Utilização do MS Project aplicado no cronograma de execução de obra

Detalhes bibliográficos
Autor(a) principal: Mendonça, Bruno Lima
Data de Publicação: 2022
Tipo de documento: Trabalho de conclusão de curso
Idioma: por
Título da fonte: Repositório Institucional da UFS
Texto Completo: http://ri.ufs.br/jspui/handle/riufs/16722
Resumo: The construction industry is a competitive sector and, for this reason, is increasingly demanding. In Brazil, many are still carried out based on the experience of masters, without the application of management work techniques. Therefore, the need to plan and control the schedule, in order to avoid delays, becomes essential. The characterization of the planning and control of a set of works of strategies that, when used, took advantage of the production of the productive system. The lack or planning of planned planning is the cause of many planned as structured and its implementation can bring considerable gains to the enterprise. The present work had as main objective the planning of a work in the elaboration of a work that was based on the means of collecting EAP data, which were analyzed in a city through an MS Project software. Among the objectives, check the sample deadlines and whether the goals were achieved. Based on the literature review, the case study showed that an application of techniques can improve performance on several levels. The study reinforces the idea that planning should always be controlled to provide more accurate management information and improve process efficiency and increase budget quality.
id UFS-2_e36362f9b4bbcfc9bb8b6a717df84da3
oai_identifier_str oai:ufs.br:riufs/16722
network_acronym_str UFS-2
network_name_str Repositório Institucional da UFS
repository_id_str
spelling Mendonça, Bruno LimaNadalini, Ana Carolina Valerio2022-11-01T12:46:33Z2022-11-01T12:46:33Z2022-08-03Mendonça, Bruno Lima. Utilização do MS Project aplicado no cronograma de execução de obra. São Cristóvão, 2022. Monografia (graduação em Engenharia Civil) – Departamento de Engenharia Civil, Centro de Ciências Exatas e Tecnologia, Universidade Federal de Sergipe, São Cristóvão, SE, 2022http://ri.ufs.br/jspui/handle/riufs/16722The construction industry is a competitive sector and, for this reason, is increasingly demanding. In Brazil, many are still carried out based on the experience of masters, without the application of management work techniques. Therefore, the need to plan and control the schedule, in order to avoid delays, becomes essential. The characterization of the planning and control of a set of works of strategies that, when used, took advantage of the production of the productive system. The lack or planning of planned planning is the cause of many planned as structured and its implementation can bring considerable gains to the enterprise. The present work had as main objective the planning of a work in the elaboration of a work that was based on the means of collecting EAP data, which were analyzed in a city through an MS Project software. Among the objectives, check the sample deadlines and whether the goals were achieved. Based on the literature review, the case study showed that an application of techniques can improve performance on several levels. The study reinforces the idea that planning should always be controlled to provide more accurate management information and improve process efficiency and increase budget quality.A indústria da construção civil é um setor competitivo e, por este motivo, apresenta consumidores cada vez mais exigentes. No Brasil, muitas obras ainda são realizadas com base na experiência de mestres de obra, sem a aplicação das técnicas adequadas de gerenciamento. Portanto, a necessidade de planejamento e controle do cronograma, com objetivo de evitar atrasos, torna-se essencial. O planejamento e controle de obras se caracterizam por um conjunto de estratégias que, quando utilizadas adequadamente, influenciam positivamente a eficiência do sistema produtivo. A falta ou ineficiência do planejamento prévio é a causa de muitos prejuízos tanto financeiros como estruturais e sua implantação pode trazer ganhos consideráveis para o empreendimento. O presente trabalho teve como objetivo principal elaborar o planejamento de uma obra na cidade de Itabaiana-SE por meio de levantamento de dados de uma EAP, os quais foram analisados no software MS Project. Dentre os objetivos, verificar os prazos da amostra estudada, e se as metas foram atingidas. Com base na revisão bibliográfica, o estudo de caso mostrou que a aplicação de técnicas pode melhorar o planejamento em vários níveis. O estudo reforça a ideia de que o planejamento deve ser sempre controlado para fornecer informações gerenciais mais precisas e melhorar a eficiência nos processos e aumentar a qualidade do orçamento.São Cristóvão, SEporEngenharia CivilEnsino de engenharia civilPlanejamentoMS ProjectCronogramaExecução de obrasPlanningMS ProjectScheduleConstruction executionENGENHARIAS::ENGENHARIA CIVIL::CONSTRUCAO CIVILUtilização do MS Project aplicado no cronograma de execução de obrainfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesisUniversidade Federal de SergipeDEC - Departamento de Engenharia Civil – São Cristóvão - Presencialreponame:Repositório Institucional da UFSinstname:Universidade Federal de Sergipe (UFS)instacron:UFSinfo:eu-repo/semantics/openAccessTEXTBruno_Lima_Mendonca.pdf.txtBruno_Lima_Mendonca.pdf.txtExtracted texttext/plain69605https://ri.ufs.br/jspui/bitstream/riufs/16722/3/Bruno_Lima_Mendonca.pdf.txt36fad875e7727edfb784be63949cf7f3MD53THUMBNAILBruno_Lima_Mendonca.pdf.jpgBruno_Lima_Mendonca.pdf.jpgGenerated Thumbnailimage/jpeg1235https://ri.ufs.br/jspui/bitstream/riufs/16722/4/Bruno_Lima_Mendonca.pdf.jpg150b16a22bf56029beb8281648564da9MD54ORIGINALBruno_Lima_Mendonca.pdfBruno_Lima_Mendonca.pdfapplication/pdf1726545https://ri.ufs.br/jspui/bitstream/riufs/16722/2/Bruno_Lima_Mendonca.pdfa85b94f71a5dea7cdd97ec06cda3d6caMD52LICENSElicense.txtlicense.txttext/plain; charset=utf-81475https://ri.ufs.br/jspui/bitstream/riufs/16722/1/license.txt098cbbf65c2c15e1fb2e49c5d306a44cMD51riufs/167222022-11-01 09:46:45.565oai:ufs.br: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Repositório InstitucionalPUBhttps://ri.ufs.br/oai/requestrepositorio@academico.ufs.bropendoar:2022-11-01T12:46:45Repositório Institucional da UFS - Universidade Federal de Sergipe (UFS)false
dc.title.pt_BR.fl_str_mv Utilização do MS Project aplicado no cronograma de execução de obra
title Utilização do MS Project aplicado no cronograma de execução de obra
spellingShingle Utilização do MS Project aplicado no cronograma de execução de obra
Mendonça, Bruno Lima
Engenharia Civil
Ensino de engenharia civil
Planejamento
MS Project
Cronograma
Execução de obras
Planning
MS Project
Schedule
Construction execution
ENGENHARIAS::ENGENHARIA CIVIL::CONSTRUCAO CIVIL
title_short Utilização do MS Project aplicado no cronograma de execução de obra
title_full Utilização do MS Project aplicado no cronograma de execução de obra
title_fullStr Utilização do MS Project aplicado no cronograma de execução de obra
title_full_unstemmed Utilização do MS Project aplicado no cronograma de execução de obra
title_sort Utilização do MS Project aplicado no cronograma de execução de obra
author Mendonça, Bruno Lima
author_facet Mendonça, Bruno Lima
author_role author
dc.contributor.author.fl_str_mv Mendonça, Bruno Lima
dc.contributor.advisor1.fl_str_mv Nadalini, Ana Carolina Valerio
contributor_str_mv Nadalini, Ana Carolina Valerio
dc.subject.por.fl_str_mv Engenharia Civil
Ensino de engenharia civil
Planejamento
MS Project
Cronograma
Execução de obras
topic Engenharia Civil
Ensino de engenharia civil
Planejamento
MS Project
Cronograma
Execução de obras
Planning
MS Project
Schedule
Construction execution
ENGENHARIAS::ENGENHARIA CIVIL::CONSTRUCAO CIVIL
dc.subject.eng.fl_str_mv Planning
MS Project
Schedule
Construction execution
dc.subject.cnpq.fl_str_mv ENGENHARIAS::ENGENHARIA CIVIL::CONSTRUCAO CIVIL
description The construction industry is a competitive sector and, for this reason, is increasingly demanding. In Brazil, many are still carried out based on the experience of masters, without the application of management work techniques. Therefore, the need to plan and control the schedule, in order to avoid delays, becomes essential. The characterization of the planning and control of a set of works of strategies that, when used, took advantage of the production of the productive system. The lack or planning of planned planning is the cause of many planned as structured and its implementation can bring considerable gains to the enterprise. The present work had as main objective the planning of a work in the elaboration of a work that was based on the means of collecting EAP data, which were analyzed in a city through an MS Project software. Among the objectives, check the sample deadlines and whether the goals were achieved. Based on the literature review, the case study showed that an application of techniques can improve performance on several levels. The study reinforces the idea that planning should always be controlled to provide more accurate management information and improve process efficiency and increase budget quality.
publishDate 2022
dc.date.accessioned.fl_str_mv 2022-11-01T12:46:33Z
dc.date.available.fl_str_mv 2022-11-01T12:46:33Z
dc.date.issued.fl_str_mv 2022-08-03
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/bachelorThesis
format bachelorThesis
status_str publishedVersion
dc.identifier.citation.fl_str_mv Mendonça, Bruno Lima. Utilização do MS Project aplicado no cronograma de execução de obra. São Cristóvão, 2022. Monografia (graduação em Engenharia Civil) – Departamento de Engenharia Civil, Centro de Ciências Exatas e Tecnologia, Universidade Federal de Sergipe, São Cristóvão, SE, 2022
dc.identifier.uri.fl_str_mv http://ri.ufs.br/jspui/handle/riufs/16722
identifier_str_mv Mendonça, Bruno Lima. Utilização do MS Project aplicado no cronograma de execução de obra. São Cristóvão, 2022. Monografia (graduação em Engenharia Civil) – Departamento de Engenharia Civil, Centro de Ciências Exatas e Tecnologia, Universidade Federal de Sergipe, São Cristóvão, SE, 2022
url http://ri.ufs.br/jspui/handle/riufs/16722
dc.language.iso.fl_str_mv por
language por
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.publisher.initials.fl_str_mv Universidade Federal de Sergipe
dc.publisher.department.fl_str_mv DEC - Departamento de Engenharia Civil – São Cristóvão - Presencial
dc.source.none.fl_str_mv reponame:Repositório Institucional da UFS
instname:Universidade Federal de Sergipe (UFS)
instacron:UFS
instname_str Universidade Federal de Sergipe (UFS)
instacron_str UFS
institution UFS
reponame_str Repositório Institucional da UFS
collection Repositório Institucional da UFS
bitstream.url.fl_str_mv https://ri.ufs.br/jspui/bitstream/riufs/16722/3/Bruno_Lima_Mendonca.pdf.txt
https://ri.ufs.br/jspui/bitstream/riufs/16722/4/Bruno_Lima_Mendonca.pdf.jpg
https://ri.ufs.br/jspui/bitstream/riufs/16722/2/Bruno_Lima_Mendonca.pdf
https://ri.ufs.br/jspui/bitstream/riufs/16722/1/license.txt
bitstream.checksum.fl_str_mv 36fad875e7727edfb784be63949cf7f3
150b16a22bf56029beb8281648564da9
a85b94f71a5dea7cdd97ec06cda3d6ca
098cbbf65c2c15e1fb2e49c5d306a44c
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
MD5
repository.name.fl_str_mv Repositório Institucional da UFS - Universidade Federal de Sergipe (UFS)
repository.mail.fl_str_mv repositorio@academico.ufs.br
_version_ 1802110721256849408