Resumo: | This article presents a synthesis of a doctorate thesis that proposes a model to improve the production planning process in the construction industry through the systematization of management anticipatory measures. Such systematization is performed through three sequential steps: identification of anticipations that should be present in the production flow; interpretation of what sort of managerial action might be related to the inclusion those anticipations; and due consideration and placing of such management actions in the production planning process. Multiple case studies were conducted on real sites, developing a number of examples of possible anticipatory measures. Most of the time, the lack of proper consideration of such measures was related to problems in the flow of work, thus giving support to the need of improving the building site planning process through this new concept. A number of anticipatory measures are illustrated throughout the text. |
id |
UFC-7_1c5538877f9c7f029348815df542a18b |
---|---|
oai_identifier_str |
oai:repositorio.ufc.br:riufc/7142 |
network_acronym_str |
UFC-7 |
network_name_str |
Repositório Institucional da Universidade Federal do Ceará (UFC) |
repository_id_str |
|
spelling |
A contribution to production planning improvement in the construction industry through the anticipation conceptPlanejamento da produçãoIndústria de construção civilThis article presents a synthesis of a doctorate thesis that proposes a model to improve the production planning process in the construction industry through the systematization of management anticipatory measures. Such systematization is performed through three sequential steps: identification of anticipations that should be present in the production flow; interpretation of what sort of managerial action might be related to the inclusion those anticipations; and due consideration and placing of such management actions in the production planning process. Multiple case studies were conducted on real sites, developing a number of examples of possible anticipatory measures. Most of the time, the lack of proper consideration of such measures was related to problems in the flow of work, thus giving support to the need of improving the building site planning process through this new concept. A number of anticipatory measures are illustrated throughout the text.International Conference on Production Research2014-01-14T18:19:17Z2014-01-14T18:19:17Z2006info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/conferenceObjectapplication/pdfMACHADO, R. L. ; HEINECK, L. F. M. A contribution to production planning improvement in the construction industry through the anticipation concept. In: INTERNATIONAL CONFERENCE ON PRODUCTION RESEARCH, 3., 2006, Hong Kong. Anais... Hong Kong: ICPR, 2006.http://www.repositorio.ufc.br/handle/riufc/7142Machado, Ricardo LuizHeineck, Luiz Fernando Mählmannengreponame:Repositório Institucional da Universidade Federal do Ceará (UFC)instname:Universidade Federal do Ceará (UFC)instacron:UFCinfo:eu-repo/semantics/openAccess2023-03-24T13:40:15Zoai:repositorio.ufc.br:riufc/7142Repositório InstitucionalPUBhttp://www.repositorio.ufc.br/ri-oai/requestbu@ufc.br || repositorio@ufc.bropendoar:2024-09-11T18:42:06.325365Repositório Institucional da Universidade Federal do Ceará (UFC) - Universidade Federal do Ceará (UFC)false |
dc.title.none.fl_str_mv |
A contribution to production planning improvement in the construction industry through the anticipation concept |
title |
A contribution to production planning improvement in the construction industry through the anticipation concept |
spellingShingle |
A contribution to production planning improvement in the construction industry through the anticipation concept Machado, Ricardo Luiz Planejamento da produção Indústria de construção civil |
title_short |
A contribution to production planning improvement in the construction industry through the anticipation concept |
title_full |
A contribution to production planning improvement in the construction industry through the anticipation concept |
title_fullStr |
A contribution to production planning improvement in the construction industry through the anticipation concept |
title_full_unstemmed |
A contribution to production planning improvement in the construction industry through the anticipation concept |
title_sort |
A contribution to production planning improvement in the construction industry through the anticipation concept |
author |
Machado, Ricardo Luiz |
author_facet |
Machado, Ricardo Luiz Heineck, Luiz Fernando Mählmann |
author_role |
author |
author2 |
Heineck, Luiz Fernando Mählmann |
author2_role |
author |
dc.contributor.author.fl_str_mv |
Machado, Ricardo Luiz Heineck, Luiz Fernando Mählmann |
dc.subject.por.fl_str_mv |
Planejamento da produção Indústria de construção civil |
topic |
Planejamento da produção Indústria de construção civil |
description |
This article presents a synthesis of a doctorate thesis that proposes a model to improve the production planning process in the construction industry through the systematization of management anticipatory measures. Such systematization is performed through three sequential steps: identification of anticipations that should be present in the production flow; interpretation of what sort of managerial action might be related to the inclusion those anticipations; and due consideration and placing of such management actions in the production planning process. Multiple case studies were conducted on real sites, developing a number of examples of possible anticipatory measures. Most of the time, the lack of proper consideration of such measures was related to problems in the flow of work, thus giving support to the need of improving the building site planning process through this new concept. A number of anticipatory measures are illustrated throughout the text. |
publishDate |
2006 |
dc.date.none.fl_str_mv |
2006 2014-01-14T18:19:17Z 2014-01-14T18:19:17Z |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/conferenceObject |
format |
conferenceObject |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
MACHADO, R. L. ; HEINECK, L. F. M. A contribution to production planning improvement in the construction industry through the anticipation concept. In: INTERNATIONAL CONFERENCE ON PRODUCTION RESEARCH, 3., 2006, Hong Kong. Anais... Hong Kong: ICPR, 2006. http://www.repositorio.ufc.br/handle/riufc/7142 |
identifier_str_mv |
MACHADO, R. L. ; HEINECK, L. F. M. A contribution to production planning improvement in the construction industry through the anticipation concept. In: INTERNATIONAL CONFERENCE ON PRODUCTION RESEARCH, 3., 2006, Hong Kong. Anais... Hong Kong: ICPR, 2006. |
url |
http://www.repositorio.ufc.br/handle/riufc/7142 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
International Conference on Production Research |
publisher.none.fl_str_mv |
International Conference on Production Research |
dc.source.none.fl_str_mv |
reponame:Repositório Institucional da Universidade Federal do Ceará (UFC) instname:Universidade Federal do Ceará (UFC) instacron:UFC |
instname_str |
Universidade Federal do Ceará (UFC) |
instacron_str |
UFC |
institution |
UFC |
reponame_str |
Repositório Institucional da Universidade Federal do Ceará (UFC) |
collection |
Repositório Institucional da Universidade Federal do Ceará (UFC) |
repository.name.fl_str_mv |
Repositório Institucional da Universidade Federal do Ceará (UFC) - Universidade Federal do Ceará (UFC) |
repository.mail.fl_str_mv |
bu@ufc.br || repositorio@ufc.br |
_version_ |
1813028912210378752 |