Cost assessment of efficiency losses in hydroelectric plants.

Detalhes bibliográficos
Autor(a) principal: Manso, Juan Carlos Galvis
Data de Publicação: 2011
Outros Autores: Feltrin, Antonio Padilha, Yusta Loyo, Jose Maria
Tipo de documento: Artigo
Idioma: eng
Título da fonte: Repositório Institucional da UFOP
Texto Completo: http://www.repositorio.ufop.br/handle/123456789/4253
https://doi.org/10.1016/j.epsr.2011.05.006
Resumo: Some important real-time tasks of the independent system operator (ISO) are the monitoring and control of power system events (load deviations and contingencies). These events are usually managed by the ISO using operating reserve ancillary services. These services represent an additional capacity (MW) available in generators and some interruptible loads. Generators must change their operating points in order that this capacity can remain available. These changes might lead to efficiency losses in energy production. In systems with a high percentage of hydroelectric production, hydroelectric plants need to know the impact of ancillary services on their profits. This work therefore analyzes the cost of efficiency losses due to operating reserve availability in hydroelectric generators. A method to calculate this cost component is proposed using a unit commitment dispatch for a single hydroelectric plant. This dispatch is performed without considering the operating reserve availability and is compared with the traditional dispatch, which takes into account the availability of operating reserve. The proposal is used to calculate the cost of efficiency losses on a Brazilian hydroelectric generator. We found that the cost of efficiency losses can be considerable when compared to the incomes of a hydroelectric plant in the short-term market.
id UFOP_bab52a5cfd32d7a0db018519ce7ee440
oai_identifier_str oai:repositorio.ufop.br:123456789/4253
network_acronym_str UFOP
network_name_str Repositório Institucional da UFOP
repository_id_str 3233
spelling Cost assessment of efficiency losses in hydroelectric plants.Ancillary servicesEfficiency lossesHydroelectric generatorsOperating reserveSome important real-time tasks of the independent system operator (ISO) are the monitoring and control of power system events (load deviations and contingencies). These events are usually managed by the ISO using operating reserve ancillary services. These services represent an additional capacity (MW) available in generators and some interruptible loads. Generators must change their operating points in order that this capacity can remain available. These changes might lead to efficiency losses in energy production. In systems with a high percentage of hydroelectric production, hydroelectric plants need to know the impact of ancillary services on their profits. This work therefore analyzes the cost of efficiency losses due to operating reserve availability in hydroelectric generators. A method to calculate this cost component is proposed using a unit commitment dispatch for a single hydroelectric plant. This dispatch is performed without considering the operating reserve availability and is compared with the traditional dispatch, which takes into account the availability of operating reserve. The proposal is used to calculate the cost of efficiency losses on a Brazilian hydroelectric generator. We found that the cost of efficiency losses can be considerable when compared to the incomes of a hydroelectric plant in the short-term market.2015-01-16T15:58:38Z2015-01-16T15:58:38Z2011info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleapplication/pdfMANSO, J. C. G.; FELTRIN, A. P.; YUSTA LOYO, J. M. Cost assessment of efficiency losses in hydroelectric plants. Electric Power Systems Research, v. 81, p. 1866-1873, 2011. Disponível em: <http://www.sciencedirect.com/science/article/pii/S0378779611001180>. Acesso em: 09 jan. 2015.0378-7796http://www.repositorio.ufop.br/handle/123456789/4253https://doi.org/10.1016/j.epsr.2011.05.006O periódico Electric Power Systems Research concede permissão para depósito do artigo no Repositório Institucional da UFOP. Número da licença: 3544811366967.info:eu-repo/semantics/openAccessManso, Juan Carlos GalvisFeltrin, Antonio PadilhaYusta Loyo, Jose Mariaengreponame:Repositório Institucional da UFOPinstname:Universidade Federal de Ouro Preto (UFOP)instacron:UFOP2024-11-10T23:09:54Zoai:repositorio.ufop.br:123456789/4253Repositório InstitucionalPUBhttp://www.repositorio.ufop.br/oai/requestrepositorio@ufop.edu.bropendoar:32332024-11-10T23:09:54Repositório Institucional da UFOP - Universidade Federal de Ouro Preto (UFOP)false
dc.title.none.fl_str_mv Cost assessment of efficiency losses in hydroelectric plants.
title Cost assessment of efficiency losses in hydroelectric plants.
spellingShingle Cost assessment of efficiency losses in hydroelectric plants.
Manso, Juan Carlos Galvis
Ancillary services
Efficiency losses
Hydroelectric generators
Operating reserve
title_short Cost assessment of efficiency losses in hydroelectric plants.
title_full Cost assessment of efficiency losses in hydroelectric plants.
title_fullStr Cost assessment of efficiency losses in hydroelectric plants.
title_full_unstemmed Cost assessment of efficiency losses in hydroelectric plants.
title_sort Cost assessment of efficiency losses in hydroelectric plants.
author Manso, Juan Carlos Galvis
author_facet Manso, Juan Carlos Galvis
Feltrin, Antonio Padilha
Yusta Loyo, Jose Maria
author_role author
author2 Feltrin, Antonio Padilha
Yusta Loyo, Jose Maria
author2_role author
author
dc.contributor.author.fl_str_mv Manso, Juan Carlos Galvis
Feltrin, Antonio Padilha
Yusta Loyo, Jose Maria
dc.subject.por.fl_str_mv Ancillary services
Efficiency losses
Hydroelectric generators
Operating reserve
topic Ancillary services
Efficiency losses
Hydroelectric generators
Operating reserve
description Some important real-time tasks of the independent system operator (ISO) are the monitoring and control of power system events (load deviations and contingencies). These events are usually managed by the ISO using operating reserve ancillary services. These services represent an additional capacity (MW) available in generators and some interruptible loads. Generators must change their operating points in order that this capacity can remain available. These changes might lead to efficiency losses in energy production. In systems with a high percentage of hydroelectric production, hydroelectric plants need to know the impact of ancillary services on their profits. This work therefore analyzes the cost of efficiency losses due to operating reserve availability in hydroelectric generators. A method to calculate this cost component is proposed using a unit commitment dispatch for a single hydroelectric plant. This dispatch is performed without considering the operating reserve availability and is compared with the traditional dispatch, which takes into account the availability of operating reserve. The proposal is used to calculate the cost of efficiency losses on a Brazilian hydroelectric generator. We found that the cost of efficiency losses can be considerable when compared to the incomes of a hydroelectric plant in the short-term market.
publishDate 2011
dc.date.none.fl_str_mv 2011
2015-01-16T15:58:38Z
2015-01-16T15:58:38Z
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv MANSO, J. C. G.; FELTRIN, A. P.; YUSTA LOYO, J. M. Cost assessment of efficiency losses in hydroelectric plants. Electric Power Systems Research, v. 81, p. 1866-1873, 2011. Disponível em: <http://www.sciencedirect.com/science/article/pii/S0378779611001180>. Acesso em: 09 jan. 2015.
0378-7796
http://www.repositorio.ufop.br/handle/123456789/4253
https://doi.org/10.1016/j.epsr.2011.05.006
identifier_str_mv MANSO, J. C. G.; FELTRIN, A. P.; YUSTA LOYO, J. M. Cost assessment of efficiency losses in hydroelectric plants. Electric Power Systems Research, v. 81, p. 1866-1873, 2011. Disponível em: <http://www.sciencedirect.com/science/article/pii/S0378779611001180>. Acesso em: 09 jan. 2015.
0378-7796
url http://www.repositorio.ufop.br/handle/123456789/4253
https://doi.org/10.1016/j.epsr.2011.05.006
dc.language.iso.fl_str_mv eng
language eng
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.source.none.fl_str_mv reponame:Repositório Institucional da UFOP
instname:Universidade Federal de Ouro Preto (UFOP)
instacron:UFOP
instname_str Universidade Federal de Ouro Preto (UFOP)
instacron_str UFOP
institution UFOP
reponame_str Repositório Institucional da UFOP
collection Repositório Institucional da UFOP
repository.name.fl_str_mv Repositório Institucional da UFOP - Universidade Federal de Ouro Preto (UFOP)
repository.mail.fl_str_mv repositorio@ufop.edu.br
_version_ 1823329435310358528