CONSTRUCTION WASTE MINIMIZATION IN PUBLIC BUILDINGS THROUGH BIM PROCESS
Autor(a) principal: | |
---|---|
Data de Publicação: | 2021 |
Outros Autores: | , |
Tipo de documento: | Artigo |
Idioma: | por |
Título da fonte: | Repositório Institucional da UFSC |
Texto Completo: | https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698 https://repositorio.ufsc.br/handle/123456789/246614 |
Resumo: | Technological innovations have been incorporated into the civil construction sector. An example is the BIM’s adoption, which has been growing as an alternative for optimizing the design and execution processes. We sought to investigate what contribution BIM process brings to the construction waste minimization in public buildings. For this purpose, the building of the Reference Center for Social Assistance (CRAS), in Biguaçu/SC was adopted to study, whose design process was performed through BIM modeling. Some criteria for construction waste minimization through BIM were analyzed: (1) conflict, interference and collision detection, (2) construction sequence and construction planning, (3) reducing rework, (4) synchronizing design and site layout, (5) detection of errors and omissions and (6) precise quantity take-off. It was developed a qualitative research, with photographic records and work diaries, and in a quantitative research, with measurements of the area of sealing masonry on site and on the BIM model. The results show it is necessary to improve the process of detecting interferences, errors and omissions in the project phase, as well the planning and execution of the construction site. A proposal was developed to improve the processes of this public institution to construction waste minimization using BIM. |
id |
UFSC_481ce772489e6fd5a04fe4251d2cb7ee |
---|---|
oai_identifier_str |
oai:repositorio.ufsc.br:123456789/246614 |
network_acronym_str |
UFSC |
network_name_str |
Repositório Institucional da UFSC |
repository_id_str |
2373 |
spelling |
CONSTRUCTION WASTE MINIMIZATION IN PUBLIC BUILDINGS THROUGH BIM PROCESSMINIMIZAÇÃO DE RESÍDUOS DA CONSTRUÇÃO EM OBRAS PÚBLICAS POR MEIO DO PROCESSO BIMAssistência SocialExecução de ObrasFiscalização de Obras.Technological innovations have been incorporated into the civil construction sector. An example is the BIM’s adoption, which has been growing as an alternative for optimizing the design and execution processes. We sought to investigate what contribution BIM process brings to the construction waste minimization in public buildings. For this purpose, the building of the Reference Center for Social Assistance (CRAS), in Biguaçu/SC was adopted to study, whose design process was performed through BIM modeling. Some criteria for construction waste minimization through BIM were analyzed: (1) conflict, interference and collision detection, (2) construction sequence and construction planning, (3) reducing rework, (4) synchronizing design and site layout, (5) detection of errors and omissions and (6) precise quantity take-off. It was developed a qualitative research, with photographic records and work diaries, and in a quantitative research, with measurements of the area of sealing masonry on site and on the BIM model. The results show it is necessary to improve the process of detecting interferences, errors and omissions in the project phase, as well the planning and execution of the construction site. A proposal was developed to improve the processes of this public institution to construction waste minimization using BIM.Inovações tecnológicas têm sido incorporadas ao setor da construção civil. A adoção do BIM, por exemplo, mostra-se como alternativa para otimização dos processos de projeto e execução de obras. Neste trabalho, investigou-se a contribuição do processo BIM para a redução da ocorrência de resíduos da construção civil em obras públicas. Para isso, adotou-se para estudo o projeto padrão em BIM do Centro de Referência para Assistência Social, com execução em Biguaçu/SC. Foram analisados critérios para minimização de resíduos da construção por meio de BIM: (1) detecção de conflitos, interferências e colisões, (2) sequência construtiva e planejamento da construção, (3) redução do retrabalho, (4) sincronização do projeto e do layout do canteiro, (5) detecção de erros e omissões e (6) previsão das quantidades de material. Os critérios foram analisados de forma qualitativa, com registros fotográficos e diário de obra, e de forma quantitativa, com medições da área de alvenaria de vedação in loco no modelo BIM. Os resultados mostram que é necessário melhorar a detecção de interferências, erros e omissões na fase de projeto, bem como o planejamento do canteiro e da execução. Foi elaborada uma proposta para aprimoramento dos processos da instituição pública para a minimização de resíduos utilizando BIM.UFSC - Federal University of Santa Catarina2021-08-012023-05-29T21:29:01Z2023-05-29T21:29:01Zinfo:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfimage/pngimage/pngimage/pngimage/pngimage/pngimage/pngimage/jpegimage/jpegimage/jpegimage/svg+xmlhttps://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/469810.29183/2447-3073.MIX2021.v7.n3.141-152https://repositorio.ufsc.br/handle/123456789/246614Mix Sustentável; Vol. 7 No. 3 (2021): Mix Sustentável (edição regular); 141-152MIX Sustentável; v. 7 n. 3 (2021): Mix Sustentável (edição regular); 141-1522447-30732447-0899reponame:Repositório Institucional da UFSCinstname:Universidade Federal de Santa Catarina (UFSC)instacron:UFSCporhttps://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/3681https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4619https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4621https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4622https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4623https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4624https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4625https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4626https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4627https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4628https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4629Copyright (c) 2021 Veronica Martins Gnecco, Leticia Mattana, Michele Fossatiinfo:eu-repo/semantics/openAccessGnecco, Veronica MartinsMattana, LeticiaFossati, Michele2023-05-29T21:29:01Zoai:repositorio.ufsc.br:123456789/246614Repositório InstitucionalPUBhttp://150.162.242.35/oai/requestopendoar:23732023-05-29T21:29:01Repositório Institucional da UFSC - Universidade Federal de Santa Catarina (UFSC)false |
dc.title.none.fl_str_mv |
CONSTRUCTION WASTE MINIMIZATION IN PUBLIC BUILDINGS THROUGH BIM PROCESS MINIMIZAÇÃO DE RESÍDUOS DA CONSTRUÇÃO EM OBRAS PÚBLICAS POR MEIO DO PROCESSO BIM |
title |
CONSTRUCTION WASTE MINIMIZATION IN PUBLIC BUILDINGS THROUGH BIM PROCESS |
spellingShingle |
CONSTRUCTION WASTE MINIMIZATION IN PUBLIC BUILDINGS THROUGH BIM PROCESS Gnecco, Veronica Martins Assistência Social Execução de Obras Fiscalização de Obras. |
title_short |
CONSTRUCTION WASTE MINIMIZATION IN PUBLIC BUILDINGS THROUGH BIM PROCESS |
title_full |
CONSTRUCTION WASTE MINIMIZATION IN PUBLIC BUILDINGS THROUGH BIM PROCESS |
title_fullStr |
CONSTRUCTION WASTE MINIMIZATION IN PUBLIC BUILDINGS THROUGH BIM PROCESS |
title_full_unstemmed |
CONSTRUCTION WASTE MINIMIZATION IN PUBLIC BUILDINGS THROUGH BIM PROCESS |
title_sort |
CONSTRUCTION WASTE MINIMIZATION IN PUBLIC BUILDINGS THROUGH BIM PROCESS |
author |
Gnecco, Veronica Martins |
author_facet |
Gnecco, Veronica Martins Mattana, Leticia Fossati, Michele |
author_role |
author |
author2 |
Mattana, Leticia Fossati, Michele |
author2_role |
author author |
dc.contributor.author.fl_str_mv |
Gnecco, Veronica Martins Mattana, Leticia Fossati, Michele |
dc.subject.por.fl_str_mv |
Assistência Social Execução de Obras Fiscalização de Obras. |
topic |
Assistência Social Execução de Obras Fiscalização de Obras. |
description |
Technological innovations have been incorporated into the civil construction sector. An example is the BIM’s adoption, which has been growing as an alternative for optimizing the design and execution processes. We sought to investigate what contribution BIM process brings to the construction waste minimization in public buildings. For this purpose, the building of the Reference Center for Social Assistance (CRAS), in Biguaçu/SC was adopted to study, whose design process was performed through BIM modeling. Some criteria for construction waste minimization through BIM were analyzed: (1) conflict, interference and collision detection, (2) construction sequence and construction planning, (3) reducing rework, (4) synchronizing design and site layout, (5) detection of errors and omissions and (6) precise quantity take-off. It was developed a qualitative research, with photographic records and work diaries, and in a quantitative research, with measurements of the area of sealing masonry on site and on the BIM model. The results show it is necessary to improve the process of detecting interferences, errors and omissions in the project phase, as well the planning and execution of the construction site. A proposal was developed to improve the processes of this public institution to construction waste minimization using BIM. |
publishDate |
2021 |
dc.date.none.fl_str_mv |
2021-08-01 2023-05-29T21:29:01Z 2023-05-29T21:29:01Z |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698 10.29183/2447-3073.MIX2021.v7.n3.141-152 https://repositorio.ufsc.br/handle/123456789/246614 |
url |
https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698 https://repositorio.ufsc.br/handle/123456789/246614 |
identifier_str_mv |
10.29183/2447-3073.MIX2021.v7.n3.141-152 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.relation.none.fl_str_mv |
https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/3681 https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4619 https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4621 https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4622 https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4623 https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4624 https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4625 https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4626 https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4627 https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4628 https://ojs.sites.ufsc.br/index.php/mixsustentavel/article/view/4698/4629 |
dc.rights.driver.fl_str_mv |
Copyright (c) 2021 Veronica Martins Gnecco, Leticia Mattana, Michele Fossati info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Copyright (c) 2021 Veronica Martins Gnecco, Leticia Mattana, Michele Fossati |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf image/png image/png image/png image/png image/png image/png image/jpeg image/jpeg image/jpeg image/svg+xml |
dc.publisher.none.fl_str_mv |
UFSC - Federal University of Santa Catarina |
publisher.none.fl_str_mv |
UFSC - Federal University of Santa Catarina |
dc.source.none.fl_str_mv |
Mix Sustentável; Vol. 7 No. 3 (2021): Mix Sustentável (edição regular); 141-152 MIX Sustentável; v. 7 n. 3 (2021): Mix Sustentável (edição regular); 141-152 2447-3073 2447-0899 reponame:Repositório Institucional da UFSC instname:Universidade Federal de Santa Catarina (UFSC) instacron:UFSC |
instname_str |
Universidade Federal de Santa Catarina (UFSC) |
instacron_str |
UFSC |
institution |
UFSC |
reponame_str |
Repositório Institucional da UFSC |
collection |
Repositório Institucional da UFSC |
repository.name.fl_str_mv |
Repositório Institucional da UFSC - Universidade Federal de Santa Catarina (UFSC) |
repository.mail.fl_str_mv |
|
_version_ |
1808652069298503680 |