Priorização de medidas de prevenção pela utilização da ferramenta FMEA na análise de riscos na construção civil
Autor(a) principal: | |
---|---|
Data de Publicação: | 2023 |
Outros Autores: | , , |
Tipo de documento: | Artigo |
Idioma: | por eng spa |
Título da fonte: | Brazilian Journal of Production Engineering |
Texto Completo: | https://periodicos.ufes.br/bjpe/article/view/40211 |
Resumo: | According to Social Security statistics for 2021, the number of accidents at work in Brazil remains high, with 34,000 belonging to the construction sector this year. In this scenario, risk management has high importance in risk analysis for accident prevention. Focusing on this issue, this research was carried out in the civil construction sector between the years 2021 and 2022, with the general objective of prioritizing preventive measures related to work safety in civil construction, verified by the use of the Failure Modes and Effects Analysis (FMEA) tool. In order to obtain data, observational and photographic records were made in the work analyzed in relation to the risks to which workers are exposed. Subsequently, the risk priority analysis was carried out using the FMEA tool. Among the high-Risk Priority Numbers (RPNs) there is the non-use of personal protective equipment, a serious situation due to its high risk. Thus, it can be concluded that the FMEA method contributed to the prioritization of preventive measures related to work safety for the analyzed civil construction work. |
id |
UFES-11_b8e9865ddbde470257e65137fd3bd26b |
---|---|
oai_identifier_str |
oai:periodicos.ufes.br:article/40211 |
network_acronym_str |
UFES-11 |
network_name_str |
Brazilian Journal of Production Engineering |
repository_id_str |
|
spelling |
Priorização de medidas de prevenção pela utilização da ferramenta FMEA na análise de riscos na construção civilPrioritization of preventive measures by using the FMEA tool in risk analysis in civil constructionPriorización de medidas de prevención mediante el uso de la herramienta FMEA en el análisis de riesgos en la construcción civilSegurança do trabalhoconstrução civilFMEAWorkplace safetyconstructionFMEASeguridad de trabajoconstrucción civilFMEAAccording to Social Security statistics for 2021, the number of accidents at work in Brazil remains high, with 34,000 belonging to the construction sector this year. In this scenario, risk management has high importance in risk analysis for accident prevention. Focusing on this issue, this research was carried out in the civil construction sector between the years 2021 and 2022, with the general objective of prioritizing preventive measures related to work safety in civil construction, verified by the use of the Failure Modes and Effects Analysis (FMEA) tool. In order to obtain data, observational and photographic records were made in the work analyzed in relation to the risks to which workers are exposed. Subsequently, the risk priority analysis was carried out using the FMEA tool. Among the high-Risk Priority Numbers (RPNs) there is the non-use of personal protective equipment, a serious situation due to its high risk. Thus, it can be concluded that the FMEA method contributed to the prioritization of preventive measures related to work safety for the analyzed civil construction work.Según las estadísticas de la Seguridad Social para 2021, el número de accidentes de trabajo en Brasil sigue siendo alto, con 34.000 pertenecientes al sector de la construcción este año. En este escenario, la gestión de riesgos tiene una gran importancia en el análisis de riesgos para la prevención de accidentes. Centrándose en este tema, esta investigación se llevó a cabo en el sector de la construcción civil entre los años 2021 y 2022, con el objetivo general de priorizar las medidas preventivas relacionadas con la seguridad en el trabajo, verificado mediante el uso de la herramienta Análisis de Modos y Efectos de Falla - FMEA (Análisis Modo y Efecto de Falla), para una obra de construcción civil. Para la obtención de datos se realizaron registros observacionales y fotográficos en los trabajos analizados en relación a los riesgos a los que están expuestos los trabajadores. Posteriormente se realizó el análisis de prioridad de riesgos mediante la herramienta FMEA, y entre los RPN (Risk Priority Numbers) altos se encuentra la no utilización de equipos de protección personal, situación grave por su alto riesgo. Así, se puede concluir que el método FMEA contribuyó a la priorización de medidas preventivas relacionadas con la seguridad en el trabajo para la obra de construcción civil analizada.De acordo com estatísticas da Previdência Social de 2021, o número de acidentes do trabalho no Brasil permanece elevado, sendo que neste ano 34 mil pertencem ao setor da construção. Neste cenário, o gerenciamento de riscos tem elevada importância na análise de riscos para a prevenção de acidentes. Com foco nesta questão, esta pesquisa foi realizada no setor da construção civil entre os anos de 2021 e 2022, tendo como objetivo geral priorizar medidas de prevenção relativas a segurança do trabalho, constatadas pela utilização da ferramenta Análise de Modos de Falhas e Efeitos - FMEA (Failure Mode and Effect Analysis), para uma obra de construção civil. Para a obtenção de dados, foram realizados registros observacionais e fotográficos na obra analisada em relação aos riscos aos quais estão expostos os trabalhadores. Posteriormente, foi realizada a análise da prioridade de riscos com a utilização da ferramenta FMEA, sendo que entre os elevados RPNs (Números de Prioridade de Risco) está a não utilização de equipamentos de proteção individual, situação grave por apresentar alto risco. Assim, pôde-se concluir que o método FMEA contribuiu para a priorização de medidas de prevenção relativas a segurança do trabalho para a obra de construção civil analisada.Universidade Federal do Espírito Santo - UFES2023-05-02info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionArtigo avaliado pelos paresapplication/pdfapplication/pdfimage/jpegimage/jpegimage/jpegaudio/mpegaudio/mpeghttps://periodicos.ufes.br/bjpe/article/view/4021110.47456/bjpe.v9i2.40211Brazilian Journal of Production Engineering; Vol. 9 No. 2 (2023): Regular Issue (April - June) *Publication Articles Continuous Flow*; 14-26Brazilian Journal of Production Engineering; Vol. 9 Núm. 2 (2023): Edición regular (abril - junio) *Artículos de publicación Flujo continuo*; 14-26Brazilian Journal of Production Engineering; v. 9 n. 2 (2023): Número Regular (Abril - Junho); 14-262447-558010.47456/bjpe.v9i2reponame:Brazilian Journal of Production Engineeringinstname:Universidade Federal do Espírito Santo (UFES)instacron:UFESporengspahttps://periodicos.ufes.br/bjpe/article/view/40211/27120https://periodicos.ufes.br/bjpe/article/view/40211/27223https://periodicos.ufes.br/bjpe/article/view/40211/27008https://periodicos.ufes.br/bjpe/article/view/40211/27009https://periodicos.ufes.br/bjpe/article/view/40211/27010https://periodicos.ufes.br/bjpe/article/view/40211/27011https://periodicos.ufes.br/bjpe/article/view/40211/27012https://periodicos.ufes.br/bjpe/article/view/40211/27154Copyright (c) 2023 Brazilian Journal of Production Engineeringhttps://creativecommons.org/licenses/by-nc-sa/4.0info:eu-repo/semantics/openAccessZaupa, Juliana Caroline TeixeiraCatai, Rodrigo EduardoCorrêa, Janine NicolosiZaupa, Julio Cesar2023-09-29T17:29:46Zoai:periodicos.ufes.br:article/40211Revistahttps://periodicos.ufes.br/bjpePUBhttps://periodicos.ufes.br/bjpe/oairodrigo.r.freitas@ufes.br2447-55802447-5580opendoar:2023-09-29T17:29:46Brazilian Journal of Production Engineering - Universidade Federal do Espírito Santo (UFES)false |
dc.title.none.fl_str_mv |
Priorização de medidas de prevenção pela utilização da ferramenta FMEA na análise de riscos na construção civil Prioritization of preventive measures by using the FMEA tool in risk analysis in civil construction Priorización de medidas de prevención mediante el uso de la herramienta FMEA en el análisis de riesgos en la construcción civil |
title |
Priorização de medidas de prevenção pela utilização da ferramenta FMEA na análise de riscos na construção civil |
spellingShingle |
Priorização de medidas de prevenção pela utilização da ferramenta FMEA na análise de riscos na construção civil Zaupa, Juliana Caroline Teixeira Segurança do trabalho construção civil FMEA Workplace safety construction FMEA Seguridad de trabajo construcción civil FMEA |
title_short |
Priorização de medidas de prevenção pela utilização da ferramenta FMEA na análise de riscos na construção civil |
title_full |
Priorização de medidas de prevenção pela utilização da ferramenta FMEA na análise de riscos na construção civil |
title_fullStr |
Priorização de medidas de prevenção pela utilização da ferramenta FMEA na análise de riscos na construção civil |
title_full_unstemmed |
Priorização de medidas de prevenção pela utilização da ferramenta FMEA na análise de riscos na construção civil |
title_sort |
Priorização de medidas de prevenção pela utilização da ferramenta FMEA na análise de riscos na construção civil |
author |
Zaupa, Juliana Caroline Teixeira |
author_facet |
Zaupa, Juliana Caroline Teixeira Catai, Rodrigo Eduardo Corrêa, Janine Nicolosi Zaupa, Julio Cesar |
author_role |
author |
author2 |
Catai, Rodrigo Eduardo Corrêa, Janine Nicolosi Zaupa, Julio Cesar |
author2_role |
author author author |
dc.contributor.author.fl_str_mv |
Zaupa, Juliana Caroline Teixeira Catai, Rodrigo Eduardo Corrêa, Janine Nicolosi Zaupa, Julio Cesar |
dc.subject.por.fl_str_mv |
Segurança do trabalho construção civil FMEA Workplace safety construction FMEA Seguridad de trabajo construcción civil FMEA |
topic |
Segurança do trabalho construção civil FMEA Workplace safety construction FMEA Seguridad de trabajo construcción civil FMEA |
description |
According to Social Security statistics for 2021, the number of accidents at work in Brazil remains high, with 34,000 belonging to the construction sector this year. In this scenario, risk management has high importance in risk analysis for accident prevention. Focusing on this issue, this research was carried out in the civil construction sector between the years 2021 and 2022, with the general objective of prioritizing preventive measures related to work safety in civil construction, verified by the use of the Failure Modes and Effects Analysis (FMEA) tool. In order to obtain data, observational and photographic records were made in the work analyzed in relation to the risks to which workers are exposed. Subsequently, the risk priority analysis was carried out using the FMEA tool. Among the high-Risk Priority Numbers (RPNs) there is the non-use of personal protective equipment, a serious situation due to its high risk. Thus, it can be concluded that the FMEA method contributed to the prioritization of preventive measures related to work safety for the analyzed civil construction work. |
publishDate |
2023 |
dc.date.none.fl_str_mv |
2023-05-02 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion Artigo avaliado pelos pares |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://periodicos.ufes.br/bjpe/article/view/40211 10.47456/bjpe.v9i2.40211 |
url |
https://periodicos.ufes.br/bjpe/article/view/40211 |
identifier_str_mv |
10.47456/bjpe.v9i2.40211 |
dc.language.iso.fl_str_mv |
por eng spa |
language |
por eng spa |
dc.relation.none.fl_str_mv |
https://periodicos.ufes.br/bjpe/article/view/40211/27120 https://periodicos.ufes.br/bjpe/article/view/40211/27223 https://periodicos.ufes.br/bjpe/article/view/40211/27008 https://periodicos.ufes.br/bjpe/article/view/40211/27009 https://periodicos.ufes.br/bjpe/article/view/40211/27010 https://periodicos.ufes.br/bjpe/article/view/40211/27011 https://periodicos.ufes.br/bjpe/article/view/40211/27012 https://periodicos.ufes.br/bjpe/article/view/40211/27154 |
dc.rights.driver.fl_str_mv |
Copyright (c) 2023 Brazilian Journal of Production Engineering https://creativecommons.org/licenses/by-nc-sa/4.0 info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Copyright (c) 2023 Brazilian Journal of Production Engineering https://creativecommons.org/licenses/by-nc-sa/4.0 |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf application/pdf image/jpeg image/jpeg image/jpeg audio/mpeg audio/mpeg |
dc.publisher.none.fl_str_mv |
Universidade Federal do Espírito Santo - UFES |
publisher.none.fl_str_mv |
Universidade Federal do Espírito Santo - UFES |
dc.source.none.fl_str_mv |
Brazilian Journal of Production Engineering; Vol. 9 No. 2 (2023): Regular Issue (April - June) *Publication Articles Continuous Flow*; 14-26 Brazilian Journal of Production Engineering; Vol. 9 Núm. 2 (2023): Edición regular (abril - junio) *Artículos de publicación Flujo continuo*; 14-26 Brazilian Journal of Production Engineering; v. 9 n. 2 (2023): Número Regular (Abril - Junho); 14-26 2447-5580 10.47456/bjpe.v9i2 reponame:Brazilian Journal of Production Engineering instname:Universidade Federal do Espírito Santo (UFES) instacron:UFES |
instname_str |
Universidade Federal do Espírito Santo (UFES) |
instacron_str |
UFES |
institution |
UFES |
reponame_str |
Brazilian Journal of Production Engineering |
collection |
Brazilian Journal of Production Engineering |
repository.name.fl_str_mv |
Brazilian Journal of Production Engineering - Universidade Federal do Espírito Santo (UFES) |
repository.mail.fl_str_mv |
rodrigo.r.freitas@ufes.br |
_version_ |
1797047317755330560 |