Serviço ancilar de potência reativa de geradores síncronos: aspectos técnicos e regulatórios
Autor(a) principal: | |
---|---|
Data de Publicação: | 2008 |
Tipo de documento: | Tese |
Idioma: | por |
Título da fonte: | Repositório Institucional da UFU |
Texto Completo: | https://repositorio.ufu.br/handle/123456789/14257 |
Resumo: | This work analyzes the technical and regulatory aspects of reactive power supply ancillary services of synchronous generators and emphasizes that Brazilian rules do not stimulate investment for such purpose and this can degrade those resources. In the past, the electrical worldwide systems used to have a centralized public utility which could include the several costs of ancillary services for electric power supply in the final price of the active power. After the privatization and decentralization, there was the need to separate the remuneration for such ancillary services. The resolutions that rule the reactive power ancillary services of synchronous generators have developed differently in several world regions. In this work it is given a description of some foreign legislations, which are then compared to the present status of Brazilian legislation, indicating its questionable aspects. Indexes are proposed for the selection of generators to supply reactive power to some electric power system area. It is proposed the public bidding for this supply taking the indexes into account, so that the price will depend on the effective contribution of each generator to the voltage rise in the target area. Simulations are presented to illustrate that the generator choice depends upon its localization. The need of reactive power support to improve the security margin against voltage collapse can be indicated by several indexes. It is shown a top view of the voltage collapse proximity indicators, with emphasis to those selected for this work. Often the electric power system operators call for a reactive power redispatch for voltage profile correction, but it is shown that sometimes this procedure leads to a risk of voltage collapse The dynamical behavior of synchronous generator excitation systems is very important for the reactive power dispatch. The operator requirements from Brazil, USA and Canada are presented. It is proposed a technique for voltage regulator adjustment, taking into account the time constant, the regulation error and the ceiling voltage, with illustration by means of simulations. Concluding, several suggestions are synthesized towards the evolution of the legislation concerning to reactive power supply from synchronous generators. |
id |
UFU_9f33e46913b241845decfc2efd9c5d24 |
---|---|
oai_identifier_str |
oai:repositorio.ufu.br:123456789/14257 |
network_acronym_str |
UFU |
network_name_str |
Repositório Institucional da UFU |
repository_id_str |
|
spelling |
Serviço ancilar de potência reativa de geradores síncronos: aspectos técnicos e regulatóriosSynchronous Generator Reactive Power Service: Technical and Regulatory AspectsGerador síncronoSuporte de potência reativaServiços ancilaresDinâmica de geradoresColapso de tensãoDespacho rápido de potênciaGeradores síncronosSynchronous generatorReactive power supportAncillary servicesGenerator dynamicsVoltage collapseFast power dispatchCNPQ::ENGENHARIAS::ENGENHARIA ELETRICAThis work analyzes the technical and regulatory aspects of reactive power supply ancillary services of synchronous generators and emphasizes that Brazilian rules do not stimulate investment for such purpose and this can degrade those resources. In the past, the electrical worldwide systems used to have a centralized public utility which could include the several costs of ancillary services for electric power supply in the final price of the active power. After the privatization and decentralization, there was the need to separate the remuneration for such ancillary services. The resolutions that rule the reactive power ancillary services of synchronous generators have developed differently in several world regions. In this work it is given a description of some foreign legislations, which are then compared to the present status of Brazilian legislation, indicating its questionable aspects. Indexes are proposed for the selection of generators to supply reactive power to some electric power system area. It is proposed the public bidding for this supply taking the indexes into account, so that the price will depend on the effective contribution of each generator to the voltage rise in the target area. Simulations are presented to illustrate that the generator choice depends upon its localization. The need of reactive power support to improve the security margin against voltage collapse can be indicated by several indexes. It is shown a top view of the voltage collapse proximity indicators, with emphasis to those selected for this work. Often the electric power system operators call for a reactive power redispatch for voltage profile correction, but it is shown that sometimes this procedure leads to a risk of voltage collapse The dynamical behavior of synchronous generator excitation systems is very important for the reactive power dispatch. The operator requirements from Brazil, USA and Canada are presented. It is proposed a technique for voltage regulator adjustment, taking into account the time constant, the regulation error and the ceiling voltage, with illustration by means of simulations. Concluding, several suggestions are synthesized towards the evolution of the legislation concerning to reactive power supply from synchronous generators.Doutor em CiênciasEste trabalho analisa aspectos técnicos e regulatórios dos serviços ancilares de geradores síncronos, no suporte de reativos, e enfatiza que as regras brasileiras, não estimulam investimentos para atender este propósito e isto pode degradar estes recursos. No passado, os sistemas elétricos ao redor do mundo costumavam ser serviços públicos centralizados que podiam incluir os vários custos dos serviços ancilares do suprimento de energia elétrica no preço final da potência ativa. Após a privatização e a descentralização foi necessário separar a remuneração dos serviços ancilares. As resoluções que regem o serviço ancilar de potência reativa dos geradores síncronos vêm evoluindo de modo diferente, em diversas regiões do mundo. Neste trabalho são descritas algumas legislações estrangeiras, as quais são comparadas com a legislação brasileira, indicando aspectos polêmicos da mesma. São propostos índices para seleção de geradores, destinados ao suporte de reativos para certa área do sistema elétrico. É proposta a concorrência pública para este fornecimento, considerando estes índices, de modo que o preço dependerá da contribuição efetiva de cada gerador para a elevação da tensão na área alvo. São apresentadas simulações ilustrando que a escolha do gerador depende de sua localização. A necessidade de suporte de potência reativa para melhorar a margem de segurança, em relação ao colapso de tensão, pode ser indicada por diversos índices. É apresentada uma visão panorâmica dos indicadores de proximidade do colapso de tensão, com ênfase nos utilizados neste trabalho. Freqüentemente os operadores de sistemas elétricos solicitam um re-despacho de potência reativa para corrigir o perfil de tensão, mas é mostrado que algumas vezes este procedimento leva a um risco de colapso de tensão. O comportamento dinâmico dos sistemas de excitação dos geradores síncronos é de fundamental importância durante o despacho de potência reativa. São apresentadas exigências de operadores do Brasil, dos EUA e do Canadá. É proposta uma técnica para ajuste do regulador de tensão, considerando a constante de tempo, o erro de regulação e a tensão de teto ( ceiling voltage ), com ilustração por meio de simulações. Finalizando, foram sintetizadas diversas sugestões para a evolução da legislação pertinente ao fornecimento de potência reativa pelos geradores síncronos.Universidade Federal de UberlândiaBRPrograma de Pós-graduação em Engenharia ElétricaEngenhariasUFUGuimarães, Geraldo Caixetahttp://buscatextual.cnpq.br/buscatextual/visualizacv.do?id=K4781139A4Andrade, Darizon Alves dehttp://buscatextual.cnpq.br/buscatextual/visualizacv.do?id=K4787741A6Bispo, Déciohttp://buscatextual.cnpq.br/buscatextual/visualizacv.do?id=K4707735H9Cardoso, José Robertohttp://buscatextual.cnpq.br/buscatextual/visualizacv.do?id=K4787269A0Rocco, Alexandrehttp://buscatextual.cnpq.br/buscatextual/visualizacv.do?id=K4773125E5Barbuy, Heraldo Silveira2016-06-22T18:37:43Z2008-12-232016-06-22T18:37:43Z2008-10-31info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/doctoralThesisapplication/pdfapplication/pdfBARBUY, Heraldo Silveira. Synchronous Generator Reactive Power Service: Technical and Regulatory Aspects. 2008. 145 f. Tese (Doutorado em Engenharias) - Universidade Federal de Uberlândia, Uberlândia, 2008.https://repositorio.ufu.br/handle/123456789/14257porinfo:eu-repo/semantics/openAccessreponame:Repositório Institucional da UFUinstname:Universidade Federal de Uberlândia (UFU)instacron:UFU2016-06-23T06:50:41Zoai:repositorio.ufu.br:123456789/14257Repositório InstitucionalONGhttp://repositorio.ufu.br/oai/requestdiinf@dirbi.ufu.bropendoar:2016-06-23T06:50:41Repositório Institucional da UFU - Universidade Federal de Uberlândia (UFU)false |
dc.title.none.fl_str_mv |
Serviço ancilar de potência reativa de geradores síncronos: aspectos técnicos e regulatórios Synchronous Generator Reactive Power Service: Technical and Regulatory Aspects |
title |
Serviço ancilar de potência reativa de geradores síncronos: aspectos técnicos e regulatórios |
spellingShingle |
Serviço ancilar de potência reativa de geradores síncronos: aspectos técnicos e regulatórios Barbuy, Heraldo Silveira Gerador síncrono Suporte de potência reativa Serviços ancilares Dinâmica de geradores Colapso de tensão Despacho rápido de potência Geradores síncronos Synchronous generator Reactive power support Ancillary services Generator dynamics Voltage collapse Fast power dispatch CNPQ::ENGENHARIAS::ENGENHARIA ELETRICA |
title_short |
Serviço ancilar de potência reativa de geradores síncronos: aspectos técnicos e regulatórios |
title_full |
Serviço ancilar de potência reativa de geradores síncronos: aspectos técnicos e regulatórios |
title_fullStr |
Serviço ancilar de potência reativa de geradores síncronos: aspectos técnicos e regulatórios |
title_full_unstemmed |
Serviço ancilar de potência reativa de geradores síncronos: aspectos técnicos e regulatórios |
title_sort |
Serviço ancilar de potência reativa de geradores síncronos: aspectos técnicos e regulatórios |
author |
Barbuy, Heraldo Silveira |
author_facet |
Barbuy, Heraldo Silveira |
author_role |
author |
dc.contributor.none.fl_str_mv |
Guimarães, Geraldo Caixeta http://buscatextual.cnpq.br/buscatextual/visualizacv.do?id=K4781139A4 Andrade, Darizon Alves de http://buscatextual.cnpq.br/buscatextual/visualizacv.do?id=K4787741A6 Bispo, Décio http://buscatextual.cnpq.br/buscatextual/visualizacv.do?id=K4707735H9 Cardoso, José Roberto http://buscatextual.cnpq.br/buscatextual/visualizacv.do?id=K4787269A0 Rocco, Alexandre http://buscatextual.cnpq.br/buscatextual/visualizacv.do?id=K4773125E5 |
dc.contributor.author.fl_str_mv |
Barbuy, Heraldo Silveira |
dc.subject.por.fl_str_mv |
Gerador síncrono Suporte de potência reativa Serviços ancilares Dinâmica de geradores Colapso de tensão Despacho rápido de potência Geradores síncronos Synchronous generator Reactive power support Ancillary services Generator dynamics Voltage collapse Fast power dispatch CNPQ::ENGENHARIAS::ENGENHARIA ELETRICA |
topic |
Gerador síncrono Suporte de potência reativa Serviços ancilares Dinâmica de geradores Colapso de tensão Despacho rápido de potência Geradores síncronos Synchronous generator Reactive power support Ancillary services Generator dynamics Voltage collapse Fast power dispatch CNPQ::ENGENHARIAS::ENGENHARIA ELETRICA |
description |
This work analyzes the technical and regulatory aspects of reactive power supply ancillary services of synchronous generators and emphasizes that Brazilian rules do not stimulate investment for such purpose and this can degrade those resources. In the past, the electrical worldwide systems used to have a centralized public utility which could include the several costs of ancillary services for electric power supply in the final price of the active power. After the privatization and decentralization, there was the need to separate the remuneration for such ancillary services. The resolutions that rule the reactive power ancillary services of synchronous generators have developed differently in several world regions. In this work it is given a description of some foreign legislations, which are then compared to the present status of Brazilian legislation, indicating its questionable aspects. Indexes are proposed for the selection of generators to supply reactive power to some electric power system area. It is proposed the public bidding for this supply taking the indexes into account, so that the price will depend on the effective contribution of each generator to the voltage rise in the target area. Simulations are presented to illustrate that the generator choice depends upon its localization. The need of reactive power support to improve the security margin against voltage collapse can be indicated by several indexes. It is shown a top view of the voltage collapse proximity indicators, with emphasis to those selected for this work. Often the electric power system operators call for a reactive power redispatch for voltage profile correction, but it is shown that sometimes this procedure leads to a risk of voltage collapse The dynamical behavior of synchronous generator excitation systems is very important for the reactive power dispatch. The operator requirements from Brazil, USA and Canada are presented. It is proposed a technique for voltage regulator adjustment, taking into account the time constant, the regulation error and the ceiling voltage, with illustration by means of simulations. Concluding, several suggestions are synthesized towards the evolution of the legislation concerning to reactive power supply from synchronous generators. |
publishDate |
2008 |
dc.date.none.fl_str_mv |
2008-12-23 2008-10-31 2016-06-22T18:37:43Z 2016-06-22T18:37:43Z |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/doctoralThesis |
format |
doctoralThesis |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
BARBUY, Heraldo Silveira. Synchronous Generator Reactive Power Service: Technical and Regulatory Aspects. 2008. 145 f. Tese (Doutorado em Engenharias) - Universidade Federal de Uberlândia, Uberlândia, 2008. https://repositorio.ufu.br/handle/123456789/14257 |
identifier_str_mv |
BARBUY, Heraldo Silveira. Synchronous Generator Reactive Power Service: Technical and Regulatory Aspects. 2008. 145 f. Tese (Doutorado em Engenharias) - Universidade Federal de Uberlândia, Uberlândia, 2008. |
url |
https://repositorio.ufu.br/handle/123456789/14257 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf application/pdf |
dc.publisher.none.fl_str_mv |
Universidade Federal de Uberlândia BR Programa de Pós-graduação em Engenharia Elétrica Engenharias UFU |
publisher.none.fl_str_mv |
Universidade Federal de Uberlândia BR Programa de Pós-graduação em Engenharia Elétrica Engenharias UFU |
dc.source.none.fl_str_mv |
reponame:Repositório Institucional da UFU instname:Universidade Federal de Uberlândia (UFU) instacron:UFU |
instname_str |
Universidade Federal de Uberlândia (UFU) |
instacron_str |
UFU |
institution |
UFU |
reponame_str |
Repositório Institucional da UFU |
collection |
Repositório Institucional da UFU |
repository.name.fl_str_mv |
Repositório Institucional da UFU - Universidade Federal de Uberlândia (UFU) |
repository.mail.fl_str_mv |
diinf@dirbi.ufu.br |
_version_ |
1813711418652884992 |