Modelo de aplicação da metodologia AWP para planejamento e controle de obras e sua interação com as funcionalidades do BIM e Sienge: estudo de caso de um edifício de múltiplos pavimentos

Detalhes bibliográficos
Autor(a) principal: Delfino, Joyce Moreira
Data de Publicação: 2022
Tipo de documento: Trabalho de conclusão de curso
Idioma: por
Título da fonte: Repositório Institucional da UFSC
Texto Completo: https://repositorio.ufsc.br/handle/123456789/233246
Resumo: TCC (graduação) - Universidade Federal de Santa Catarina. Campus Joinville. Engenharia Civil de Infraestrutura.
id UFSC_5b085e5777f9fd78bfce1965feb37133
oai_identifier_str oai:repositorio.ufsc.br:123456789/233246
network_acronym_str UFSC
network_name_str Repositório Institucional da UFSC
repository_id_str 2373
spelling Modelo de aplicação da metodologia AWP para planejamento e controle de obras e sua interação com as funcionalidades do BIM e Sienge: estudo de caso de um edifício de múltiplos pavimentosPlanejamentoAWPSuprimentosSiengeEdifícioPlanningAWPSuppliesSiengeBuildingTCC (graduação) - Universidade Federal de Santa Catarina. Campus Joinville. Engenharia Civil de Infraestrutura.As técnicas de planejamento para definição de custos e cronogramas reúnem dados que fornecem apoio durante o processo executivo e são um referencial para qualificar os resultados obtidos de um projeto. Estar de acordo com o prazo estimado e atender as expectativas de custos são os principais fatores que indicam a eficiência dos trabalhos, e no caso das empresas que atuam na construção civil, de um conjunto de atividades de vários setores, como planejamento, engenharia, suprimentos e mão de obra. Embora cada setor contribua com atividades distintas, a importância de manter o vínculo entre as áreas se faz necessária pela dependência dos dados, tarefas e recursos, mas ainda é visto como um desafio promover a integração, principalmente quando é empregada uma cultura em que os processos não são balizados pelo planejamento e tem andamento somente a partir da demanda de obra. O planejamento como ferramenta para definição de escopo dos próximos passos e conferências é um meio de garantir o fluxo otimizado da obra, identificar oportunidades e ameaças. Ao longo dos anos, os métodos e ferramentas foram desenvolvidos para melhorar o desempenho das atividades desde o projeto até sua execução, em tendência ao aumento de competividade de mercado gerado pela disponibilidade de novas tecnologias. A metodologia Advanced Work Planning surgiu com este propósito e busca integrar a rotina operacional dos trabalhos entre os envolvidos, subdividir em pacotes de trabalho e organizá-las para programar respeitando os processos construtivos. Sistemas de gestão integrado e projetos modelados em BIM são ferramentas que oferecem suporte ao método, mas identificar quais são as funcionalidades que podem auxiliar durante o processo ainda é pouco explorado na prática. Este trabalho tem como objetivo analisar um modelo de aplicação da metodologia AWP com foco em suprimentos, com o apoio das ferramentas em BIM e do sistema Sienge. A metodologia envolve a aplicação dos métodos AWP e técnicas de planejamento tradicionais sobre um estudo de caso de um edifício vertical. A análise de dados visa comparar as metodologias e indicar as vantagens e desvantagens. Os resultados obtidos reiteram a importância da interação entre os setores que é proposta pelo método AWP é visto que o método também permite ter um controle maior sobre os processos e evitar atrasos, mas requer um esforço maior de controle e organização dos processos. Sobre as ferramentas utilizadas, o Sienge oferece suporte em maior parcela na área de suprimentos e tem funcionalidades que podem ser utilizadas na aplicação da metodologia, assim como o modelo e projetos em BIM, como por exemplo na extração e organização dos quantitativos, no entanto requer uma conferência dos dados sugeridos.Planning techniques for defining costs and schedules gather data that provide support during the executive process and are a reference to qualify the results obtained from a project. Complying with the estimated deadline and meeting cost expectations are the main factors that indicate the efficiency of the work, and in the case of companies that work in civil construction, a set of activities from various sectors, such as planning, engineering, supplies and manpower. Although each sector contributes with different activities, the importance of maintaining the link between the areas is necessary due to the dependence of data, tasks and resources, but it is still seen as a challenge to promote integration, especially when a culture is used in which the processes they are not guided by planning and proceed only from the work demand. Planning as a tool for defining the scope of the next steps and conferences is a means of guaranteeing the optimized flow of the work, identifying opportunities and threats. Over the years, methods and tools have been developed to improve the performance of activities from design to execution, with a tendency to increase market competitiveness generated by the availability of new technologies. The Advanced Work Planning methodology emerged with this purpose and seeks to integrate the operational routine of the work between those involved, subdivide it into work packages and organize them to program respecting the construction processes. Integrated management systems and projects modeled in BIM are tools that support the method, but identifying which functionalities can help during the process are still few explored in practice. This work aims to analyze an application model of the AWP methodology with a focus on supplies, with the support of BIM tools and the Sienge system. The methodology involves the application of AWP methods and traditional planning techniques on a case study of a vertical building. Data analysis aims to compare the methodologies and indicate the advantages and disadvantages. The results obtained reiterate the importance of the interaction between the sectors that is proposed by the AWP method, since the method also allows greater control over the sectors and avoid delays, but requires a greater effort to control and organize the processes. Regarding the tools used, Sienge offers support in a greater portion in the area of supplies and has features that can be used in the application of the methodology, as well as the model and projects in BIM, such as in the extraction and organization of quantitative, however it requires a conference of the suggested data.Joinville, SCMonteiro, Anelize BorgesUniversidade Federal de Santa CatarinaDelfino, Joyce Moreira2022-03-28T16:48:46Z2022-03-28T16:48:46Z2022-03-18info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesis103 f.application/pdfhttps://repositorio.ufsc.br/handle/123456789/233246info:eu-repo/semantics/openAccessporreponame:Repositório Institucional da UFSCinstname:Universidade Federal de Santa Catarina (UFSC)instacron:UFSC2022-03-28T16:48:46Zoai:repositorio.ufsc.br:123456789/233246Repositório InstitucionalPUBhttp://150.162.242.35/oai/requestopendoar:23732022-03-28T16:48:46Repositório Institucional da UFSC - Universidade Federal de Santa Catarina (UFSC)false
dc.title.none.fl_str_mv Modelo de aplicação da metodologia AWP para planejamento e controle de obras e sua interação com as funcionalidades do BIM e Sienge: estudo de caso de um edifício de múltiplos pavimentos
title Modelo de aplicação da metodologia AWP para planejamento e controle de obras e sua interação com as funcionalidades do BIM e Sienge: estudo de caso de um edifício de múltiplos pavimentos
spellingShingle Modelo de aplicação da metodologia AWP para planejamento e controle de obras e sua interação com as funcionalidades do BIM e Sienge: estudo de caso de um edifício de múltiplos pavimentos
Delfino, Joyce Moreira
Planejamento
AWP
Suprimentos
Sienge
Edifício
Planning
AWP
Supplies
Sienge
Building
title_short Modelo de aplicação da metodologia AWP para planejamento e controle de obras e sua interação com as funcionalidades do BIM e Sienge: estudo de caso de um edifício de múltiplos pavimentos
title_full Modelo de aplicação da metodologia AWP para planejamento e controle de obras e sua interação com as funcionalidades do BIM e Sienge: estudo de caso de um edifício de múltiplos pavimentos
title_fullStr Modelo de aplicação da metodologia AWP para planejamento e controle de obras e sua interação com as funcionalidades do BIM e Sienge: estudo de caso de um edifício de múltiplos pavimentos
title_full_unstemmed Modelo de aplicação da metodologia AWP para planejamento e controle de obras e sua interação com as funcionalidades do BIM e Sienge: estudo de caso de um edifício de múltiplos pavimentos
title_sort Modelo de aplicação da metodologia AWP para planejamento e controle de obras e sua interação com as funcionalidades do BIM e Sienge: estudo de caso de um edifício de múltiplos pavimentos
author Delfino, Joyce Moreira
author_facet Delfino, Joyce Moreira
author_role author
dc.contributor.none.fl_str_mv Monteiro, Anelize Borges
Universidade Federal de Santa Catarina
dc.contributor.author.fl_str_mv Delfino, Joyce Moreira
dc.subject.por.fl_str_mv Planejamento
AWP
Suprimentos
Sienge
Edifício
Planning
AWP
Supplies
Sienge
Building
topic Planejamento
AWP
Suprimentos
Sienge
Edifício
Planning
AWP
Supplies
Sienge
Building
description TCC (graduação) - Universidade Federal de Santa Catarina. Campus Joinville. Engenharia Civil de Infraestrutura.
publishDate 2022
dc.date.none.fl_str_mv 2022-03-28T16:48:46Z
2022-03-28T16:48:46Z
2022-03-18
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/bachelorThesis
format bachelorThesis
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://repositorio.ufsc.br/handle/123456789/233246
url https://repositorio.ufsc.br/handle/123456789/233246
dc.language.iso.fl_str_mv por
language por
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv 103 f.
application/pdf
dc.publisher.none.fl_str_mv Joinville, SC
publisher.none.fl_str_mv Joinville, SC
dc.source.none.fl_str_mv reponame:Repositório Institucional da UFSC
instname:Universidade Federal de Santa Catarina (UFSC)
instacron:UFSC
instname_str Universidade Federal de Santa Catarina (UFSC)
instacron_str UFSC
institution UFSC
reponame_str Repositório Institucional da UFSC
collection Repositório Institucional da UFSC
repository.name.fl_str_mv Repositório Institucional da UFSC - Universidade Federal de Santa Catarina (UFSC)
repository.mail.fl_str_mv
_version_ 1808652035188326400