Modelado y simulación computacional en una línea de producción de una empresa del segmento de confecciones ubicada en Telêmaco Borba-PR
Autor(a) principal: | |
---|---|
Data de Publicação: | 2024 |
Outros Autores: | , |
Tipo de documento: | Artigo |
Idioma: | por eng spa |
Título da fonte: | Brazilian Journal of Production Engineering |
Texto Completo: | https://periodicos.ufes.br/bjpe/article/view/43725 |
Resumo: | The overarching goal is to model and simulate a production line of a clothing company located in Telêmaco Borba – PR, with the aim of proposing enhancements to production capacity. The research method encompasses conception stages, involving the creation of a conceptual model, implementation stages, encompassing scenario creation, and analysis stages. Scenario 1 proposed the removal of distribution and return to the company, along with the hiring of one employee. Scenario 2 suggested eliminating distribution and return processes and employing two operators who could operate all three machines simultaneously. The third and final scenario also involved eliminating distribution and return processes and hiring three employees, allowing for the simultaneous operation of the three machines and the addition of a machine to the sewing and finishing process. Through the analysis of data obtained from simulations, it was concluded that the optimal scenario for the company is scenario 3, as it demonstrated an 8.67% increase in production capacity. |
id |
UFES-11_377e55b07829f00346edd5b44f4de77c |
---|---|
oai_identifier_str |
oai:periodicos.ufes.br:article/43725 |
network_acronym_str |
UFES-11 |
network_name_str |
Brazilian Journal of Production Engineering |
repository_id_str |
|
spelling |
Modelado y simulación computacional en una línea de producción de una empresa del segmento de confecciones ubicada en Telêmaco Borba-PRModelagem e simulação computacional em uma linha de produção de uma empresa do segmento de confecção localizada em Telêmaco Borba-PRModeling and computational simulation in a production line of a company in the clothing segment located in Telêmaco Borba-PRModelagemSimulaçãoFlexSim®Indústria TêxtilCapacidade ProdutivaLead TimeModelingSimulationFlexSim®Textile industryProduction capacityLead timeModelizaciónSimulaciónFlexSim®Industria textilCapacidad de producciónPlazo de entregaThe overarching goal is to model and simulate a production line of a clothing company located in Telêmaco Borba – PR, with the aim of proposing enhancements to production capacity. The research method encompasses conception stages, involving the creation of a conceptual model, implementation stages, encompassing scenario creation, and analysis stages. Scenario 1 proposed the removal of distribution and return to the company, along with the hiring of one employee. Scenario 2 suggested eliminating distribution and return processes and employing two operators who could operate all three machines simultaneously. The third and final scenario also involved eliminating distribution and return processes and hiring three employees, allowing for the simultaneous operation of the three machines and the addition of a machine to the sewing and finishing process. Through the analysis of data obtained from simulations, it was concluded that the optimal scenario for the company is scenario 3, as it demonstrated an 8.67% increase in production capacity.O objetivo deste estudo é modelar e simular uma linha de produção de uma empresa de confecção localizada na cidade de Telêmaco Borba – PR, visando propor melhorias para a capacidade produtiva. O método de pesquisa passa pelas etapas de concepção, com a criação do modelo conceitual, etapa de implementação, com a criação de cenários e etapa de análise. O cenário 1 propôs a remoção da distribuição e do retorno a empresa e contratação de um colaborador, o cenário 2 a remoção da distribuição e retorno a empresa e contratação de dois operadores podendo operar as três máquinas ao mesmo tempo, o terceiro e último cenário também propôs a remoção dos processos de distribuição e retorno a empresa além da contratação de 3 funcionários, podendo assim, operar as três máquinas simultaneamente e adicionar uma máquina ao processo de costura e acabamento. Com a análise dos dados obtidos das simulações, concluiu-se que o melhor cenário para a empresa é o cenário 3, pois, apresentou 8,67% de aumento para a capacidade produtiva.El objetivo general es modelar y simular una línea de producción de una empresa de confección ubicada en la ciudad de Telêmaco Borba, en el estado de Paraná, Brasil, con el propósito de proponer mejoras en la capacidad productiva. El método de investigación atraviesa diferentes etapas: la fase de concepción, que implica la creación del modelo conceptual; la fase de implementación, que conlleva la generación de escenarios; y la fase de análisis. El primer escenario propone eliminar la distribución y el retorno a la empresa, además de contratar a un colaborador. El segundo escenario plantea la eliminación de la distribución y el retorno a la empresa, junto con la contratación de dos operadores que pueden operar las tres máquinas simultáneamente. El tercer y último escenario también sugiere eliminar los procesos de distribución y retorno a la empresa, y a la vez contratar a tres empleados, permitiendo así la operación simultánea de las tres máquinas y la adición de una máquina al proceso de costura y acabado. Tras analizar los datos obtenidos de las simulaciones, se concluye que el mejor escenario para la empresa es el tercero, ya que presenta un aumento del 8,67% en la capacidad productiva.Universidade Federal do Espírito Santo - UFES2024-03-14info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfaudio/mpegaudio/mpegimage/pngimage/pngimage/pnghttps://periodicos.ufes.br/bjpe/article/view/4372510.47456/bjpe.v10i1.43725Brazilian Journal of Production Engineering; Vol. 10 No. 1 (2024): Regular Issue (January - March); 147-166Brazilian Journal of Production Engineering; Vol. 10 Núm. 1 (2024): Edición regular (enero - marzo) ; 147-166Brazilian Journal of Production Engineering; v. 10 n. 1 (2024): Número Regular (Janeiro - Março); 147-1662447-558010.47456/bjpe.v10i1reponame:Brazilian Journal of Production Engineeringinstname:Universidade Federal do Espírito Santo (UFES)instacron:UFESporengspahttps://periodicos.ufes.br/bjpe/article/view/43725/29733https://periodicos.ufes.br/bjpe/article/view/43725/29732https://periodicos.ufes.br/bjpe/article/view/43725/29731https://periodicos.ufes.br/bjpe/article/view/43725/29728https://periodicos.ufes.br/bjpe/article/view/43725/29729https://periodicos.ufes.br/bjpe/article/view/43725/29730https://periodicos.ufes.br/bjpe/article/view/43725/29834https://periodicos.ufes.br/bjpe/article/view/43725/29768Copyright (c) 2024 Brazilian Journal of Production Engineeringhttps://creativecommons.org/licenses/by-nc-sa/4.0info:eu-repo/semantics/openAccess Sousa, Vitor Gabriel SantosBarreto, Gustavo Szmoskidos Santos Filho, Vitor Hugo2024-04-12T13:44:58Zoai:periodicos.ufes.br:article/43725Revistahttps://periodicos.ufes.br/bjpePUBhttps://periodicos.ufes.br/bjpe/oairodrigo.r.freitas@ufes.br2447-55802447-5580opendoar:2024-04-12T13:44:58Brazilian Journal of Production Engineering - Universidade Federal do Espírito Santo (UFES)false |
dc.title.none.fl_str_mv |
Modelado y simulación computacional en una línea de producción de una empresa del segmento de confecciones ubicada en Telêmaco Borba-PR Modelagem e simulação computacional em uma linha de produção de uma empresa do segmento de confecção localizada em Telêmaco Borba-PR Modeling and computational simulation in a production line of a company in the clothing segment located in Telêmaco Borba-PR |
title |
Modelado y simulación computacional en una línea de producción de una empresa del segmento de confecciones ubicada en Telêmaco Borba-PR |
spellingShingle |
Modelado y simulación computacional en una línea de producción de una empresa del segmento de confecciones ubicada en Telêmaco Borba-PR Sousa, Vitor Gabriel Santos Modelagem Simulação FlexSim® Indústria Têxtil Capacidade Produtiva Lead Time Modeling Simulation FlexSim® Textile industry Production capacity Lead time Modelización Simulación FlexSim® Industria textil Capacidad de producción Plazo de entrega |
title_short |
Modelado y simulación computacional en una línea de producción de una empresa del segmento de confecciones ubicada en Telêmaco Borba-PR |
title_full |
Modelado y simulación computacional en una línea de producción de una empresa del segmento de confecciones ubicada en Telêmaco Borba-PR |
title_fullStr |
Modelado y simulación computacional en una línea de producción de una empresa del segmento de confecciones ubicada en Telêmaco Borba-PR |
title_full_unstemmed |
Modelado y simulación computacional en una línea de producción de una empresa del segmento de confecciones ubicada en Telêmaco Borba-PR |
title_sort |
Modelado y simulación computacional en una línea de producción de una empresa del segmento de confecciones ubicada en Telêmaco Borba-PR |
author |
Sousa, Vitor Gabriel Santos |
author_facet |
Sousa, Vitor Gabriel Santos Barreto, Gustavo Szmoski dos Santos Filho, Vitor Hugo |
author_role |
author |
author2 |
Barreto, Gustavo Szmoski dos Santos Filho, Vitor Hugo |
author2_role |
author author |
dc.contributor.author.fl_str_mv |
Sousa, Vitor Gabriel Santos Barreto, Gustavo Szmoski dos Santos Filho, Vitor Hugo |
dc.subject.por.fl_str_mv |
Modelagem Simulação FlexSim® Indústria Têxtil Capacidade Produtiva Lead Time Modeling Simulation FlexSim® Textile industry Production capacity Lead time Modelización Simulación FlexSim® Industria textil Capacidad de producción Plazo de entrega |
topic |
Modelagem Simulação FlexSim® Indústria Têxtil Capacidade Produtiva Lead Time Modeling Simulation FlexSim® Textile industry Production capacity Lead time Modelización Simulación FlexSim® Industria textil Capacidad de producción Plazo de entrega |
description |
The overarching goal is to model and simulate a production line of a clothing company located in Telêmaco Borba – PR, with the aim of proposing enhancements to production capacity. The research method encompasses conception stages, involving the creation of a conceptual model, implementation stages, encompassing scenario creation, and analysis stages. Scenario 1 proposed the removal of distribution and return to the company, along with the hiring of one employee. Scenario 2 suggested eliminating distribution and return processes and employing two operators who could operate all three machines simultaneously. The third and final scenario also involved eliminating distribution and return processes and hiring three employees, allowing for the simultaneous operation of the three machines and the addition of a machine to the sewing and finishing process. Through the analysis of data obtained from simulations, it was concluded that the optimal scenario for the company is scenario 3, as it demonstrated an 8.67% increase in production capacity. |
publishDate |
2024 |
dc.date.none.fl_str_mv |
2024-03-14 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://periodicos.ufes.br/bjpe/article/view/43725 10.47456/bjpe.v10i1.43725 |
url |
https://periodicos.ufes.br/bjpe/article/view/43725 |
identifier_str_mv |
10.47456/bjpe.v10i1.43725 |
dc.language.iso.fl_str_mv |
por eng spa |
language |
por eng spa |
dc.relation.none.fl_str_mv |
https://periodicos.ufes.br/bjpe/article/view/43725/29733 https://periodicos.ufes.br/bjpe/article/view/43725/29732 https://periodicos.ufes.br/bjpe/article/view/43725/29731 https://periodicos.ufes.br/bjpe/article/view/43725/29728 https://periodicos.ufes.br/bjpe/article/view/43725/29729 https://periodicos.ufes.br/bjpe/article/view/43725/29730 https://periodicos.ufes.br/bjpe/article/view/43725/29834 https://periodicos.ufes.br/bjpe/article/view/43725/29768 |
dc.rights.driver.fl_str_mv |
Copyright (c) 2024 Brazilian Journal of Production Engineering https://creativecommons.org/licenses/by-nc-sa/4.0 info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Copyright (c) 2024 Brazilian Journal of Production Engineering https://creativecommons.org/licenses/by-nc-sa/4.0 |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf audio/mpeg audio/mpeg image/png image/png image/png |
dc.publisher.none.fl_str_mv |
Universidade Federal do Espírito Santo - UFES |
publisher.none.fl_str_mv |
Universidade Federal do Espírito Santo - UFES |
dc.source.none.fl_str_mv |
Brazilian Journal of Production Engineering; Vol. 10 No. 1 (2024): Regular Issue (January - March); 147-166 Brazilian Journal of Production Engineering; Vol. 10 Núm. 1 (2024): Edición regular (enero - marzo) ; 147-166 Brazilian Journal of Production Engineering; v. 10 n. 1 (2024): Número Regular (Janeiro - Março); 147-166 2447-5580 10.47456/bjpe.v10i1 reponame:Brazilian Journal of Production Engineering instname:Universidade Federal do Espírito Santo (UFES) instacron:UFES |
instname_str |
Universidade Federal do Espírito Santo (UFES) |
instacron_str |
UFES |
institution |
UFES |
reponame_str |
Brazilian Journal of Production Engineering |
collection |
Brazilian Journal of Production Engineering |
repository.name.fl_str_mv |
Brazilian Journal of Production Engineering - Universidade Federal do Espírito Santo (UFES) |
repository.mail.fl_str_mv |
rodrigo.r.freitas@ufes.br |
_version_ |
1797047318644523008 |