MODELAGEM DO PROCESSO PRODUTIVO DE ESTACAS PRÉ-MOLDADAS DE CONCRETO
Autor(a) principal: | |
---|---|
Data de Publicação: | 2024 |
Tipo de documento: | Trabalho de conclusão de curso |
Idioma: | por |
Título da fonte: | Repositório Institucional da UFMS |
Texto Completo: | https://repositorio.ufms.br/handle/123456789/9021 |
Resumo: | Modeling the precast pile manufacturing process plays a crucial role in the search for efficiency and quality in civil construction. This study aims to model the flowchart, providing visualization of this process. The research theoretically addressed topics such as Production Administration, Production Process, Flowchart and Process Modeling to support the investigation. Methodologically, it is classified as a descriptive research and case study, using semi-structured interviews with managers and professionals from the sector involved. As a case study, the pile manufacturing process at the private company was used. The developed model systematically represents the steps from receiving the order, from planning to the distribution of precast concrete piles. This study not only contributes to the practice of the company studied, but can also be applied as a reference for other production processes in construction, which can lead to more coherent choices regarding the use of resources and production strategies. |
id |
UFMS_ae2c443c1fda1feb72a807fae3380bd8 |
---|---|
oai_identifier_str |
oai:repositorio.ufms.br:123456789/9021 |
network_acronym_str |
UFMS |
network_name_str |
Repositório Institucional da UFMS |
repository_id_str |
2124 |
spelling |
2024-07-13T01:48:00Z2024-07-13T01:48:00Z2024https://repositorio.ufms.br/handle/123456789/9021Modeling the precast pile manufacturing process plays a crucial role in the search for efficiency and quality in civil construction. This study aims to model the flowchart, providing visualization of this process. The research theoretically addressed topics such as Production Administration, Production Process, Flowchart and Process Modeling to support the investigation. Methodologically, it is classified as a descriptive research and case study, using semi-structured interviews with managers and professionals from the sector involved. As a case study, the pile manufacturing process at the private company was used. The developed model systematically represents the steps from receiving the order, from planning to the distribution of precast concrete piles. This study not only contributes to the practice of the company studied, but can also be applied as a reference for other production processes in construction, which can lead to more coherent choices regarding the use of resources and production strategies.A modelagem do processo de fabricação de estacas pré-moldadas desempenha um papel crucial na busca por eficiência e qualidade na construção civil. Este estudo tem como objetivo modelar o fluxograma trazendo a visualização desse processo. A pesquisa abordou teoricamente temas como Administração da Produção, Processo Produtivo, Fluxograma e Modelagem de Processo para fundamentar a investigação. Metodologicamente, classifica-se como uma pesquisa descritiva e estudo de caso, utilizando entrevistas semiestruturadas com gestores e profissionais do setor envolvido. Como estudo de caso, utilizou-se o processo de fabricação de estacas em uma empresa privada. O modelo desenvolvido representa de forma sistemática as etapas desde o recebimento do pedido, do planejamento até a distribuição das estacas das estacas pré-moldadas de concreto. Este estudo não só contribui para a prática da empresa estudada, mas também pode ser aplicado como referência para outros processos produtivos na construção civil, o que pode levar a escolhas mais coerentes em relação a utilização dos recursos e estratégias de produção.Fundação Universidade Federal de Mato Grosso do SulUFMSCiências Exatas e da TerraModelagemEstacas pré-moldadasGestão da produçãoMODELAGEM DO PROCESSO PRODUTIVO DE ESTACAS PRÉ-MOLDADAS DE CONCRETOinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesisPAULO CESAR SCHOTTENANA JULIA DE LIMA SILVAinfo:eu-repo/semantics/openAccessporreponame:Repositório Institucional da UFMSinstname:Universidade Federal de Mato Grosso do Sul (UFMS)instacron:UFMSORIGINAL2837.pdf2837.pdfapplication/pdf610205https://repositorio.ufms.br/bitstream/123456789/9021/-1/2837.pdf04f5a6d6691847680c415d4f31b58db3MD5-1123456789/90212024-07-12 21:48:01.704oai:repositorio.ufms.br:123456789/9021Repositório InstitucionalPUBhttps://repositorio.ufms.br/oai/requestri.prograd@ufms.bropendoar:21242024-07-13T01:48:01Repositório Institucional da UFMS - Universidade Federal de Mato Grosso do Sul (UFMS)false |
dc.title.pt_BR.fl_str_mv |
MODELAGEM DO PROCESSO PRODUTIVO DE ESTACAS PRÉ-MOLDADAS DE CONCRETO |
title |
MODELAGEM DO PROCESSO PRODUTIVO DE ESTACAS PRÉ-MOLDADAS DE CONCRETO |
spellingShingle |
MODELAGEM DO PROCESSO PRODUTIVO DE ESTACAS PRÉ-MOLDADAS DE CONCRETO ANA JULIA DE LIMA SILVA Modelagem Estacas pré-moldadas Gestão da produção Ciências Exatas e da Terra |
title_short |
MODELAGEM DO PROCESSO PRODUTIVO DE ESTACAS PRÉ-MOLDADAS DE CONCRETO |
title_full |
MODELAGEM DO PROCESSO PRODUTIVO DE ESTACAS PRÉ-MOLDADAS DE CONCRETO |
title_fullStr |
MODELAGEM DO PROCESSO PRODUTIVO DE ESTACAS PRÉ-MOLDADAS DE CONCRETO |
title_full_unstemmed |
MODELAGEM DO PROCESSO PRODUTIVO DE ESTACAS PRÉ-MOLDADAS DE CONCRETO |
title_sort |
MODELAGEM DO PROCESSO PRODUTIVO DE ESTACAS PRÉ-MOLDADAS DE CONCRETO |
author |
ANA JULIA DE LIMA SILVA |
author_facet |
ANA JULIA DE LIMA SILVA |
author_role |
author |
dc.contributor.advisor1.fl_str_mv |
PAULO CESAR SCHOTTEN |
dc.contributor.author.fl_str_mv |
ANA JULIA DE LIMA SILVA |
contributor_str_mv |
PAULO CESAR SCHOTTEN |
dc.subject.por.fl_str_mv |
Modelagem Estacas pré-moldadas Gestão da produção |
topic |
Modelagem Estacas pré-moldadas Gestão da produção Ciências Exatas e da Terra |
dc.subject.classification.pt_BR.fl_str_mv |
Ciências Exatas e da Terra |
description |
Modeling the precast pile manufacturing process plays a crucial role in the search for efficiency and quality in civil construction. This study aims to model the flowchart, providing visualization of this process. The research theoretically addressed topics such as Production Administration, Production Process, Flowchart and Process Modeling to support the investigation. Methodologically, it is classified as a descriptive research and case study, using semi-structured interviews with managers and professionals from the sector involved. As a case study, the pile manufacturing process at the private company was used. The developed model systematically represents the steps from receiving the order, from planning to the distribution of precast concrete piles. This study not only contributes to the practice of the company studied, but can also be applied as a reference for other production processes in construction, which can lead to more coherent choices regarding the use of resources and production strategies. |
publishDate |
2024 |
dc.date.accessioned.fl_str_mv |
2024-07-13T01:48:00Z |
dc.date.available.fl_str_mv |
2024-07-13T01:48:00Z |
dc.date.issued.fl_str_mv |
2024 |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/bachelorThesis |
format |
bachelorThesis |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://repositorio.ufms.br/handle/123456789/9021 |
url |
https://repositorio.ufms.br/handle/123456789/9021 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.publisher.none.fl_str_mv |
Fundação Universidade Federal de Mato Grosso do Sul |
dc.publisher.initials.fl_str_mv |
UFMS |
dc.publisher.country.pt_BR.fl_str_mv |
|
publisher.none.fl_str_mv |
Fundação Universidade Federal de Mato Grosso do Sul |
dc.source.none.fl_str_mv |
reponame:Repositório Institucional da UFMS instname:Universidade Federal de Mato Grosso do Sul (UFMS) instacron:UFMS |
instname_str |
Universidade Federal de Mato Grosso do Sul (UFMS) |
instacron_str |
UFMS |
institution |
UFMS |
reponame_str |
Repositório Institucional da UFMS |
collection |
Repositório Institucional da UFMS |
bitstream.url.fl_str_mv |
https://repositorio.ufms.br/bitstream/123456789/9021/-1/2837.pdf |
bitstream.checksum.fl_str_mv |
04f5a6d6691847680c415d4f31b58db3 |
bitstream.checksumAlgorithm.fl_str_mv |
MD5 |
repository.name.fl_str_mv |
Repositório Institucional da UFMS - Universidade Federal de Mato Grosso do Sul (UFMS) |
repository.mail.fl_str_mv |
ri.prograd@ufms.br |
_version_ |
1815448008106442752 |