TRATAMENTO DE ESGOTO SANITÁRIO POR ELETROBIORREATOR A MEMBRANA VISANDO A REMOÇÃO DE NUTRIENTES E A MINIMIZAÇÃO DA COLMATAÇÃO DA MEMBRANA

Detalhes bibliográficos
Autor(a) principal: Manica, Mirelly
Data de Publicação: 2019
Tipo de documento: Dissertação
Idioma: por
Título da fonte: Biblioteca Digital de Teses e Dissertações do UNICENTRO
Texto Completo: http://tede.unicentro.br:8080/jspui/handle/jspui/1108
Resumo: Membrane electro-bioreactors (EMBR) are considered a new technology with high potential for wastewater treatment since it allows the simultaneous application of electrochemical, biodegradation, and membrane filtration processes in a single reactor, which lead to obtain excellent quality final effluent. In this context, the main objective of this study was to design, operate and evaluate the potentiality and efficiency of the EMBR system applied to sanitary wastewater treatment, with emphasis on organic matter and nutrients removal, and membrane fouling process reduction. Firstly, preliminary tests were carried out to determine the specific aeration demand (SAD) and critical flux. Then, three phases were performed in this study. Phase 1, in which run 1 was executed, the EMBR was operated for 30 days and evaluated without the application of electric current, for comparison purposes. In phase 2, it was evaluated the effects of the application of electric current of 5 A.m-2 (run 2) and 15 A.m-2 (run 3) on the performance of the EBRM. Aiming the system stability and minimization of the fouling process, the results obtained in the preliminary tests indicated that the best SAD was 3 m3.m-2.h-1 and the critical flux was 7, 2 Lm-2.h-1. By comparing the results obtained in run 1, run 2 and run 3, we verified that the electric current application provided a significant improvement in the efficiency of the bioreactor with regard to the removal of organic matter (COD), ammoniacal nitrogen (amoniacal-N), color and, mainly, phosphorus (PO43--P). Besides that, it was also observed that the microorganisms’ growth rate and autotrophic and heterotrophic biomass activities were higher with electric current application, which was attributed to the electro-stimulation phenomenon. Regarding to membrane fouling process, high fouling rates were observed throughout the experimental period, which was mainly due to the high-membrane packing density. However, it was verified that the fouling process may have been favored by some other factors, such as: the presence of the Zooglea bacteria; the increase of COD concentration in the mixed liquor; and the lowest concentration of EPS, which resulted in sludge deflocculation. Furthermore, the application of the current density of 15 A.m-2, compared with the current density of 5 A.m-2, was only significant for the removal of ammoniacal nitrogen, which was attributed to the higher nitrogen load applied in run 3. In addition, the higher current density caused a deterioration in the mixed liquor characteristics. Therefore, it could be concluded that the application of electric current, especially at 5 A.m-2, is a potential alternative for improvement of the effluent quality of membrane bioreactor (MBR) systems, mainly regarding to the removal of organic matter and phosphorus from sanitary wastewater, besides being more attractive from the energetic point of view.
id UCEN_858263dddda8e57acdb46a47ca23ff46
oai_identifier_str oai:localhost:jspui/1108
network_acronym_str UCEN
network_name_str Biblioteca Digital de Teses e Dissertações do UNICENTRO
repository_id_str
spelling Vidal, Carlos Magno de Sousahttp://lattes.cnpq.br/1554298849674091Battistelli, André Aguiarhttp://lattes.cnpq.br/5437743957837439080.052.889-13http://lattes.cnpq.br/5436983485268935Manica, Mirelly2019-05-31T13:39:30Z2019-03-13Manica, Mirelly. TRATAMENTO DE ESGOTO SANITÁRIO POR ELETROBIORREATOR A MEMBRANA VISANDO A REMOÇÃO DE NUTRIENTES E A MINIMIZAÇÃO DA COLMATAÇÃO DA MEMBRANA. 2019. 106 f. Dissertação (Programa de Pós-Graduação em Engenharia Sanitária e Ambiental - Mestrado / Associação Ampla com UEPG) - Universidade Estadual do Centro-Oeste, Irati - PR.http://tede.unicentro.br:8080/jspui/handle/jspui/1108Membrane electro-bioreactors (EMBR) are considered a new technology with high potential for wastewater treatment since it allows the simultaneous application of electrochemical, biodegradation, and membrane filtration processes in a single reactor, which lead to obtain excellent quality final effluent. In this context, the main objective of this study was to design, operate and evaluate the potentiality and efficiency of the EMBR system applied to sanitary wastewater treatment, with emphasis on organic matter and nutrients removal, and membrane fouling process reduction. Firstly, preliminary tests were carried out to determine the specific aeration demand (SAD) and critical flux. Then, three phases were performed in this study. Phase 1, in which run 1 was executed, the EMBR was operated for 30 days and evaluated without the application of electric current, for comparison purposes. In phase 2, it was evaluated the effects of the application of electric current of 5 A.m-2 (run 2) and 15 A.m-2 (run 3) on the performance of the EBRM. Aiming the system stability and minimization of the fouling process, the results obtained in the preliminary tests indicated that the best SAD was 3 m3.m-2.h-1 and the critical flux was 7, 2 Lm-2.h-1. By comparing the results obtained in run 1, run 2 and run 3, we verified that the electric current application provided a significant improvement in the efficiency of the bioreactor with regard to the removal of organic matter (COD), ammoniacal nitrogen (amoniacal-N), color and, mainly, phosphorus (PO43--P). Besides that, it was also observed that the microorganisms’ growth rate and autotrophic and heterotrophic biomass activities were higher with electric current application, which was attributed to the electro-stimulation phenomenon. Regarding to membrane fouling process, high fouling rates were observed throughout the experimental period, which was mainly due to the high-membrane packing density. However, it was verified that the fouling process may have been favored by some other factors, such as: the presence of the Zooglea bacteria; the increase of COD concentration in the mixed liquor; and the lowest concentration of EPS, which resulted in sludge deflocculation. Furthermore, the application of the current density of 15 A.m-2, compared with the current density of 5 A.m-2, was only significant for the removal of ammoniacal nitrogen, which was attributed to the higher nitrogen load applied in run 3. In addition, the higher current density caused a deterioration in the mixed liquor characteristics. Therefore, it could be concluded that the application of electric current, especially at 5 A.m-2, is a potential alternative for improvement of the effluent quality of membrane bioreactor (MBR) systems, mainly regarding to the removal of organic matter and phosphorus from sanitary wastewater, besides being more attractive from the energetic point of view.Eletrobiorreatores a membrana (EBRM) são considerados uma tecnologia nova e de elevado potencial para o tratamento de efluentes, uma vez que possibilitam a aplicação simultânea de processos eletroquímicos, de biodegradação e filtração em membranas em um reator de câmara única, levando a obtenção de efluente final de excelente qualidade. Desta forma, objetivo desse estudo foi avaliar a potencialidade do sistema EBRM aplicado ao tratamento de esgoto sanitário, com ênfase na remoção de matéria orgânica e nutrientes, e na minimização do processo de colmatação da membrana, tendo como parâmetro de comparação o desempenho de um BRM convencional. Para tanto, primeiramente foram realizados ensaios preliminares para determinação da taxa de aeração da membrana e do fluxo crítico da membrana. Em seguida o trabalho foi dividido em duas etapas. Na etapa 1, o EBRM foi operado por 30 dias sem a aplicação de corrente elétrica (E1), para fins de comparação. Na etapa 2 foram avaliados os efeitos da aplicação de corrente elétrica de 5 A.m-2 (E2) e de 15 A.m-2 (E3) no desempenho do EBRM. Os resultados obtidos nos ensaios preliminares indicaram que, para maior estabilidade do sistema e minimização do processo de colmatação, a melhor taxa de aeração da membrana (TAM) foi de 3 m3.m-2.h-1 e o fluxo crítico da membrana foi de 7,2 L.m-2.h-1. Comparando os resultados obtidos na E1, E2 e E3, verificou-se que a aplicação da corrente elétrica proporcionou uma melhora significativa na eficiência do biorreator no que se refere à remoção de matéria orgânica, nitrogênio amoniacal, cor verdadeira e, principalmente de fósforo. Observou-se ainda que a taxa de crescimento e atividade da biomassa foram maiores nas estratégias com aplicação da corrente elétrica, o que foi atribuído ao fenômeno de eletroestimulação. No que se refere ao processo de colmatação da membrana, foram observadas elevadas velocidades de colmatação durante todo o período experimental, o que foi atribuído, principalmente, à elevada densidade de empacotamento da membrana o que dificultou a eficiente aeração da mesma. No entanto, verificou-se que o processo de colmatação pode ter sido intensificado por alguns outros fatores, como: a presença da bactéria Zooglea; o aumento da concentração de DQO no licor misto e a menor concentração de EPS, que leva a defloculação do lodo. Já a aplicação da densidade de corrente de 15 A.m-2, quando comparada a aplicação da densidade de corrente de 5 A.m-2, se mostrou significativa apenas para a remoção de nitrogênio amoniacal, o que pode ter sido consequência da maior carga nitrogenada na E3, além de ter apresentado uma piora nas características do licor misto. Portanto, concluiu-se que a aplicação de corrente elétrica, na densidade de 5 A.m-2, se mostra uma alternativa de grande potencial no tratamento de esgoto sanitário em EBRM sobretudo no que tange a remoção de matéria orgânica e fósforo, além de ser mais atrativa do ponto de vista energético.Submitted by Fabiano Jucá (fjuca@unicentro.br) on 2019-05-31T13:39:30Z No. of bitstreams: 1 Mirelly Manica.pdf: 6803148 bytes, checksum: 94c87558a9b60e8dc1f751dc473e1842 (MD5)Made available in DSpace on 2019-05-31T13:39:30Z (GMT). No. of bitstreams: 1 Mirelly Manica.pdf: 6803148 bytes, checksum: 94c87558a9b60e8dc1f751dc473e1842 (MD5) Previous issue date: 2019-03-13Coordenação de Aperfeiçoamento de Pessoal de Nível Superior - CAPESapplication/pdfhttp://tede.unicentro.br:8080/jspui/retrieve/3900/Mirelly%20Manica.pdf.jpgporUniversidade Estadual do Centro-OestePrograma de Pós-Graduação em Engenharia Sanitária e Ambiental (Mestrado / Associação Ampla com UEPG)UNICENTROBrasilUnicentro::Departamento de Ciências Agrárias e Ambientaisbiorreator a membranaesgoto sanitário sintéticoremoção de fósforoeletroestimulaçãoeletrocoagulaçãomembrane bioreactorsanitary wastewaterphosphorus removalelectro-stimulationelectrocoagulationENGENHARIAS::ENGENHARIA SANITARIATRATAMENTO DE ESGOTO SANITÁRIO POR ELETROBIORREATOR A MEMBRANA VISANDO A REMOÇÃO DE NUTRIENTES E A MINIMIZAÇÃO DA COLMATAÇÃO DA MEMBRANAinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesis8192256085508296768600600600600-766110263886347971749800554487433384032075167498588264571info:eu-repo/semantics/openAccessreponame:Biblioteca Digital de Teses e Dissertações do UNICENTROinstname:Universidade Estadual do Centro-Oeste (UNICENTRO)instacron:UNICENTROTHUMBNAILMirelly Manica.pdf.jpgMirelly Manica.pdf.jpgimage/jpeg3407http://localhost:8080/tede/bitstream/jspui/1108/4/Mirelly+Manica.pdf.jpg5c94feaef35f40bb1ef2c5194fd0dff4MD54TEXTMirelly Manica.pdf.txtMirelly Manica.pdf.txttext/plain239237http://localhost:8080/tede/bitstream/jspui/1108/3/Mirelly+Manica.pdf.txta16d31173af37f326ae6befb910dcd40MD53ORIGINALMirelly Manica.pdfMirelly Manica.pdfapplication/pdf6803148http://localhost:8080/tede/bitstream/jspui/1108/2/Mirelly+Manica.pdf94c87558a9b60e8dc1f751dc473e1842MD52LICENSElicense.txtlicense.txttext/plain; charset=utf-82165http://localhost:8080/tede/bitstream/jspui/1108/1/license.txtbd3efa91386c1718a7f26a329fdcb468MD51jspui/11082020-07-08 01:04:10.559oai:localhost:jspui/1108Tk9UQTogQ09MT1FVRSBBUVVJIEEgU1VBIFBSw5NQUklBIExJQ0VOw4dBCkVzdGEgbGljZW7Dp2EgZGUgZXhlbXBsbyDDqSBmb3JuZWNpZGEgYXBlbmFzIHBhcmEgZmlucyBpbmZvcm1hdGl2b3MuCgpMSUNFTsOHQSBERSBESVNUUklCVUnDh8ODTyBOw4NPLUVYQ0xVU0lWQQoKQ29tIGEgYXByZXNlbnRhw6fDo28gZGVzdGEgbGljZW7Dp2EsIHZvY8OqIChvIGF1dG9yIChlcykgb3UgbyB0aXR1bGFyIGRvcyBkaXJlaXRvcyBkZSBhdXRvcikgY29uY2VkZSDDoCBVbml2ZXJzaWRhZGUgClhYWCAoU2lnbGEgZGEgVW5pdmVyc2lkYWRlKSBvIGRpcmVpdG8gbsOjby1leGNsdXNpdm8gZGUgcmVwcm9kdXppciwgIHRyYWR1emlyIChjb25mb3JtZSBkZWZpbmlkbyBhYmFpeG8pLCBlL291IApkaXN0cmlidWlyIGEgc3VhIHRlc2Ugb3UgZGlzc2VydGHDp8OjbyAoaW5jbHVpbmRvIG8gcmVzdW1vKSBwb3IgdG9kbyBvIG11bmRvIG5vIGZvcm1hdG8gaW1wcmVzc28gZSBlbGV0csO0bmljbyBlIAplbSBxdWFscXVlciBtZWlvLCBpbmNsdWluZG8gb3MgZm9ybWF0b3Mgw6F1ZGlvIG91IHbDrWRlby4KClZvY8OqIGNvbmNvcmRhIHF1ZSBhIFNpZ2xhIGRlIFVuaXZlcnNpZGFkZSBwb2RlLCBzZW0gYWx0ZXJhciBvIGNvbnRlw7pkbywgdHJhbnNwb3IgYSBzdWEgdGVzZSBvdSBkaXNzZXJ0YcOnw6NvIApwYXJhIHF1YWxxdWVyIG1laW8gb3UgZm9ybWF0byBwYXJhIGZpbnMgZGUgcHJlc2VydmHDp8Ojby4KClZvY8OqIHRhbWLDqW0gY29uY29yZGEgcXVlIGEgU2lnbGEgZGUgVW5pdmVyc2lkYWRlIHBvZGUgbWFudGVyIG1haXMgZGUgdW1hIGPDs3BpYSBhIHN1YSB0ZXNlIG91IApkaXNzZXJ0YcOnw6NvIHBhcmEgZmlucyBkZSBzZWd1cmFuw6dhLCBiYWNrLXVwIGUgcHJlc2VydmHDp8Ojby4KClZvY8OqIGRlY2xhcmEgcXVlIGEgc3VhIHRlc2Ugb3UgZGlzc2VydGHDp8OjbyDDqSBvcmlnaW5hbCBlIHF1ZSB2b2PDqiB0ZW0gbyBwb2RlciBkZSBjb25jZWRlciBvcyBkaXJlaXRvcyBjb250aWRvcyAKbmVzdGEgbGljZW7Dp2EuIFZvY8OqIHRhbWLDqW0gZGVjbGFyYSBxdWUgbyBkZXDDs3NpdG8gZGEgc3VhIHRlc2Ugb3UgZGlzc2VydGHDp8OjbyBuw6NvLCBxdWUgc2VqYSBkZSBzZXUgCmNvbmhlY2ltZW50bywgaW5mcmluZ2UgZGlyZWl0b3MgYXV0b3JhaXMgZGUgbmluZ3XDqW0uCgpDYXNvIGEgc3VhIHRlc2Ugb3UgZGlzc2VydGHDp8OjbyBjb250ZW5oYSBtYXRlcmlhbCBxdWUgdm9jw6ogbsOjbyBwb3NzdWkgYSB0aXR1bGFyaWRhZGUgZG9zIGRpcmVpdG9zIGF1dG9yYWlzLCB2b2PDqiAKZGVjbGFyYSBxdWUgb2J0ZXZlIGEgcGVybWlzc8OjbyBpcnJlc3RyaXRhIGRvIGRldGVudG9yIGRvcyBkaXJlaXRvcyBhdXRvcmFpcyBwYXJhIGNvbmNlZGVyIMOgIFNpZ2xhIGRlIFVuaXZlcnNpZGFkZSAKb3MgZGlyZWl0b3MgYXByZXNlbnRhZG9zIG5lc3RhIGxpY2Vuw6dhLCBlIHF1ZSBlc3NlIG1hdGVyaWFsIGRlIHByb3ByaWVkYWRlIGRlIHRlcmNlaXJvcyBlc3TDoSBjbGFyYW1lbnRlIAppZGVudGlmaWNhZG8gZSByZWNvbmhlY2lkbyBubyB0ZXh0byBvdSBubyBjb250ZcO6ZG8gZGEgdGVzZSBvdSBkaXNzZXJ0YcOnw6NvIG9yYSBkZXBvc2l0YWRhLgoKQ0FTTyBBIFRFU0UgT1UgRElTU0VSVEHDh8ODTyBPUkEgREVQT1NJVEFEQSBURU5IQSBTSURPIFJFU1VMVEFETyBERSBVTSBQQVRST0PDjU5JTyBPVSAKQVBPSU8gREUgVU1BIEFHw4pOQ0lBIERFIEZPTUVOVE8gT1UgT1VUUk8gT1JHQU5JU01PIFFVRSBOw4NPIFNFSkEgQSBTSUdMQSBERSAKVU5JVkVSU0lEQURFLCBWT0PDiiBERUNMQVJBIFFVRSBSRVNQRUlUT1UgVE9ET1MgRSBRVUFJU1FVRVIgRElSRUlUT1MgREUgUkVWSVPDg08gQ09NTyAKVEFNQsOJTSBBUyBERU1BSVMgT0JSSUdBw4fDlUVTIEVYSUdJREFTIFBPUiBDT05UUkFUTyBPVSBBQ09SRE8uCgpBIFNpZ2xhIGRlIFVuaXZlcnNpZGFkZSBzZSBjb21wcm9tZXRlIGEgaWRlbnRpZmljYXIgY2xhcmFtZW50ZSBvIHNldSBub21lIChzKSBvdSBvKHMpIG5vbWUocykgZG8ocykgCmRldGVudG9yKGVzKSBkb3MgZGlyZWl0b3MgYXV0b3JhaXMgZGEgdGVzZSBvdSBkaXNzZXJ0YcOnw6NvLCBlIG7Do28gZmFyw6EgcXVhbHF1ZXIgYWx0ZXJhw6fDo28sIGFsw6ltIGRhcXVlbGFzIApjb25jZWRpZGFzIHBvciBlc3RhIGxpY2Vuw6dhLgo=Biblioteca Digital de Teses e Dissertaçõeshttp://tede.unicentro.br:8080/jspui/PUBhttp://tede.unicentro.br/tde_oai/oai3.phprepositorio@unicentro.br||fabianoqueiroz@yahoo.com.bropendoar:2020-07-08T04:04:10Biblioteca Digital de Teses e Dissertações do UNICENTRO - Universidade Estadual do Centro-Oeste (UNICENTRO)false
dc.title.por.fl_str_mv TRATAMENTO DE ESGOTO SANITÁRIO POR ELETROBIORREATOR A MEMBRANA VISANDO A REMOÇÃO DE NUTRIENTES E A MINIMIZAÇÃO DA COLMATAÇÃO DA MEMBRANA
title TRATAMENTO DE ESGOTO SANITÁRIO POR ELETROBIORREATOR A MEMBRANA VISANDO A REMOÇÃO DE NUTRIENTES E A MINIMIZAÇÃO DA COLMATAÇÃO DA MEMBRANA
spellingShingle TRATAMENTO DE ESGOTO SANITÁRIO POR ELETROBIORREATOR A MEMBRANA VISANDO A REMOÇÃO DE NUTRIENTES E A MINIMIZAÇÃO DA COLMATAÇÃO DA MEMBRANA
Manica, Mirelly
biorreator a membrana
esgoto sanitário sintético
remoção de fósforo
eletroestimulação
eletrocoagulação
membrane bioreactor
sanitary wastewater
phosphorus removal
electro-stimulation
electrocoagulation
ENGENHARIAS::ENGENHARIA SANITARIA
title_short TRATAMENTO DE ESGOTO SANITÁRIO POR ELETROBIORREATOR A MEMBRANA VISANDO A REMOÇÃO DE NUTRIENTES E A MINIMIZAÇÃO DA COLMATAÇÃO DA MEMBRANA
title_full TRATAMENTO DE ESGOTO SANITÁRIO POR ELETROBIORREATOR A MEMBRANA VISANDO A REMOÇÃO DE NUTRIENTES E A MINIMIZAÇÃO DA COLMATAÇÃO DA MEMBRANA
title_fullStr TRATAMENTO DE ESGOTO SANITÁRIO POR ELETROBIORREATOR A MEMBRANA VISANDO A REMOÇÃO DE NUTRIENTES E A MINIMIZAÇÃO DA COLMATAÇÃO DA MEMBRANA
title_full_unstemmed TRATAMENTO DE ESGOTO SANITÁRIO POR ELETROBIORREATOR A MEMBRANA VISANDO A REMOÇÃO DE NUTRIENTES E A MINIMIZAÇÃO DA COLMATAÇÃO DA MEMBRANA
title_sort TRATAMENTO DE ESGOTO SANITÁRIO POR ELETROBIORREATOR A MEMBRANA VISANDO A REMOÇÃO DE NUTRIENTES E A MINIMIZAÇÃO DA COLMATAÇÃO DA MEMBRANA
author Manica, Mirelly
author_facet Manica, Mirelly
author_role author
dc.contributor.advisor1.fl_str_mv Vidal, Carlos Magno de Sousa
dc.contributor.advisor1Lattes.fl_str_mv http://lattes.cnpq.br/1554298849674091
dc.contributor.advisor-co1.fl_str_mv Battistelli, André Aguiar
dc.contributor.advisor-co1Lattes.fl_str_mv http://lattes.cnpq.br/5437743957837439
dc.contributor.authorID.fl_str_mv 080.052.889-13
dc.contributor.authorLattes.fl_str_mv http://lattes.cnpq.br/5436983485268935
dc.contributor.author.fl_str_mv Manica, Mirelly
contributor_str_mv Vidal, Carlos Magno de Sousa
Battistelli, André Aguiar
dc.subject.por.fl_str_mv biorreator a membrana
esgoto sanitário sintético
remoção de fósforo
eletroestimulação
eletrocoagulação
topic biorreator a membrana
esgoto sanitário sintético
remoção de fósforo
eletroestimulação
eletrocoagulação
membrane bioreactor
sanitary wastewater
phosphorus removal
electro-stimulation
electrocoagulation
ENGENHARIAS::ENGENHARIA SANITARIA
dc.subject.eng.fl_str_mv membrane bioreactor
sanitary wastewater
phosphorus removal
electro-stimulation
electrocoagulation
dc.subject.cnpq.fl_str_mv ENGENHARIAS::ENGENHARIA SANITARIA
description Membrane electro-bioreactors (EMBR) are considered a new technology with high potential for wastewater treatment since it allows the simultaneous application of electrochemical, biodegradation, and membrane filtration processes in a single reactor, which lead to obtain excellent quality final effluent. In this context, the main objective of this study was to design, operate and evaluate the potentiality and efficiency of the EMBR system applied to sanitary wastewater treatment, with emphasis on organic matter and nutrients removal, and membrane fouling process reduction. Firstly, preliminary tests were carried out to determine the specific aeration demand (SAD) and critical flux. Then, three phases were performed in this study. Phase 1, in which run 1 was executed, the EMBR was operated for 30 days and evaluated without the application of electric current, for comparison purposes. In phase 2, it was evaluated the effects of the application of electric current of 5 A.m-2 (run 2) and 15 A.m-2 (run 3) on the performance of the EBRM. Aiming the system stability and minimization of the fouling process, the results obtained in the preliminary tests indicated that the best SAD was 3 m3.m-2.h-1 and the critical flux was 7, 2 Lm-2.h-1. By comparing the results obtained in run 1, run 2 and run 3, we verified that the electric current application provided a significant improvement in the efficiency of the bioreactor with regard to the removal of organic matter (COD), ammoniacal nitrogen (amoniacal-N), color and, mainly, phosphorus (PO43--P). Besides that, it was also observed that the microorganisms’ growth rate and autotrophic and heterotrophic biomass activities were higher with electric current application, which was attributed to the electro-stimulation phenomenon. Regarding to membrane fouling process, high fouling rates were observed throughout the experimental period, which was mainly due to the high-membrane packing density. However, it was verified that the fouling process may have been favored by some other factors, such as: the presence of the Zooglea bacteria; the increase of COD concentration in the mixed liquor; and the lowest concentration of EPS, which resulted in sludge deflocculation. Furthermore, the application of the current density of 15 A.m-2, compared with the current density of 5 A.m-2, was only significant for the removal of ammoniacal nitrogen, which was attributed to the higher nitrogen load applied in run 3. In addition, the higher current density caused a deterioration in the mixed liquor characteristics. Therefore, it could be concluded that the application of electric current, especially at 5 A.m-2, is a potential alternative for improvement of the effluent quality of membrane bioreactor (MBR) systems, mainly regarding to the removal of organic matter and phosphorus from sanitary wastewater, besides being more attractive from the energetic point of view.
publishDate 2019
dc.date.accessioned.fl_str_mv 2019-05-31T13:39:30Z
dc.date.issued.fl_str_mv 2019-03-13
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/masterThesis
format masterThesis
status_str publishedVersion
dc.identifier.citation.fl_str_mv Manica, Mirelly. TRATAMENTO DE ESGOTO SANITÁRIO POR ELETROBIORREATOR A MEMBRANA VISANDO A REMOÇÃO DE NUTRIENTES E A MINIMIZAÇÃO DA COLMATAÇÃO DA MEMBRANA. 2019. 106 f. Dissertação (Programa de Pós-Graduação em Engenharia Sanitária e Ambiental - Mestrado / Associação Ampla com UEPG) - Universidade Estadual do Centro-Oeste, Irati - PR.
dc.identifier.uri.fl_str_mv http://tede.unicentro.br:8080/jspui/handle/jspui/1108
identifier_str_mv Manica, Mirelly. TRATAMENTO DE ESGOTO SANITÁRIO POR ELETROBIORREATOR A MEMBRANA VISANDO A REMOÇÃO DE NUTRIENTES E A MINIMIZAÇÃO DA COLMATAÇÃO DA MEMBRANA. 2019. 106 f. Dissertação (Programa de Pós-Graduação em Engenharia Sanitária e Ambiental - Mestrado / Associação Ampla com UEPG) - Universidade Estadual do Centro-Oeste, Irati - PR.
url http://tede.unicentro.br:8080/jspui/handle/jspui/1108
dc.language.iso.fl_str_mv por
language por
dc.relation.program.fl_str_mv 8192256085508296768
dc.relation.confidence.fl_str_mv 600
600
600
600
dc.relation.department.fl_str_mv -7661102638863479717
dc.relation.cnpq.fl_str_mv 4980055448743338403
dc.relation.sponsorship.fl_str_mv 2075167498588264571
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidade Estadual do Centro-Oeste
dc.publisher.program.fl_str_mv Programa de Pós-Graduação em Engenharia Sanitária e Ambiental (Mestrado / Associação Ampla com UEPG)
dc.publisher.initials.fl_str_mv UNICENTRO
dc.publisher.country.fl_str_mv Brasil
dc.publisher.department.fl_str_mv Unicentro::Departamento de Ciências Agrárias e Ambientais
publisher.none.fl_str_mv Universidade Estadual do Centro-Oeste
dc.source.none.fl_str_mv reponame:Biblioteca Digital de Teses e Dissertações do UNICENTRO
instname:Universidade Estadual do Centro-Oeste (UNICENTRO)
instacron:UNICENTRO
instname_str Universidade Estadual do Centro-Oeste (UNICENTRO)
instacron_str UNICENTRO
institution UNICENTRO
reponame_str Biblioteca Digital de Teses e Dissertações do UNICENTRO
collection Biblioteca Digital de Teses e Dissertações do UNICENTRO
bitstream.url.fl_str_mv http://localhost:8080/tede/bitstream/jspui/1108/4/Mirelly+Manica.pdf.jpg
http://localhost:8080/tede/bitstream/jspui/1108/3/Mirelly+Manica.pdf.txt
http://localhost:8080/tede/bitstream/jspui/1108/2/Mirelly+Manica.pdf
http://localhost:8080/tede/bitstream/jspui/1108/1/license.txt
bitstream.checksum.fl_str_mv 5c94feaef35f40bb1ef2c5194fd0dff4
a16d31173af37f326ae6befb910dcd40
94c87558a9b60e8dc1f751dc473e1842
bd3efa91386c1718a7f26a329fdcb468
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
MD5
repository.name.fl_str_mv Biblioteca Digital de Teses e Dissertações do UNICENTRO - Universidade Estadual do Centro-Oeste (UNICENTRO)
repository.mail.fl_str_mv repositorio@unicentro.br||fabianoqueiroz@yahoo.com.br
_version_ 1811733816664915968