senior management; resistance to data sharing. Despite the small sample, the interrelationships between the FCS were analyzed through Principal Component Analysis (PCA) in order to establish a roadmap for future research. Thus, the FCS were evaluated qualitatively through the PCA, considering the grouping of the FCS into two main components: factors related to people and organization and factors related to processes and technology.A industrialização da construção é percebida como uma solução para os problemas do método convencional de construção, melhorando a produtividade do setor e a qualidade dos produtos, e racionalizando o uso dos recursos humanos, financeiros e ambientais. Uma das estratégias utilizadas pelo setor de pré-fabricados é a implementação do Building Information Modeling (BIM) devido à confiabilidade das informações dos modelos e a integração entre sistemas e tecnologias. Apesar da sinergia entre o BIM e a construção pré-fabricada, a implementação da metodologia BIM é um processo complexo e apresenta barreiras para o sucesso. Nesse sentido, esta dissertação tem como objetivo principal a definição e análise dos Fatores Críticos de Sucesso (FCS) relacionados à implantação do BIM no setor de pré-moldados de concreto no Brasil. O método de pesquisa adotado é exploratório e foi iniciado com uma revisão sistemática da literatura (RSL) onde foram identificadas as 25 barreiras principais abordadas na literatura. Posteriormente, ocorreu a aplicação de questionários em nove empresas do setor, onde os respondentes expuseram as suas percepções sobre o processo de implantação do BIM nas respectivas empresas. Na amostra analisada, as principais melhorias apontas pela adoção do BIM concentram-se na melhoria no gerenciamento das informações e na otimização do processo de projeto, produção e montagem. No entanto, nas empresas analisadas, observou-se certa dificuldade no planejamento do processo de implantação, desde a definição de objetivos, prazos e responsáveis, contribuindo para uma utilização parcial do BIM e redução dos benefícios da adoção. Os respondentes também avaliaram 25 barreiras identificadas na RSL em relação ao seu grau de importância para o sucesso da implementação do BIM por meio de uma escala de Likert. Com base na nota recebida por cada barreira, definiu-se dez FCS: alto custo inicial; falta de profissionais capacitados para BIM; resistência ao trabalho integrado e colaborativo; incompreensão dos benefícios do BIM; falta de plano de implementação BIM; problemas de interoperabilidade; falta de comunicação entre o modelo e o sistema de produção; falta de suporte técnico; falta de liderança da alta administração; resistência ao compartilhamento de dados. Apesar da pequena amostra para análise fatorial, as inter-relações entre os FCS foram analisadas por meio da Análise de Componentes Principais (ACP) de forma a estabelecer um roteiro para futuras pesquisas. Assim, os FCS foram avaliados qualitativamente por meio da ACP, considerando o agrupamento dos FCS em dois componentes principais: fatores relacionados a pessoas e organização e fatores relacionados a processos e tecnologia.Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)CAPES/DSporUniversidade Federal de São CarlosCâmpus São CarlosPrograma de Pós-Graduação em Engenharia Civil - PPGECivUFSCarCC0 1.0 Universalhttp://creativecommons.org/publicdomain/zero/1.0/info:eu-repo/semantics/openAccessPré-moldado de concretoModelagem de informação da construçãoImplementação do BIMAdoção do BIMFatores críticos de sucessoPrecast concreteBuilding information modellingBim implementationBim adoptionCritical success factorsENGENHARIAS::ENGENHARIA CIVIL::CONSTRUCAO CIVILENGENHARIAS::ENGENHARIA CIVILIdentificação dos fatores críticos de sucesso na implementação do Building Information Modeling pelo setor de pré-moldados de concretoIdentification of Critical Success Factors (CSF) in Building Information Modeling (BIM) implementation in the precast sectorinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesis6006006d0a9f0e-68c5-46b0-a4bb-e25f58218de7reponame:Repositório Institucional da UFSCARinstname:Universidade Federal de São Carlos (UFSCAR)instacron:UFSCARORIGINALDissertação_Arthur Henrique Vieira de Melo.pdfDissertação_Arthur Henrique Vieira de Melo.pdfDissertaçãoapplication/pdf2659067https://repositorio.ufscar.br/bitstream/ufscar/18139/1/Disserta%c3%a7%c3%a3o_Arthur%20Henrique%20Vieira%20de%20Melo.pdf59a69dbf3fb9bbf1f2098fc41769570eMD51CC-LICENSElicense_rdflicense_rdfapplication/rdf+xml; charset=utf-8700https://repositorio.ufscar.br/bitstream/ufscar/18139/2/license_rdf79da7ba44461b593b4f6afc1f09853c4MD52TEXTDissertação_Arthur Henrique Vieira de Melo.pdf.txtDissertação_Arthur Henrique Vieira de Melo.pdf.txtExtracted texttext/plain283844https://repositorio.ufscar.br/bitstream/ufscar/18139/3/Disserta%c3%a7%c3%a3o_Arthur%20Henrique%20Vieira%20de%20Melo.pdf.txt98f7fdc9cce081050f18c654eac30863MD53THUMBNAILDissertação_Arthur Henrique Vieira de Melo.pdf.jpgDissertação_Arthur Henrique Vieira de Melo.pdf.jpgIM Thumbnailimage/jpeg7074https://repositorio.ufscar.br/bitstream/ufscar/18139/4/Disserta%c3%a7%c3%a3o_Arthur%20Henrique%20Vieira%20de%20Melo.pdf.jpg4ae88fb6493ad1c93cf849bbef1ef0deMD54ufscar/181392023-09-18 18:32:39.696oai:repositorio.ufscar.br:ufscar/18139Repositório InstitucionalPUBhttps://repositorio.ufscar.br/oai/requestopendoar:43222023-09-18T18:32:39Repositório Institucional da UFSCAR - Universidade Federal de São Carlos (UFSCAR)false
dc.title.por.fl_str_mv Identificação dos fatores críticos de sucesso na implementação do Building Information Modeling pelo setor de pré-moldados de concreto
dc.title.alternative.eng.fl_str_mv Identification of Critical Success Factors (CSF) in Building Information Modeling (BIM) implementation in the precast sector
title Identificação dos fatores críticos de sucesso na implementação do Building Information Modeling pelo setor de pré-moldados de concreto
spellingShingle Identificação dos fatores críticos de sucesso na implementação do Building Information Modeling pelo setor de pré-moldados de concreto
Melo, Arthur Henrique Vieira de Melo
Pré-moldado de concreto
Modelagem de informação da construção
Implementação do BIM
Adoção do BIM
Fatores críticos de sucesso
Precast concrete
Building information modelling
Bim implementation
Bim adoption
Critical success factors
ENGENHARIAS::ENGENHARIA CIVIL::CONSTRUCAO CIVIL
ENGENHARIAS::ENGENHARIA CIVIL
title_short Identificação dos fatores críticos de sucesso na implementação do Building Information Modeling pelo setor de pré-moldados de concreto
title_full Identificação dos fatores críticos de sucesso na implementação do Building Information Modeling pelo setor de pré-moldados de concreto
title_fullStr Identificação dos fatores críticos de sucesso na implementação do Building Information Modeling pelo setor de pré-moldados de concreto
title_full_unstemmed Identificação dos fatores críticos de sucesso na implementação do Building Information Modeling pelo setor de pré-moldados de concreto
title_sort Identificação dos fatores críticos de sucesso na implementação do Building Information Modeling pelo setor de pré-moldados de concreto
author Melo, Arthur Henrique Vieira de Melo
author_facet Melo, Arthur Henrique Vieira de Melo
author_role author
dc.contributor.authorlattes.por.fl_str_mv http://lattes.cnpq.br/5866055806229295
dc.contributor.authororcid.por.fl_str_mv https://orcid.org/0000-0002-1299-4984
dc.contributor.advisor1orcid.por.fl_str_mv https://orcid.org/0000-0002-9508-976X
dc.contributor.author.fl_str_mv Melo, Arthur Henrique Vieira de Melo
dc.contributor.advisor1.fl_str_mv Serra, Sheyla Mara Baptista
dc.contributor.advisor1Lattes.fl_str_mv http://lattes.cnpq.br/8528385567782505
dc.contributor.authorID.fl_str_mv c2ca3256-7934-44dc-b24c-eef333d3c252
contributor_str_mv Serra, Sheyla Mara Baptista
dc.subject.por.fl_str_mv Pré-moldado de concreto
Modelagem de informação da construção
Implementação do BIM
Adoção do BIM
Fatores críticos de sucesso
topic Pré-moldado de concreto
Modelagem de informação da construção
Implementação do BIM
Adoção do BIM
Fatores críticos de sucesso
Precast concrete
Building information modelling
Bim implementation
Bim adoption
Critical success factors
ENGENHARIAS::ENGENHARIA CIVIL::CONSTRUCAO CIVIL
ENGENHARIAS::ENGENHARIA CIVIL
dc.subject.eng.fl_str_mv Precast concrete
Building information modelling
Bim implementation
Bim adoption
Critical success factors
dc.subject.cnpq.fl_str_mv ENGENHARIAS::ENGENHARIA CIVIL::CONSTRUCAO CIVIL
ENGENHARIAS::ENGENHARIA CIVIL
description The industrialization of construction is perceived as a solution to the problems of the conventional method of building, improving the sector’s productivity and the quality of products and rationalizing the use of human, financial and environmental resources. One of the strategies used by the prefabricated sector is the Building Information Modeling (BIM) implementation due to the reliability of the models’ information and the integration between systems and technologies. Despite the synergy between BIM and prefabricated construction, the BIM implementation is a complex process and presents barriers to success. In this sense, this dissertation has as its main objective the definition and analysis of the Critical Success Factors (CSF) related to the implementation of BIM in the precast concrete sector in Brazil. The research method adopted is exploratory and was initiated with a systematic literature review (RSL) where the 25 main barriers addressed in the literature were identified. Subsequently, questionnaires were applied to nine companies in the sector, where the respondents exposed their perceptions about the BIM implementation process in their respective companies. In the sample analyzed, the main improvements pointed out by the BIM adoption focus on improving information management and optimizing the design, production and assembly process. However, in the companies analyzed, there was some difficulty in planning the implementation process, from the definition of objectives, deadlines and responsible, contributing to a partial use of BIM and reduction of the benefits of adoption. Respondents also assessed 25 barriers identified in the RSL in relation to their degree of importance for the successful implementation of BIM using a Likert scale. Based on the score received by each barrier, ten FCS were defined: high initial cost; lack of trained BIM professionals; resistance to integrated and collaborative work; misunderstanding of the benefits of BIM; lack of BIM implementation plan; interoperability problems; lack of communication between the model and the production system; lack of technical support; lack of leadership from senior management; resistance to data sharing. Despite the small sample, the interrelationships between the FCS were analyzed through Principal Component Analysis (PCA) in order to establish a roadmap for future research. Thus, the FCS were evaluated qualitatively through the PCA, considering the grouping of the FCS into two main components: factors related to people and organization and factors related to processes and technology.
publishDate 2023
dc.date.accessioned.fl_str_mv 2023-06-13T12:23:41Z
dc.date.available.fl_str_mv 2023-06-13T12:23:41Z
dc.date.issued.fl_str_mv 2023-04-01
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/masterThesis
format masterThesis
status_str publishedVersion
dc.identifier.citation.fl_str_mv MELO, Arthur Henrique Vieira de Melo. Identificação dos fatores críticos de sucesso na implementação do Building Information Modeling pelo setor de pré-moldados de concreto. 2023. Dissertação (Mestrado em Engenharia Civil) – Universidade Federal de São Carlos, São Carlos, 2023. Disponível em: https://repositorio.ufscar.br/handle/ufscar/18139.
dc.identifier.uri.fl_str_mv https://repositorio.ufscar.br/handle/ufscar/18139
identifier_str_mv MELO, Arthur Henrique Vieira de Melo. Identificação dos fatores críticos de sucesso na implementação do Building Information Modeling pelo setor de pré-moldados de concreto. 2023. Dissertação (Mestrado em Engenharia Civil) – Universidade Federal de São Carlos, São Carlos, 2023. Disponível em: https://repositorio.ufscar.br/handle/ufscar/18139.
url https://repositorio.ufscar.br/handle/ufscar/18139
dc.language.iso.fl_str_mv por
language por
dc.relation.confidence.fl_str_mv 600
600
dc.relation.authority.fl_str_mv 6d0a9f0e-68c5-46b0-a4bb-e25f58218de7
dc.rights.driver.fl_str_mv CC0 1.0 Universal
http://creativecommons.org/publicdomain/zero/1.0/
info:eu-repo/semantics/openAccess
rights_invalid_str_mv CC0 1.0 Universal
http://creativecommons.org/publicdomain/zero/1.0/
eu_rights_str_mv openAccess
dc.publisher.none.fl_str_mv Universidade Federal de São Carlos
Câmpus São Carlos
dc.publisher.program.fl_str_mv Programa de Pós-Graduação em Engenharia Civil - PPGECiv
dc.publisher.initials.fl_str_mv UFSCar
publisher.none.fl_str_mv Universidade Federal de São Carlos
Câmpus São Carlos
dc.source.none.fl_str_mv reponame:Repositório Institucional da UFSCAR
instname:Universidade Federal de São Carlos (UFSCAR)
instacron:UFSCAR
instname_str Universidade Federal de São Carlos (UFSCAR)
instacron_str UFSCAR
institution UFSCAR
reponame_str Repositório Institucional da UFSCAR
collection Repositório Institucional da UFSCAR
bitstream.url.fl_str_mv https://repositorio.ufscar.br/bitstream/ufscar/18139/1/Disserta%c3%a7%c3%a3o_Arthur%20Henrique%20Vieira%20de%20Melo.pdf
https://repositorio.ufscar.br/bitstream/ufscar/18139/2/license_rdf
https://repositorio.ufscar.br/bitstream/ufscar/18139/3/Disserta%c3%a7%c3%a3o_Arthur%20Henrique%20Vieira%20de%20Melo.pdf.txt
https://repositorio.ufscar.br/bitstream/ufscar/18139/4/Disserta%c3%a7%c3%a3o_Arthur%20Henrique%20Vieira%20de%20Melo.pdf.jpg
bitstream.checksum.fl_str_mv 59a69dbf3fb9bbf1f2098fc41769570e
79da7ba44461b593b4f6afc1f09853c4
98f7fdc9cce081050f18c654eac30863
4ae88fb6493ad1c93cf849bbef1ef0de
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
MD5
repository.name.fl_str_mv Repositório Institucional da UFSCAR - Universidade Federal de São Carlos (UFSCAR)
repository.mail.fl_str_mv
_version_ 1813715665726472192