Viabilidade econômica da adaptação de um hospital público para obtenção de uma certificação ambiental

Detalhes bibliográficos
Autor(a) principal: Reis, Camila Candida Compagnoni dos
Data de Publicação: 2016
Tipo de documento: Dissertação
Idioma: por
Título da fonte: Repositório Institucional Manancial UFSM
Texto Completo: http://repositorio.ufsm.br/handle/1/18410
Resumo: The sustainable development has boosted the adoption of methodological tools for the evaluation of sustainability in buildings, so that the benefits go beyond protection with the environmental, resulting in better financial performance, competitive positioning and even better quality of life to the occupants of sustainable places. There is a sense in the market that the costs involved in sustainable construction are a 10% base for traditional constructions. The LEED certification is the system of sustainable classification most utilized of the world. Given this, it is questioned whether it is economically feasible for health care environments to adopt sustainable building standards in their renovation projects. Thus, this study aims to fill this gap, with the objective of analyzing the economic feasibility of the necessary physical adaptations in a university hospital, of public state, so that it can be certified by the LEED methodology. After identifying the aspects relevant to the understanding of the certification, a diagnosis was made considering the characteristics of environmental performance in the hospital. Based on the diagnosis, the necessary adaptations were identified to enable the certification process, as well as the costs incurred. Three scenarios were determined for the economic feasibility study, with variations in the projections of economies generated from the suggested adaptations: (a) pessimistic scenario, with a reduction of 10% in water consumption and 13% in energy consumption; (b) the most probable scenario, with reductions of 30% in the cost of water consumption and 18% of energy consumption; (c) an optimistic scenario, considering a 50% reduction in the cost of water consumption and a 25% reduction in energy consumption. Through Monte Carlo Simulation, we obtained probability distributions for the variable Net Present Value of the three scenarios, performing 200,000 simulations for each scenario. For the first scenario, 12 and 13% per year. For the second scenario and 14 and 15% per year. For the third scenario. The results showed non-viability for the pessimistic scenario, with 100% certainty for the NPV negative value. On the other hand, the optimistic scenario presented 100% certainty for positive NPV results. The most probable scenario presented a satisfactory result, with approximately 64% certainty of positive NPV, with an expected average value of R $ 65,082.31 and an Internal Rate of Return of 16%. The results obtained allow us to conclude that it is economically feasible to adapt by sustainable building standards in renovation projects, as in the case of the hospital studied. The proposed objective was obtained and the study contributes to the enrichment of the scientific community regarding the topic addressed. The adaptations considered in the public hospital allow a reduction in the monthly operating costs and the amount invested presented a payback of three years.
id UFSM-20_bd16bc06e9c4a63555e5e03125380f07
oai_identifier_str oai:repositorio.ufsm.br:1/18410
network_acronym_str UFSM-20
network_name_str Repositório Institucional Manancial UFSM
repository_id_str 3913
spelling 2019-09-24T17:41:12Z2019-09-24T17:41:12Z2016-02-15http://repositorio.ufsm.br/handle/1/18410The sustainable development has boosted the adoption of methodological tools for the evaluation of sustainability in buildings, so that the benefits go beyond protection with the environmental, resulting in better financial performance, competitive positioning and even better quality of life to the occupants of sustainable places. There is a sense in the market that the costs involved in sustainable construction are a 10% base for traditional constructions. The LEED certification is the system of sustainable classification most utilized of the world. Given this, it is questioned whether it is economically feasible for health care environments to adopt sustainable building standards in their renovation projects. Thus, this study aims to fill this gap, with the objective of analyzing the economic feasibility of the necessary physical adaptations in a university hospital, of public state, so that it can be certified by the LEED methodology. After identifying the aspects relevant to the understanding of the certification, a diagnosis was made considering the characteristics of environmental performance in the hospital. Based on the diagnosis, the necessary adaptations were identified to enable the certification process, as well as the costs incurred. Three scenarios were determined for the economic feasibility study, with variations in the projections of economies generated from the suggested adaptations: (a) pessimistic scenario, with a reduction of 10% in water consumption and 13% in energy consumption; (b) the most probable scenario, with reductions of 30% in the cost of water consumption and 18% of energy consumption; (c) an optimistic scenario, considering a 50% reduction in the cost of water consumption and a 25% reduction in energy consumption. Through Monte Carlo Simulation, we obtained probability distributions for the variable Net Present Value of the three scenarios, performing 200,000 simulations for each scenario. For the first scenario, 12 and 13% per year. For the second scenario and 14 and 15% per year. For the third scenario. The results showed non-viability for the pessimistic scenario, with 100% certainty for the NPV negative value. On the other hand, the optimistic scenario presented 100% certainty for positive NPV results. The most probable scenario presented a satisfactory result, with approximately 64% certainty of positive NPV, with an expected average value of R $ 65,082.31 and an Internal Rate of Return of 16%. The results obtained allow us to conclude that it is economically feasible to adapt by sustainable building standards in renovation projects, as in the case of the hospital studied. The proposed objective was obtained and the study contributes to the enrichment of the scientific community regarding the topic addressed. The adaptations considered in the public hospital allow a reduction in the monthly operating costs and the amount invested presented a payback of three years.O desenvolvimento sustentável impulsionou a adoção de ferramentas metodológicas de avaliação da sustentabilidade em edifícios, de modo que os benefícios vão além da proteção com o meio ambiente, resultando em melhor desempenho financeiro, posicionamento competitivo e ainda melhor qualidade de vida inerente aos ocupantes de ambientes mais sustentáveis. Há um sentimento no mercado de que os custos envolvidos em construções sustentáveis são na base de 10% superiores às construções tradicionais, entretanto, a comunidade científica pouco aborda estudos de viabilidade de investimentos para que certificações ambientais possam ser obtidas. A Certificação LEED é o sistema de classificação sustentável mais utilizado no mundo. Posto isto, questiona-se se é economicamente viável que ambientes assistenciais a saúde adotem padrões de edificações sustentáveis em seus projetos de renovação. Assim este estudo visa preencher esta lacuna, tendo como objetivo analisar a viabilidade econômica das adaptações físicas necessárias em um hospital universitário, de caráter público estadual, para que o mesmo possa vir a ser certificado pela metodologia LEED. Após a identificação dos aspectos relevantes para a compreensão da certificação foi realizado um diagnóstico considerando as características de desempenho ambiental no hospital. Com base no diagnóstico foram identificadas as adaptações necessárias para possibilitar o processo de certificação, bem como os custos incorridos. Três cenários foram determinados para o estudo de viabilidade econômica, com variações nas projeções de economias geradas a partir das adaptações sugeridas: (a) cenário pessimista, com redução de 10% no custo referente ao consumo de água e 13% ao consumo de energia; (b) cenário mais provável, com reduções de 30% no custo referente ao consumo de água e 18% ao consumo de energia e; (c) cenário otimista, considerando 50% de redução no custo referente ao consumo de água e 25% ao consumo de energia. Por meio da Simulação de Monte Carlo foram obtidas distribuições de probabilidade para a variável Valor Presente Líquido dos três cenários, realizando 200.000 simulações para cada cenário. Os resultados mostraram inviabilidade para o cenário pessimista, com 100% de certeza para valor negativo do VPL. Em contrapartida, o cenário otimista apresentou 100% de certeza para resultado positivo de VPL. O cenário mais provável apresentou resultado satisfatório, com aproximadamente 64% de certeza de VPL positivo, com valor médio esperado de R$65.082,31 e Taxa Interna de Retorno de 16%. Os resultados obtidos permitem concluir que é economicamente viável a adaptação por padrões de edificações sustentáveis em projetos de renovação, como no caso do hospital estudado. O objetivo proposto foi auferido e o estudo contribui para o enriquecimento da comunidade científica no que tange o tema abordado. As adaptações consideradas no hospital público permitem uma redução nos custos operacionais mensais e o valor investido apresentou payback de três anos.Coordenação de Aperfeiçoamento de Pessoal de Nível Superior - CAPESporUniversidade Federal de Santa MariaCentro de TecnologiaPrograma de Pós-Graduação em Engenharia de ProduçãoUFSMBrasilEngenharia de ProduçãoAttribution-NonCommercial-NoDerivatives 4.0 Internationalhttp://creativecommons.org/licenses/by-nc-nd/4.0/info:eu-repo/semantics/openAccessCertificação LEEDSimulação de Monte CarloAnálise de investimentosLEED certificationMonte Carlo simulationInvestment analysisCNPQ::ENGENHARIAS::ENGENHARIA DE PRODUCAOViabilidade econômica da adaptação de um hospital público para obtenção de uma certificação ambientalEconomic viability of the public hospital adaptation to obtain an environmental certificationinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesisWeise, Andreas Dittmarhttp://lattes.cnpq.br/1329623071793399Braghirolli, Lynceo Falavignahttp://lattes.cnpq.br/2992623886366532Medeiros, Daniel Reishttp://lattes.cnpq.br/4633003811292169http://lattes.cnpq.br/7481597238921936Reis, Camila Candida Compagnoni dos300800000005600a00c0b69-dbf1-4f0b-811a-d6239bbcc2379fd91092-fb5f-4e5d-a2a2-bd6eb3ff55e4cc0cb161-ee8c-4ee6-82e4-77a709140e56b6c676b5-ebb5-4525-9dd4-6c35f70cd1dcreponame:Repositório Institucional Manancial UFSMinstname:Universidade Federal de Santa Maria (UFSM)instacron:UFSMORIGINALDIS_PPGEP_2016_REIS_CAMILA.pdfDIS_PPGEP_2016_REIS_CAMILA.pdfDissertação de Mestradoapplication/pdf1493797http://repositorio.ufsm.br/bitstream/1/18410/1/DIS_PPGEP_2016_REIS_CAMILA.pdf332826d6a013b13fc5783b327890d8edMD51CC-LICENSElicense_rdflicense_rdfapplication/rdf+xml; charset=utf-8805http://repositorio.ufsm.br/bitstream/1/18410/2/license_rdf4460e5956bc1d1639be9ae6146a50347MD52LICENSElicense.txtlicense.txttext/plain; charset=utf-81956http://repositorio.ufsm.br/bitstream/1/18410/3/license.txt2f0571ecee68693bd5cd3f17c1e075dfMD53TEXTDIS_PPGEP_2016_REIS_CAMILA.pdf.txtDIS_PPGEP_2016_REIS_CAMILA.pdf.txtExtracted texttext/plain213213http://repositorio.ufsm.br/bitstream/1/18410/4/DIS_PPGEP_2016_REIS_CAMILA.pdf.txt8ceeb4a47ccba61d345be7f1ce9347a2MD54THUMBNAILDIS_PPGEP_2016_REIS_CAMILA.pdf.jpgDIS_PPGEP_2016_REIS_CAMILA.pdf.jpgIM Thumbnailimage/jpeg4261http://repositorio.ufsm.br/bitstream/1/18410/5/DIS_PPGEP_2016_REIS_CAMILA.pdf.jpgf2d428ef23b48d8dbf2f1d171aeec7f6MD551/184102019-09-25 03:01:21.675oai:repositorio.ufsm.br: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ório Institucionalhttp://repositorio.ufsm.br/PUBhttp://repositorio.ufsm.br/oai/requestouvidoria@ufsm.bropendoar:39132019-09-25T06:01:21Repositório Institucional Manancial UFSM - Universidade Federal de Santa Maria (UFSM)false
dc.title.por.fl_str_mv Viabilidade econômica da adaptação de um hospital público para obtenção de uma certificação ambiental
dc.title.alternative.eng.fl_str_mv Economic viability of the public hospital adaptation to obtain an environmental certification
title Viabilidade econômica da adaptação de um hospital público para obtenção de uma certificação ambiental
spellingShingle Viabilidade econômica da adaptação de um hospital público para obtenção de uma certificação ambiental
Reis, Camila Candida Compagnoni dos
Certificação LEED
Simulação de Monte Carlo
Análise de investimentos
LEED certification
Monte Carlo simulation
Investment analysis
CNPQ::ENGENHARIAS::ENGENHARIA DE PRODUCAO
title_short Viabilidade econômica da adaptação de um hospital público para obtenção de uma certificação ambiental
title_full Viabilidade econômica da adaptação de um hospital público para obtenção de uma certificação ambiental
title_fullStr Viabilidade econômica da adaptação de um hospital público para obtenção de uma certificação ambiental
title_full_unstemmed Viabilidade econômica da adaptação de um hospital público para obtenção de uma certificação ambiental
title_sort Viabilidade econômica da adaptação de um hospital público para obtenção de uma certificação ambiental
author Reis, Camila Candida Compagnoni dos
author_facet Reis, Camila Candida Compagnoni dos
author_role author
dc.contributor.advisor1.fl_str_mv Weise, Andreas Dittmar
dc.contributor.advisor1Lattes.fl_str_mv http://lattes.cnpq.br/1329623071793399
dc.contributor.referee1.fl_str_mv Braghirolli, Lynceo Falavigna
dc.contributor.referee1Lattes.fl_str_mv http://lattes.cnpq.br/2992623886366532
dc.contributor.referee2.fl_str_mv Medeiros, Daniel Reis
dc.contributor.referee2Lattes.fl_str_mv http://lattes.cnpq.br/4633003811292169
dc.contributor.authorLattes.fl_str_mv http://lattes.cnpq.br/7481597238921936
dc.contributor.author.fl_str_mv Reis, Camila Candida Compagnoni dos
contributor_str_mv Weise, Andreas Dittmar
Braghirolli, Lynceo Falavigna
Medeiros, Daniel Reis
dc.subject.por.fl_str_mv Certificação LEED
Simulação de Monte Carlo
Análise de investimentos
topic Certificação LEED
Simulação de Monte Carlo
Análise de investimentos
LEED certification
Monte Carlo simulation
Investment analysis
CNPQ::ENGENHARIAS::ENGENHARIA DE PRODUCAO
dc.subject.eng.fl_str_mv LEED certification
Monte Carlo simulation
Investment analysis
dc.subject.cnpq.fl_str_mv CNPQ::ENGENHARIAS::ENGENHARIA DE PRODUCAO
description The sustainable development has boosted the adoption of methodological tools for the evaluation of sustainability in buildings, so that the benefits go beyond protection with the environmental, resulting in better financial performance, competitive positioning and even better quality of life to the occupants of sustainable places. There is a sense in the market that the costs involved in sustainable construction are a 10% base for traditional constructions. The LEED certification is the system of sustainable classification most utilized of the world. Given this, it is questioned whether it is economically feasible for health care environments to adopt sustainable building standards in their renovation projects. Thus, this study aims to fill this gap, with the objective of analyzing the economic feasibility of the necessary physical adaptations in a university hospital, of public state, so that it can be certified by the LEED methodology. After identifying the aspects relevant to the understanding of the certification, a diagnosis was made considering the characteristics of environmental performance in the hospital. Based on the diagnosis, the necessary adaptations were identified to enable the certification process, as well as the costs incurred. Three scenarios were determined for the economic feasibility study, with variations in the projections of economies generated from the suggested adaptations: (a) pessimistic scenario, with a reduction of 10% in water consumption and 13% in energy consumption; (b) the most probable scenario, with reductions of 30% in the cost of water consumption and 18% of energy consumption; (c) an optimistic scenario, considering a 50% reduction in the cost of water consumption and a 25% reduction in energy consumption. Through Monte Carlo Simulation, we obtained probability distributions for the variable Net Present Value of the three scenarios, performing 200,000 simulations for each scenario. For the first scenario, 12 and 13% per year. For the second scenario and 14 and 15% per year. For the third scenario. The results showed non-viability for the pessimistic scenario, with 100% certainty for the NPV negative value. On the other hand, the optimistic scenario presented 100% certainty for positive NPV results. The most probable scenario presented a satisfactory result, with approximately 64% certainty of positive NPV, with an expected average value of R $ 65,082.31 and an Internal Rate of Return of 16%. The results obtained allow us to conclude that it is economically feasible to adapt by sustainable building standards in renovation projects, as in the case of the hospital studied. The proposed objective was obtained and the study contributes to the enrichment of the scientific community regarding the topic addressed. The adaptations considered in the public hospital allow a reduction in the monthly operating costs and the amount invested presented a payback of three years.
publishDate 2016
dc.date.issued.fl_str_mv 2016-02-15
dc.date.accessioned.fl_str_mv 2019-09-24T17:41:12Z
dc.date.available.fl_str_mv 2019-09-24T17:41:12Z
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/masterThesis
format masterThesis
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://repositorio.ufsm.br/handle/1/18410
url http://repositorio.ufsm.br/handle/1/18410
dc.language.iso.fl_str_mv por
language por
dc.relation.cnpq.fl_str_mv 300800000005
dc.relation.confidence.fl_str_mv 600
dc.relation.authority.fl_str_mv a00c0b69-dbf1-4f0b-811a-d6239bbcc237
9fd91092-fb5f-4e5d-a2a2-bd6eb3ff55e4
cc0cb161-ee8c-4ee6-82e4-77a709140e56
b6c676b5-ebb5-4525-9dd4-6c35f70cd1dc
dc.rights.driver.fl_str_mv Attribution-NonCommercial-NoDerivatives 4.0 International
http://creativecommons.org/licenses/by-nc-nd/4.0/
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Attribution-NonCommercial-NoDerivatives 4.0 International
http://creativecommons.org/licenses/by-nc-nd/4.0/
eu_rights_str_mv openAccess
dc.publisher.none.fl_str_mv Universidade Federal de Santa Maria
Centro de Tecnologia
dc.publisher.program.fl_str_mv Programa de Pós-Graduação em Engenharia de Produção
dc.publisher.initials.fl_str_mv UFSM
dc.publisher.country.fl_str_mv Brasil
dc.publisher.department.fl_str_mv Engenharia de Produção
publisher.none.fl_str_mv Universidade Federal de Santa Maria
Centro de Tecnologia
dc.source.none.fl_str_mv reponame:Repositório Institucional Manancial UFSM
instname:Universidade Federal de Santa Maria (UFSM)
instacron:UFSM
instname_str Universidade Federal de Santa Maria (UFSM)
instacron_str UFSM
institution UFSM
reponame_str Repositório Institucional Manancial UFSM
collection Repositório Institucional Manancial UFSM
bitstream.url.fl_str_mv http://repositorio.ufsm.br/bitstream/1/18410/1/DIS_PPGEP_2016_REIS_CAMILA.pdf
http://repositorio.ufsm.br/bitstream/1/18410/2/license_rdf
http://repositorio.ufsm.br/bitstream/1/18410/3/license.txt
http://repositorio.ufsm.br/bitstream/1/18410/4/DIS_PPGEP_2016_REIS_CAMILA.pdf.txt
http://repositorio.ufsm.br/bitstream/1/18410/5/DIS_PPGEP_2016_REIS_CAMILA.pdf.jpg
bitstream.checksum.fl_str_mv 332826d6a013b13fc5783b327890d8ed
4460e5956bc1d1639be9ae6146a50347
2f0571ecee68693bd5cd3f17c1e075df
8ceeb4a47ccba61d345be7f1ce9347a2
f2d428ef23b48d8dbf2f1d171aeec7f6
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
MD5
MD5
repository.name.fl_str_mv Repositório Institucional Manancial UFSM - Universidade Federal de Santa Maria (UFSM)
repository.mail.fl_str_mv ouvidoria@ufsm.br
_version_ 1808854720209485824