PLANEJAMENTO DA REDE VIÁRIA NO MANEJO DE FLORESTA NATIVA UTILIZANDO SIG
Autor(a) principal: | |
---|---|
Data de Publicação: | 2023 |
Outros Autores: | , , , |
Tipo de documento: | Artigo |
Idioma: | por |
Título da fonte: | Nativa (Sinop) |
Texto Completo: | https://periodicoscientificos.ufmt.br/ojs/index.php/nativa/article/view/15624 |
Resumo: | The objective of the work was to plan the network of roads, log storage yards and skid trails in the extraction of commercial trees in the native forest with the aid of geographic information systems (GIS). The layers of information considered were; hydrology, slope of the land and the distribution of commercial trees. The optimal road density (DOE) was calculated based on the cost of skidding and the cost of roads and storage yards. From the primary road, the secondary roads were allocated, then the courtyards and finally the primary and secondary skid trails will be allocated. According to DOE calculations, the spacing of 500 m between roads and the spacing between yards of 250 m had the lowest total cost. When compared to the conventional planning of 400 m between roads and 500 m between storage yards, the density of roads decreased by 5 m/ha, even with the increase in the number of yards from 18 to 26, the total area infrastructure was 1.6%, but the productivity of skidding logs increased by 8.47 m3/h due to the reduction in skidding distance by 103.48 m and the total cost was reduced by R$ 2.37/m3. |
id |
UFMT-2_efa04407dfaf78185edd233513fb7ebc |
---|---|
oai_identifier_str |
oai:periodicoscientificos.ufmt.br:article/15624 |
network_acronym_str |
UFMT-2 |
network_name_str |
Nativa (Sinop) |
repository_id_str |
|
spelling |
PLANEJAMENTO DA REDE VIÁRIA NO MANEJO DE FLORESTA NATIVA UTILIZANDO SIGmanejo florestalcusto mínimoplanejamento florestal com SIGThe objective of the work was to plan the network of roads, log storage yards and skid trails in the extraction of commercial trees in the native forest with the aid of geographic information systems (GIS). The layers of information considered were; hydrology, slope of the land and the distribution of commercial trees. The optimal road density (DOE) was calculated based on the cost of skidding and the cost of roads and storage yards. From the primary road, the secondary roads were allocated, then the courtyards and finally the primary and secondary skid trails will be allocated. According to DOE calculations, the spacing of 500 m between roads and the spacing between yards of 250 m had the lowest total cost. When compared to the conventional planning of 400 m between roads and 500 m between storage yards, the density of roads decreased by 5 m/ha, even with the increase in the number of yards from 18 to 26, the total area infrastructure was 1.6%, but the productivity of skidding logs increased by 8.47 m3/h due to the reduction in skidding distance by 103.48 m and the total cost was reduced by R$ 2.37/m3.O trabalho teve como objetivo planejar a rede de estradas, pátios de estocagem de toras e trilhas de arraste na extração das árvores comerciais na floresta nativa com auxílio dos sistemas de informação geográfica (SIG). As camadas de informações consideradas foram: hidrologia, declividade do terreno e a distribuição das árvores comerciais. Foi calculada a densidade ótima de estradas (DOE) baseada no custo de arraste e no custo de estradas e pátios. A partir da estrada primária foram alocadas as estradas secundárias, os pátios e por fim se alocaram as trilhas primárias e as trilhas secundárias. De acordo com os cálculos da DOE, o espaçamento de 500 m entre estradas e o espaçamento entre pátios de 250 m apresentou o menor custo total. Quando comparado com o planejamento convencional, de 400 m entre estradas e 500 m entre pátios, a densidade de estradas diminuiu 5 m/ha, embora o número de pátios tenha aumentado de 18 para 26 e a área total da infraestrutura tenha sido iguais de 1,6 %, porém a produtividade do arraste de toras aumentou em 8,47 m3/h devido à diminuição da distância de arraste em 103,48 m e o custo total da colheita foi reduzido em R$ 2,37/m3. Palavras-chave: manejo florestal; custo mínimo; planejamento florestal com SIG. Road network planning in native forest management using GIS ABSTRACT: The objective of the work was to plan the network of roads, log storage yards and skid trails in extracting commercial trees in the native forest with the aid of geographic information systems (GIS). The layers of information considered were hydrology, the slope of the land, and the distribution of commercial trees. The optimal road density (DOE) was calculated based on the cost of skidding and the cost of roads and storage yards. From the primary road, the secondary roads were allocated, then the courtyards, and finally, the primary and secondary skid trails were allocated. According to DOE calculations, the spacing of 500 m between roads and the spacing between yards of 250 m had the lowest total cost. When compared to conventional planning, of 400 m between roads and 500 m between yards, the density of roads decreased by 5 m/ha, although the number of yards increased from 18 to 26 and the total infrastructure area was equal to 1 .6%, however log dragging productivity increased by 8.47 m3/h due to the reduction in the skidding distance by 103.48 m and the total harvest cost was reduced by R$ 2.37/m3. Keywords: forest management; minimum cost; forest planning with GIS.Universidade Federal de Mato Grosso2023-12-31info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://periodicoscientificos.ufmt.br/ojs/index.php/nativa/article/view/1562410.31413/nat.v11i4.15624Nativa; v. 11 n. 4 (2023); 582-591Nativa; Vol. 11 Núm. 4 (2023); 582-591Nativa; Vol. 11 No. 4 (2023); 582-5912318-7670reponame:Nativa (Sinop)instname:Universidade Federal de Mato Grosso (UFMT)instacron:UFMTporhttps://periodicoscientificos.ufmt.br/ojs/index.php/nativa/article/view/15624/13380Copyright (c) 2023 Nativahttps://creativecommons.org/licenses/by-nc/4.0info:eu-repo/semantics/openAccessAcosta, Fidel CándanoDziubat, Adalfredo SousaXavier da Silva, Gean Marcos García, Marcos LeandroMartínez Cantón, José Luís 2024-02-07T02:31:35Zoai:periodicoscientificos.ufmt.br:article/15624Revistahttps://periodicoscientificos.ufmt.br/ojs/index.php/nativaPUBhttps://periodicoscientificos.ufmt.br/ojs/index.php/nativa/oai||rrmelo2@yahoo.com.br2318-76702318-7670opendoar:2024-02-07T02:31:35Nativa (Sinop) - Universidade Federal de Mato Grosso (UFMT)false |
dc.title.none.fl_str_mv |
PLANEJAMENTO DA REDE VIÁRIA NO MANEJO DE FLORESTA NATIVA UTILIZANDO SIG |
title |
PLANEJAMENTO DA REDE VIÁRIA NO MANEJO DE FLORESTA NATIVA UTILIZANDO SIG |
spellingShingle |
PLANEJAMENTO DA REDE VIÁRIA NO MANEJO DE FLORESTA NATIVA UTILIZANDO SIG Acosta, Fidel Cándano manejo florestal custo mínimo planejamento florestal com SIG |
title_short |
PLANEJAMENTO DA REDE VIÁRIA NO MANEJO DE FLORESTA NATIVA UTILIZANDO SIG |
title_full |
PLANEJAMENTO DA REDE VIÁRIA NO MANEJO DE FLORESTA NATIVA UTILIZANDO SIG |
title_fullStr |
PLANEJAMENTO DA REDE VIÁRIA NO MANEJO DE FLORESTA NATIVA UTILIZANDO SIG |
title_full_unstemmed |
PLANEJAMENTO DA REDE VIÁRIA NO MANEJO DE FLORESTA NATIVA UTILIZANDO SIG |
title_sort |
PLANEJAMENTO DA REDE VIÁRIA NO MANEJO DE FLORESTA NATIVA UTILIZANDO SIG |
author |
Acosta, Fidel Cándano |
author_facet |
Acosta, Fidel Cándano Dziubat, Adalfredo Sousa Xavier da Silva, Gean Marcos García, Marcos Leandro Martínez Cantón, José Luís |
author_role |
author |
author2 |
Dziubat, Adalfredo Sousa Xavier da Silva, Gean Marcos García, Marcos Leandro Martínez Cantón, José Luís |
author2_role |
author author author author |
dc.contributor.author.fl_str_mv |
Acosta, Fidel Cándano Dziubat, Adalfredo Sousa Xavier da Silva, Gean Marcos García, Marcos Leandro Martínez Cantón, José Luís |
dc.subject.por.fl_str_mv |
manejo florestal custo mínimo planejamento florestal com SIG |
topic |
manejo florestal custo mínimo planejamento florestal com SIG |
description |
The objective of the work was to plan the network of roads, log storage yards and skid trails in the extraction of commercial trees in the native forest with the aid of geographic information systems (GIS). The layers of information considered were; hydrology, slope of the land and the distribution of commercial trees. The optimal road density (DOE) was calculated based on the cost of skidding and the cost of roads and storage yards. From the primary road, the secondary roads were allocated, then the courtyards and finally the primary and secondary skid trails will be allocated. According to DOE calculations, the spacing of 500 m between roads and the spacing between yards of 250 m had the lowest total cost. When compared to the conventional planning of 400 m between roads and 500 m between storage yards, the density of roads decreased by 5 m/ha, even with the increase in the number of yards from 18 to 26, the total area infrastructure was 1.6%, but the productivity of skidding logs increased by 8.47 m3/h due to the reduction in skidding distance by 103.48 m and the total cost was reduced by R$ 2.37/m3. |
publishDate |
2023 |
dc.date.none.fl_str_mv |
2023-12-31 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://periodicoscientificos.ufmt.br/ojs/index.php/nativa/article/view/15624 10.31413/nat.v11i4.15624 |
url |
https://periodicoscientificos.ufmt.br/ojs/index.php/nativa/article/view/15624 |
identifier_str_mv |
10.31413/nat.v11i4.15624 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.relation.none.fl_str_mv |
https://periodicoscientificos.ufmt.br/ojs/index.php/nativa/article/view/15624/13380 |
dc.rights.driver.fl_str_mv |
Copyright (c) 2023 Nativa https://creativecommons.org/licenses/by-nc/4.0 info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Copyright (c) 2023 Nativa https://creativecommons.org/licenses/by-nc/4.0 |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
Universidade Federal de Mato Grosso |
publisher.none.fl_str_mv |
Universidade Federal de Mato Grosso |
dc.source.none.fl_str_mv |
Nativa; v. 11 n. 4 (2023); 582-591 Nativa; Vol. 11 Núm. 4 (2023); 582-591 Nativa; Vol. 11 No. 4 (2023); 582-591 2318-7670 reponame:Nativa (Sinop) instname:Universidade Federal de Mato Grosso (UFMT) instacron:UFMT |
instname_str |
Universidade Federal de Mato Grosso (UFMT) |
instacron_str |
UFMT |
institution |
UFMT |
reponame_str |
Nativa (Sinop) |
collection |
Nativa (Sinop) |
repository.name.fl_str_mv |
Nativa (Sinop) - Universidade Federal de Mato Grosso (UFMT) |
repository.mail.fl_str_mv |
||rrmelo2@yahoo.com.br |
_version_ |
1799711193520144384 |