EVALUATION AND COMPARATIVE STUDY OF THE ENERGY POTENTIAL OF BIOGAS PRODUCED IN UASB REACTORS OF SEWAGE TREATMENT STATION

Detalhes bibliográficos
Autor(a) principal: Gomes, Gustavo Vieira
Data de Publicação: 2017
Outros Autores: Suda, Stephanie July, Pereira Rosa, André, de Ávila Rodrigues, Fábio
Tipo de documento: Artigo
Idioma: por
Título da fonte: The Journal of Engineering and Exact Sciences
Texto Completo: https://periodicos.ufv.br/jcec/article/view/2351
Resumo: Sanitary landfills and sewage treatment plants are primarily responsible for the production of biogas, which can cause serious environmental problems when emitted uncontrollably. One of the most promising forms of exploitation of the biogas is the production of electric, thermal or mechanical energy. In this study, simulations were performed through the simulator Aspen HYSYS v8.8 software to evaluate the economic and energy impact of the biogas purification process in a CHP (Combined Heat and Power) plant. The performance of the comparative study considered two energy production plants, one linked to the purification process and the other performing the direct burning of biogas for the production of electricity. The costs for the purification and non-purification process were US $ 17,600,000.00 and US $ 13,950,000.00, respectively. The minimum selling price (MSP) was estimated at 6.59 (US$/KWh) for the purification process and 0.52 (US$/KWh) for the process without purification. The amount of surplus electricity after meeting the energy demands of the Laboreaux effluent treatment plant (ETE) was also evaluated.
id UFV-6_b394828560011a0d81b38e78924dfeb1
oai_identifier_str oai:ojs.periodicos.ufv.br:article/2351
network_acronym_str UFV-6
network_name_str The Journal of Engineering and Exact Sciences
repository_id_str
spelling EVALUATION AND COMPARATIVE STUDY OF THE ENERGY POTENTIAL OF BIOGAS PRODUCED IN UASB REACTORS OF SEWAGE TREATMENT STATIONESTUDO DA PRODUÇÃO DE ENERGIA ELÉTRICA A PARTIR DE BIOGÁS COM E SEM PURIFICAÇÃO DE ESTAÇÃO DE TRATAMENTO DE ESGOTOBiogasAspen HYSYSBioenergySewage treatment stationEconomic analysis.BiogásAspen HYSYSBioenergiaTratamento de esgotoAnálise econômica.Sanitary landfills and sewage treatment plants are primarily responsible for the production of biogas, which can cause serious environmental problems when emitted uncontrollably. One of the most promising forms of exploitation of the biogas is the production of electric, thermal or mechanical energy. In this study, simulations were performed through the simulator Aspen HYSYS v8.8 software to evaluate the economic and energy impact of the biogas purification process in a CHP (Combined Heat and Power) plant. The performance of the comparative study considered two energy production plants, one linked to the purification process and the other performing the direct burning of biogas for the production of electricity. The costs for the purification and non-purification process were US $ 17,600,000.00 and US $ 13,950,000.00, respectively. The minimum selling price (MSP) was estimated at 6.59 (US$/KWh) for the purification process and 0.52 (US$/KWh) for the process without purification. The amount of surplus electricity after meeting the energy demands of the Laboreaux effluent treatment plant (ETE) was also evaluated. Aterros sanitários e estações de tratamento de esgoto são os principais responsáveis pela produção de biogás, que, quando emitido descontroladamente, pode causar graves problemas ambientais. Uma das formas mais promissoras de aproveitamento desse biogás é a produção de energia elétrica, térmica ou mecânica. Neste estudo foram realizadas simulações com o auxílio do software Aspen HYSYS v8.8 para avaliar os impactos econômicos e energéticos do processo de purificação do biogás em uma planta de produção de energia elétrica. A realização do estudo comparativo considerou duas plantas de produção energética, uma vinculada ao processo de purificação e outra realizando a queima direta do biogás para a produção de eletricidade.  O custo associado ao projeto com purificação foi 21% maior quando comparado ao processo sem purificação. Enquanto o valor mínimo de venda (MSP) foi estimado em 6,59 (US$/KWh) para o processo de purificação e 0,52 (US$/KWh) para o processo sem purificação. Foram avaliados também o custo capital e de operação de cada planta, assim como a quantidade de energia elétrica excedente, após suprir as demandas energéticas da estação de tratamento de efluentes (ETE).Universidade Federal de Viçosa - UFV2017-09-01info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://periodicos.ufv.br/jcec/article/view/235110.18540/jcecvl3iss7pp0899-0919The Journal of Engineering and Exact Sciences; Vol. 3 No. 7 (2017); 0899-0919The Journal of Engineering and Exact Sciences; Vol. 3 Núm. 7 (2017); 0899-0919The Journal of Engineering and Exact Sciences; v. 3 n. 7 (2017); 0899-09192527-1075reponame:The Journal of Engineering and Exact Sciencesinstname:Universidade Federal de Viçosa (UFV)instacron:UFVporhttps://periodicos.ufv.br/jcec/article/view/2351/1757Gomes, Gustavo VieiraSuda, Stephanie JulyPereira Rosa, Andréde Ávila Rodrigues, Fábioinfo:eu-repo/semantics/openAccess2018-12-10T17:00:16Zoai:ojs.periodicos.ufv.br:article/2351Revistahttp://www.seer.ufv.br/seer/rbeq2/index.php/req2/oai2527-10752527-1075opendoar:2018-12-10T17:00:16The Journal of Engineering and Exact Sciences - Universidade Federal de Viçosa (UFV)false
dc.title.none.fl_str_mv EVALUATION AND COMPARATIVE STUDY OF THE ENERGY POTENTIAL OF BIOGAS PRODUCED IN UASB REACTORS OF SEWAGE TREATMENT STATION
ESTUDO DA PRODUÇÃO DE ENERGIA ELÉTRICA A PARTIR DE BIOGÁS COM E SEM PURIFICAÇÃO DE ESTAÇÃO DE TRATAMENTO DE ESGOTO
title EVALUATION AND COMPARATIVE STUDY OF THE ENERGY POTENTIAL OF BIOGAS PRODUCED IN UASB REACTORS OF SEWAGE TREATMENT STATION
spellingShingle EVALUATION AND COMPARATIVE STUDY OF THE ENERGY POTENTIAL OF BIOGAS PRODUCED IN UASB REACTORS OF SEWAGE TREATMENT STATION
Gomes, Gustavo Vieira
Biogas
Aspen HYSYS
Bioenergy
Sewage treatment station
Economic analysis.
Biogás
Aspen HYSYS
Bioenergia
Tratamento de esgoto
Análise econômica.
title_short EVALUATION AND COMPARATIVE STUDY OF THE ENERGY POTENTIAL OF BIOGAS PRODUCED IN UASB REACTORS OF SEWAGE TREATMENT STATION
title_full EVALUATION AND COMPARATIVE STUDY OF THE ENERGY POTENTIAL OF BIOGAS PRODUCED IN UASB REACTORS OF SEWAGE TREATMENT STATION
title_fullStr EVALUATION AND COMPARATIVE STUDY OF THE ENERGY POTENTIAL OF BIOGAS PRODUCED IN UASB REACTORS OF SEWAGE TREATMENT STATION
title_full_unstemmed EVALUATION AND COMPARATIVE STUDY OF THE ENERGY POTENTIAL OF BIOGAS PRODUCED IN UASB REACTORS OF SEWAGE TREATMENT STATION
title_sort EVALUATION AND COMPARATIVE STUDY OF THE ENERGY POTENTIAL OF BIOGAS PRODUCED IN UASB REACTORS OF SEWAGE TREATMENT STATION
author Gomes, Gustavo Vieira
author_facet Gomes, Gustavo Vieira
Suda, Stephanie July
Pereira Rosa, André
de Ávila Rodrigues, Fábio
author_role author
author2 Suda, Stephanie July
Pereira Rosa, André
de Ávila Rodrigues, Fábio
author2_role author
author
author
dc.contributor.author.fl_str_mv Gomes, Gustavo Vieira
Suda, Stephanie July
Pereira Rosa, André
de Ávila Rodrigues, Fábio
dc.subject.por.fl_str_mv Biogas
Aspen HYSYS
Bioenergy
Sewage treatment station
Economic analysis.
Biogás
Aspen HYSYS
Bioenergia
Tratamento de esgoto
Análise econômica.
topic Biogas
Aspen HYSYS
Bioenergy
Sewage treatment station
Economic analysis.
Biogás
Aspen HYSYS
Bioenergia
Tratamento de esgoto
Análise econômica.
description Sanitary landfills and sewage treatment plants are primarily responsible for the production of biogas, which can cause serious environmental problems when emitted uncontrollably. One of the most promising forms of exploitation of the biogas is the production of electric, thermal or mechanical energy. In this study, simulations were performed through the simulator Aspen HYSYS v8.8 software to evaluate the economic and energy impact of the biogas purification process in a CHP (Combined Heat and Power) plant. The performance of the comparative study considered two energy production plants, one linked to the purification process and the other performing the direct burning of biogas for the production of electricity. The costs for the purification and non-purification process were US $ 17,600,000.00 and US $ 13,950,000.00, respectively. The minimum selling price (MSP) was estimated at 6.59 (US$/KWh) for the purification process and 0.52 (US$/KWh) for the process without purification. The amount of surplus electricity after meeting the energy demands of the Laboreaux effluent treatment plant (ETE) was also evaluated.
publishDate 2017
dc.date.none.fl_str_mv 2017-09-01
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://periodicos.ufv.br/jcec/article/view/2351
10.18540/jcecvl3iss7pp0899-0919
url https://periodicos.ufv.br/jcec/article/view/2351
identifier_str_mv 10.18540/jcecvl3iss7pp0899-0919
dc.language.iso.fl_str_mv por
language por
dc.relation.none.fl_str_mv https://periodicos.ufv.br/jcec/article/view/2351/1757
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidade Federal de Viçosa - UFV
publisher.none.fl_str_mv Universidade Federal de Viçosa - UFV
dc.source.none.fl_str_mv The Journal of Engineering and Exact Sciences; Vol. 3 No. 7 (2017); 0899-0919
The Journal of Engineering and Exact Sciences; Vol. 3 Núm. 7 (2017); 0899-0919
The Journal of Engineering and Exact Sciences; v. 3 n. 7 (2017); 0899-0919
2527-1075
reponame:The Journal of Engineering and Exact Sciences
instname:Universidade Federal de Viçosa (UFV)
instacron:UFV
instname_str Universidade Federal de Viçosa (UFV)
instacron_str UFV
institution UFV
reponame_str The Journal of Engineering and Exact Sciences
collection The Journal of Engineering and Exact Sciences
repository.name.fl_str_mv The Journal of Engineering and Exact Sciences - Universidade Federal de Viçosa (UFV)
repository.mail.fl_str_mv
_version_ 1808845243458519040