Evaluation of the potential for building recovery at the end of its useful life: case of a federal institution of higher education

Detalhes bibliográficos
Autor(a) principal: Silva, Roberto Caldeira da
Data de Publicação: 2021
Outros Autores: Nagalli, André, Couto, João Pedro
Tipo de documento: Artigo
Idioma: por
Título da fonte: Interações (Campo Grande. Online)
Texto Completo: https://interacoes.ucdb.br/interacoes/article/view/2966
Resumo: This work aims to present a methodology to evaluate the potential for the recovery of buildings that, due to the end of their useful life, are subject to adjustments. To this end, the scope of the study included the on-site monitoring of the rehabilitation process of a medium-sized building, built in the 1950s, belonging to a Federal Institution of Higher Education (IFES) located in the city of Curitiba, PR. The strategy outlined was participatory research (PP), combined with the technique of participant observation (OP). The results obtained demonstrated a recovery potential of 90.04%. In addition, 35.7 m³ of waste was not disposed of in landfills, equivalent to 7% of the building's volume. This amount was partly due to the successful unbundling operations, mainly deconstruction and dismantling. In addition, the procedures defined in this research seek to increase the useful life of existing buildings and mitigate the problem of landfill overload. Finally, the proposed methodology can be applied to small to medium-sized buildings in interventions that aim at adjustments, such as rehabilitation works, retrofit, or reforms.
id UCDB-1_11db4be04b42e5f90d25711f18434059
oai_identifier_str oai:ojs.multitemasucdb.emnuvens.com.br:article/2966
network_acronym_str UCDB-1
network_name_str Interações (Campo Grande. Online)
repository_id_str
spelling Evaluation of the potential for building recovery at the end of its useful life: case of a federal institution of higher educationEvaluación del potencial de recuperación de edificios al final de su vida útil: caso de una institución federal de educación superiorAvaliação do potencial de recuperação de edificações ao fim da vida útil: caso de uma instituição federal de ensino superiorreusedeconstructionlifespanend-of-life scenariosconstruction wasteReutilizaçãoDesconstruçãovida útilcenários de fim de vidaresíduos da construção civilreutilizacióndeconstruciónvida útilescenarios de final de vidaresiduos de la construcciónThis work aims to present a methodology to evaluate the potential for the recovery of buildings that, due to the end of their useful life, are subject to adjustments. To this end, the scope of the study included the on-site monitoring of the rehabilitation process of a medium-sized building, built in the 1950s, belonging to a Federal Institution of Higher Education (IFES) located in the city of Curitiba, PR. The strategy outlined was participatory research (PP), combined with the technique of participant observation (OP). The results obtained demonstrated a recovery potential of 90.04%. In addition, 35.7 m³ of waste was not disposed of in landfills, equivalent to 7% of the building's volume. This amount was partly due to the successful unbundling operations, mainly deconstruction and dismantling. In addition, the procedures defined in this research seek to increase the useful life of existing buildings and mitigate the problem of landfill overload. Finally, the proposed methodology can be applied to small to medium-sized buildings in interventions that aim at adjustments, such as rehabilitation works, retrofit, or reforms.El objetivo de este trabajo es presentar una metodología para evaluar el potencial de recuperación de edificios que, por el final de su vida útil, se encuentran sujetos a ajustes. Para ello, el alcance del estudio incluyó el seguimiento in situ del proceso de rehabilitación de un edificio de tamaño mediano, construido en la década de 1950, perteneciente a una Institución Federal de Educación Superior (IFES) ubicada en la ciudad de Curitiba, PR. La estrategia esbozada fue la investigación participativa (PP), combinada con la técnica de observación participante (OP). Los resultados obtenidos demostraron un potencial de recuperación del 90,04%. Además, 35,7 m³ de residuos no se eliminaron en vertederos, lo que equivale al 7% del volumen del edificio. Esta cantidad se debió en parte al éxito de las operaciones de desagregación, principalmente deconstrucción y desmantelamiento. Además, los procedimientos definidos en esta investigación buscan aumentar la vida útil de las edificaciones existentes y mitigar el problema de sobrecarga de vertederos. Finalmente, la metodología propuesta se puede aplicar a edificaciones de tamaño pequeño a mediano, en intervenciones que tengan como objetivo ajustes, como obras de rehabilitación, reacondicionamiento o reformas.O objetivo deste trabalho é apresentar uma metodologia para avaliar o potencial de recuperação de edificações que, devido ao fim de sua vida útil, estão sujeitas a adequações. Para tanto, o escopo do estudo compreendeu o acompanhamento in loco do processo de reabilitação de uma edificação de médio porte, construída na década 1950, pertencente a uma instituição federal de ensino superior (IFES) localizada na cidade de Curitiba, PR. A estratégia delineada foi a pesquisa participante (PP), aliada à técnica da observação participante (OP). Os resultados obtidos demonstraram o potencial de recuperação de 90,04%. Além disso, evitou-se a destinação de 35,7 m³ de resíduos aos aterros, o equivalente a 7% do volume do prédio. Este montante, em parte, foi decorrente das operações de desagregação bem-sucedidas, sobretudo desconstrução e desmontagem. Ainda, os procedimentos definidos nesta pesquisa buscam aumentar a vida útil dos edifícios existentes e atenuar o problema da sobrecarga dos aterros. Por fim, a metodologia proposta pode ser aplicada a edificações de pequeno a médio porte, em intervenções que visem a adequações, tais como obras de reabilitação, retrofit ou reformas.Universidade Católica Dom Bosco2021-11-03info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://interacoes.ucdb.br/interacoes/article/view/296610.20435/inter.v22i3.2966Interações (Campo Grande); Interações v. 22, n. 3, jul./set. 2021; 731-745Interações (Campo Grande); Interações v. 22, n. 3, jul./set. 2021; 731-745Interações (Campo Grande); Interações v. 22, n. 3, jul./set. 2021; 731-7451984-042X1518-7012reponame:Interações (Campo Grande. Online)instname:Universidade Católica Dom Bosco (UCDB)instacron:UCDBporhttps://interacoes.ucdb.br/interacoes/article/view/2966/2604Copyright (c) 2020 Interações (Campo Grande)info:eu-repo/semantics/openAccessSilva, Roberto Caldeira daNagalli, AndréCouto, João Pedro2022-06-04T10:50:03Zoai:ojs.multitemasucdb.emnuvens.com.br:article/2966Revistahttps://www.scielo.br/j/inter/PRIhttps://old.scielo.br/oai/scielo-oai.php||interacoes@ucdb.br|| igor@ucdb.br||suzantoniazzo@ucdb.br1984-042X1518-7012opendoar:2022-06-04T10:50:03Interações (Campo Grande. Online) - Universidade Católica Dom Bosco (UCDB)false
dc.title.none.fl_str_mv Evaluation of the potential for building recovery at the end of its useful life: case of a federal institution of higher education
Evaluación del potencial de recuperación de edificios al final de su vida útil: caso de una institución federal de educación superior
Avaliação do potencial de recuperação de edificações ao fim da vida útil: caso de uma instituição federal de ensino superior
title Evaluation of the potential for building recovery at the end of its useful life: case of a federal institution of higher education
spellingShingle Evaluation of the potential for building recovery at the end of its useful life: case of a federal institution of higher education
Silva, Roberto Caldeira da
reuse
deconstruction
lifespan
end-of-life scenarios
construction waste
Reutilização
Desconstrução
vida útil
cenários de fim de vida
resíduos da construção civil
reutilización
deconstrución
vida útil
escenarios de final de vida
residuos de la construcción
title_short Evaluation of the potential for building recovery at the end of its useful life: case of a federal institution of higher education
title_full Evaluation of the potential for building recovery at the end of its useful life: case of a federal institution of higher education
title_fullStr Evaluation of the potential for building recovery at the end of its useful life: case of a federal institution of higher education
title_full_unstemmed Evaluation of the potential for building recovery at the end of its useful life: case of a federal institution of higher education
title_sort Evaluation of the potential for building recovery at the end of its useful life: case of a federal institution of higher education
author Silva, Roberto Caldeira da
author_facet Silva, Roberto Caldeira da
Nagalli, André
Couto, João Pedro
author_role author
author2 Nagalli, André
Couto, João Pedro
author2_role author
author
dc.contributor.author.fl_str_mv Silva, Roberto Caldeira da
Nagalli, André
Couto, João Pedro
dc.subject.por.fl_str_mv reuse
deconstruction
lifespan
end-of-life scenarios
construction waste
Reutilização
Desconstrução
vida útil
cenários de fim de vida
resíduos da construção civil
reutilización
deconstrución
vida útil
escenarios de final de vida
residuos de la construcción
topic reuse
deconstruction
lifespan
end-of-life scenarios
construction waste
Reutilização
Desconstrução
vida útil
cenários de fim de vida
resíduos da construção civil
reutilización
deconstrución
vida útil
escenarios de final de vida
residuos de la construcción
description This work aims to present a methodology to evaluate the potential for the recovery of buildings that, due to the end of their useful life, are subject to adjustments. To this end, the scope of the study included the on-site monitoring of the rehabilitation process of a medium-sized building, built in the 1950s, belonging to a Federal Institution of Higher Education (IFES) located in the city of Curitiba, PR. The strategy outlined was participatory research (PP), combined with the technique of participant observation (OP). The results obtained demonstrated a recovery potential of 90.04%. In addition, 35.7 m³ of waste was not disposed of in landfills, equivalent to 7% of the building's volume. This amount was partly due to the successful unbundling operations, mainly deconstruction and dismantling. In addition, the procedures defined in this research seek to increase the useful life of existing buildings and mitigate the problem of landfill overload. Finally, the proposed methodology can be applied to small to medium-sized buildings in interventions that aim at adjustments, such as rehabilitation works, retrofit, or reforms.
publishDate 2021
dc.date.none.fl_str_mv 2021-11-03
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://interacoes.ucdb.br/interacoes/article/view/2966
10.20435/inter.v22i3.2966
url https://interacoes.ucdb.br/interacoes/article/view/2966
identifier_str_mv 10.20435/inter.v22i3.2966
dc.language.iso.fl_str_mv por
language por
dc.relation.none.fl_str_mv https://interacoes.ucdb.br/interacoes/article/view/2966/2604
dc.rights.driver.fl_str_mv Copyright (c) 2020 Interações (Campo Grande)
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Copyright (c) 2020 Interações (Campo Grande)
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidade Católica Dom Bosco
publisher.none.fl_str_mv Universidade Católica Dom Bosco
dc.source.none.fl_str_mv Interações (Campo Grande); Interações v. 22, n. 3, jul./set. 2021; 731-745
Interações (Campo Grande); Interações v. 22, n. 3, jul./set. 2021; 731-745
Interações (Campo Grande); Interações v. 22, n. 3, jul./set. 2021; 731-745
1984-042X
1518-7012
reponame:Interações (Campo Grande. Online)
instname:Universidade Católica Dom Bosco (UCDB)
instacron:UCDB
instname_str Universidade Católica Dom Bosco (UCDB)
instacron_str UCDB
institution UCDB
reponame_str Interações (Campo Grande. Online)
collection Interações (Campo Grande. Online)
repository.name.fl_str_mv Interações (Campo Grande. Online) - Universidade Católica Dom Bosco (UCDB)
repository.mail.fl_str_mv ||interacoes@ucdb.br|| igor@ucdb.br||suzantoniazzo@ucdb.br
_version_ 1799304615729037312