GESTÃO DE RESÍDUOS SÓLIDOS DA CONSTRUÇÃO CIVIL: UMA PROPOSTA PARA O MUNICÍPIO DE IPATINGA – MG

Detalhes bibliográficos
Autor(a) principal: Anderson Luiz Babilon
Data de Publicação: 2008
Tipo de documento: Dissertação
Idioma: por
Título da fonte: Biblioteca Digital de Teses e Dissertações da UNEC
Texto Completo: http://bibliotecadigital.unec.edu.br/bdtdunec/tde_busca/arquivo.php?codArquivo=123
Resumo: Ipatinga city’s, whichits economy is based in the steel industry is in the booming, driven mainly by continued growth in demand for steel worldwide, causing a significant increase in the supply of local labour, and hence the attraction of workforce outside. There is a forecast that up to 2009, over 12 thousand new jobs, will be generating, only in the steel plant of city. As a result of this scenario, the property market and building industry locally, are also overheated. The whole time, houses are demolished, giving rise to the emergence of new residential buildings, which together with the momentum the generation of waste from the building industry also increases each day. During the execution of works, rised a value of approximately 12.720t the construction of waste collected monthly of which 3.840t have destination uncertain, and even arranged in surrounding cities. The city has a landfill run by private enterprise, where in addition to household waste, also receives waste from construction, and three more private companies that work with transport route caçambas stationary, one of which has its own area and duly licensed by the council and the other two areas clandestine dispute to make their depositions. The economic viability to implement an integrated system of management of this waste as required under resolution nº 307 of CONAMA was raised, reaching an estimated time of 18 months for the initial investment to be absorbed. The studies were based on the model already in operation in the city of Belo Horizonte, which is characterized mainly by the simplicity and efficiency, even to show an important stamp social council. Despite not being given the existing federal law, the Ipatinga city’s, already positive signals in order to discipline the management of waste from the construction site, proof of this is the presence of areas for receipt of small volumes that have just being implemented in experimental phase and the withdrawal without cost to the residents, waste deposited in their sidewalks, to a certain limit. It has been expected that municipal work with regard waste from construction, are not only at this early stage and incipient, but if that move, arriving in fact the deployment of an efficient management system which allows the return of the entire area press that today is called a waste for the production chain, bringing up incalculable gains for the council and the environment.
id UNEC_4b8dcf932ffb585c4d1ef9f75b804bef
oai_identifier_str oai:unec.br:74
network_acronym_str UNEC
network_name_str Biblioteca Digital de Teses e Dissertações da UNEC
spelling info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesisGESTÃO DE RESÍDUOS SÓLIDOS DA CONSTRUÇÃO CIVIL: UMA PROPOSTA PARA O MUNICÍPIO DE IPATINGA – MG2008-09-24Luiz Cláudio Ribeiro Rodrigues 550.500.006-10http://buscatextual.cnpq.br/buscatextual/visualizacv.jsp?id=K4721412J2Marcos Alves Magalhães125.422.705-97http://lattes.cnpq.br/6486699845017366033.215.546-31Anderson Luiz BabilonCentro Universitário de CaratingaMestrado Profissional em Meio Ambiente e SustentabilidadeUNECBRmanagement solid waste construction civilgestão resíduos sólidos construção civilOUTROSIpatinga city’s, whichits economy is based in the steel industry is in the booming, driven mainly by continued growth in demand for steel worldwide, causing a significant increase in the supply of local labour, and hence the attraction of workforce outside. There is a forecast that up to 2009, over 12 thousand new jobs, will be generating, only in the steel plant of city. As a result of this scenario, the property market and building industry locally, are also overheated. The whole time, houses are demolished, giving rise to the emergence of new residential buildings, which together with the momentum the generation of waste from the building industry also increases each day. During the execution of works, rised a value of approximately 12.720t the construction of waste collected monthly of which 3.840t have destination uncertain, and even arranged in surrounding cities. The city has a landfill run by private enterprise, where in addition to household waste, also receives waste from construction, and three more private companies that work with transport route caçambas stationary, one of which has its own area and duly licensed by the council and the other two areas clandestine dispute to make their depositions. The economic viability to implement an integrated system of management of this waste as required under resolution nº 307 of CONAMA was raised, reaching an estimated time of 18 months for the initial investment to be absorbed. The studies were based on the model already in operation in the city of Belo Horizonte, which is characterized mainly by the simplicity and efficiency, even to show an important stamp social council. Despite not being given the existing federal law, the Ipatinga city’s, already positive signals in order to discipline the management of waste from the construction site, proof of this is the presence of areas for receipt of small volumes that have just being implemented in experimental phase and the withdrawal without cost to the residents, waste deposited in their sidewalks, to a certain limit. It has been expected that municipal work with regard waste from construction, are not only at this early stage and incipient, but if that move, arriving in fact the deployment of an efficient management system which allows the return of the entire area press that today is called a waste for the production chain, bringing up incalculable gains for the council and the environment.O município de Ipatinga, que tem a base de sua economia assentada na siderurgia encontra-se em franca expansão, impulsionado principalmente pelo constante crescimento da demanda de aço a nível mundial, provocando um aumento significativo da oferta de trabalho local e conseqüentemente, a atração de mão-de-obra externa. Existe uma previsão de que até o ano de 2009, mais 12 mil novos postos de empregos serão gerados, somente na planta siderúrgica da cidade. Como conseqüência deste cenário, o mercado imobiliário e a indústria da construção civil local, encontram-se também superaquecidos. Frequentemente observa-se no município de Ipatinga, casas sendo demolidas para dar espaço a novos prédios residenciais, ocasionando um significativo incremento na geração de resíduos provenientes da indústria da construção civil. De acordo com o levantamento de campo, estima-se que no município de Ipatinga 12.720t de resíduos da construção civil são coletados mensalmente, dos quais 3.840t têm destinação incerta, sendo até mesmo dispostos nos municípios circunvizinhos. O município de Ipatinga conta com um aterro sanitário administrado pela iniciativa privada, no qual, além dos resíduos sólidos domiciliares, também recebe resíduos provenientes da construção civil. Existem ainda no município de Ipatinga três empresas cadastradas na Prefeitura para locar caçambas estacionárias para coleta e transporte de entulhos, das quais uma conta com área própria para a disposição final devidamente licenciada pelo município e as outras duas disputam áreas clandestinas para fazerem suas deposições. A viabilidade econômica de se implantar um sistema integrado de gerenciamento dos resíduos de construção civil no município de Ipatinga, conforme o previsto na Resolução nº. 307 do Conselho Nacional de Meio Ambiente (CONAMA), de 05 de julho de 2002 foi levantada, chegando a um tempo estimado de 18 meses para que os investimentos iniciais sejam absorvidos. Os estudos tiveram como base, o modelo já em funcionamento na cidade de Belo Horizonte, que se caracteriza principalmente pela simplicidade e eficiência, além de apresentar um cunho social importantíssimo para aquele município. Apesar de não estar atendendo à Resolução nº. 307 do CONAMA, o município de Ipatinga, já sinaliza positivamente no sentido de disciplinar a gestão dos resíduos provenientes da construção civil local, prova disto é a disponibilização de áreas públicas para a recepção de pequenos volumes de resíduos de construção civil que acabam de serem implementadas em fase experimental, bem como a retirada sem ônus para os moradores, dos resíduos depositados em suas calçadas, até o limite de uma caçamba basculante. Espera-se que esta experiência não fique apenas nesta fase inicial e incipiente, mas que evolua, chegando de fato à implantação de um sistema de gestão eficiente que possibilite o retorno de toda a matéria prima que hoje é chamada de resíduo para a cadeia produtiva, trazendo-se ganhos para o município e para o meio ambiente.http://bibliotecadigital.unec.edu.br/bdtdunec/tde_busca/arquivo.php?codArquivo=123info:eu-repo/semantics/openAccessporreponame:Biblioteca Digital de Teses e Dissertações da UNECinstname:Centro Universitário de Caratingainstacron:UNEC2018-12-19T14:10:04Zmail@mail.com -
dc.title.pt.fl_str_mv GESTÃO DE RESÍDUOS SÓLIDOS DA CONSTRUÇÃO CIVIL: UMA PROPOSTA PARA O MUNICÍPIO DE IPATINGA – MG
title GESTÃO DE RESÍDUOS SÓLIDOS DA CONSTRUÇÃO CIVIL: UMA PROPOSTA PARA O MUNICÍPIO DE IPATINGA – MG
spellingShingle GESTÃO DE RESÍDUOS SÓLIDOS DA CONSTRUÇÃO CIVIL: UMA PROPOSTA PARA O MUNICÍPIO DE IPATINGA – MG
Anderson Luiz Babilon
gestão
resíduos sólidos
construção civil
OUTROS
title_short GESTÃO DE RESÍDUOS SÓLIDOS DA CONSTRUÇÃO CIVIL: UMA PROPOSTA PARA O MUNICÍPIO DE IPATINGA – MG
title_full GESTÃO DE RESÍDUOS SÓLIDOS DA CONSTRUÇÃO CIVIL: UMA PROPOSTA PARA O MUNICÍPIO DE IPATINGA – MG
title_fullStr GESTÃO DE RESÍDUOS SÓLIDOS DA CONSTRUÇÃO CIVIL: UMA PROPOSTA PARA O MUNICÍPIO DE IPATINGA – MG
title_full_unstemmed GESTÃO DE RESÍDUOS SÓLIDOS DA CONSTRUÇÃO CIVIL: UMA PROPOSTA PARA O MUNICÍPIO DE IPATINGA – MG
title_sort GESTÃO DE RESÍDUOS SÓLIDOS DA CONSTRUÇÃO CIVIL: UMA PROPOSTA PARA O MUNICÍPIO DE IPATINGA – MG
author Anderson Luiz Babilon
author_facet Anderson Luiz Babilon
author_role author
dc.contributor.advisor1.fl_str_mv Luiz Cláudio Ribeiro Rodrigues
dc.contributor.advisor1ID.fl_str_mv 550.500.006-10
dc.contributor.advisor1Lattes.fl_str_mv http://buscatextual.cnpq.br/buscatextual/visualizacv.jsp?id=K4721412J2
dc.contributor.advisor-co1.fl_str_mv Marcos Alves Magalhães
dc.contributor.advisor-co1ID.fl_str_mv 125.422.705-97
dc.contributor.advisor-co1Lattes.fl_str_mv http://lattes.cnpq.br/6486699845017366
dc.contributor.authorID.fl_str_mv 033.215.546-31
dc.contributor.author.fl_str_mv Anderson Luiz Babilon
contributor_str_mv Luiz Cláudio Ribeiro Rodrigues
Marcos Alves Magalhães
dc.subject.por.fl_str_mv gestão
resíduos sólidos
construção civil
topic gestão
resíduos sólidos
construção civil
OUTROS
dc.subject.cnpq.fl_str_mv OUTROS
dc.description.abstract..fl_txt_mv Ipatinga city’s, whichits economy is based in the steel industry is in the booming, driven mainly by continued growth in demand for steel worldwide, causing a significant increase in the supply of local labour, and hence the attraction of workforce outside. There is a forecast that up to 2009, over 12 thousand new jobs, will be generating, only in the steel plant of city. As a result of this scenario, the property market and building industry locally, are also overheated. The whole time, houses are demolished, giving rise to the emergence of new residential buildings, which together with the momentum the generation of waste from the building industry also increases each day. During the execution of works, rised a value of approximately 12.720t the construction of waste collected monthly of which 3.840t have destination uncertain, and even arranged in surrounding cities. The city has a landfill run by private enterprise, where in addition to household waste, also receives waste from construction, and three more private companies that work with transport route caçambas stationary, one of which has its own area and duly licensed by the council and the other two areas clandestine dispute to make their depositions. The economic viability to implement an integrated system of management of this waste as required under resolution nº 307 of CONAMA was raised, reaching an estimated time of 18 months for the initial investment to be absorbed. The studies were based on the model already in operation in the city of Belo Horizonte, which is characterized mainly by the simplicity and efficiency, even to show an important stamp social council. Despite not being given the existing federal law, the Ipatinga city’s, already positive signals in order to discipline the management of waste from the construction site, proof of this is the presence of areas for receipt of small volumes that have just being implemented in experimental phase and the withdrawal without cost to the residents, waste deposited in their sidewalks, to a certain limit. It has been expected that municipal work with regard waste from construction, are not only at this early stage and incipient, but if that move, arriving in fact the deployment of an efficient management system which allows the return of the entire area press that today is called a waste for the production chain, bringing up incalculable gains for the council and the environment.
dc.description.abstract.por.fl_txt_mv O município de Ipatinga, que tem a base de sua economia assentada na siderurgia encontra-se em franca expansão, impulsionado principalmente pelo constante crescimento da demanda de aço a nível mundial, provocando um aumento significativo da oferta de trabalho local e conseqüentemente, a atração de mão-de-obra externa. Existe uma previsão de que até o ano de 2009, mais 12 mil novos postos de empregos serão gerados, somente na planta siderúrgica da cidade. Como conseqüência deste cenário, o mercado imobiliário e a indústria da construção civil local, encontram-se também superaquecidos. Frequentemente observa-se no município de Ipatinga, casas sendo demolidas para dar espaço a novos prédios residenciais, ocasionando um significativo incremento na geração de resíduos provenientes da indústria da construção civil. De acordo com o levantamento de campo, estima-se que no município de Ipatinga 12.720t de resíduos da construção civil são coletados mensalmente, dos quais 3.840t têm destinação incerta, sendo até mesmo dispostos nos municípios circunvizinhos. O município de Ipatinga conta com um aterro sanitário administrado pela iniciativa privada, no qual, além dos resíduos sólidos domiciliares, também recebe resíduos provenientes da construção civil. Existem ainda no município de Ipatinga três empresas cadastradas na Prefeitura para locar caçambas estacionárias para coleta e transporte de entulhos, das quais uma conta com área própria para a disposição final devidamente licenciada pelo município e as outras duas disputam áreas clandestinas para fazerem suas deposições. A viabilidade econômica de se implantar um sistema integrado de gerenciamento dos resíduos de construção civil no município de Ipatinga, conforme o previsto na Resolução nº. 307 do Conselho Nacional de Meio Ambiente (CONAMA), de 05 de julho de 2002 foi levantada, chegando a um tempo estimado de 18 meses para que os investimentos iniciais sejam absorvidos. Os estudos tiveram como base, o modelo já em funcionamento na cidade de Belo Horizonte, que se caracteriza principalmente pela simplicidade e eficiência, além de apresentar um cunho social importantíssimo para aquele município. Apesar de não estar atendendo à Resolução nº. 307 do CONAMA, o município de Ipatinga, já sinaliza positivamente no sentido de disciplinar a gestão dos resíduos provenientes da construção civil local, prova disto é a disponibilização de áreas públicas para a recepção de pequenos volumes de resíduos de construção civil que acabam de serem implementadas em fase experimental, bem como a retirada sem ônus para os moradores, dos resíduos depositados em suas calçadas, até o limite de uma caçamba basculante. Espera-se que esta experiência não fique apenas nesta fase inicial e incipiente, mas que evolua, chegando de fato à implantação de um sistema de gestão eficiente que possibilite o retorno de toda a matéria prima que hoje é chamada de resíduo para a cadeia produtiva, trazendo-se ganhos para o município e para o meio ambiente.
description Ipatinga city’s, whichits economy is based in the steel industry is in the booming, driven mainly by continued growth in demand for steel worldwide, causing a significant increase in the supply of local labour, and hence the attraction of workforce outside. There is a forecast that up to 2009, over 12 thousand new jobs, will be generating, only in the steel plant of city. As a result of this scenario, the property market and building industry locally, are also overheated. The whole time, houses are demolished, giving rise to the emergence of new residential buildings, which together with the momentum the generation of waste from the building industry also increases each day. During the execution of works, rised a value of approximately 12.720t the construction of waste collected monthly of which 3.840t have destination uncertain, and even arranged in surrounding cities. The city has a landfill run by private enterprise, where in addition to household waste, also receives waste from construction, and three more private companies that work with transport route caçambas stationary, one of which has its own area and duly licensed by the council and the other two areas clandestine dispute to make their depositions. The economic viability to implement an integrated system of management of this waste as required under resolution nº 307 of CONAMA was raised, reaching an estimated time of 18 months for the initial investment to be absorbed. The studies were based on the model already in operation in the city of Belo Horizonte, which is characterized mainly by the simplicity and efficiency, even to show an important stamp social council. Despite not being given the existing federal law, the Ipatinga city’s, already positive signals in order to discipline the management of waste from the construction site, proof of this is the presence of areas for receipt of small volumes that have just being implemented in experimental phase and the withdrawal without cost to the residents, waste deposited in their sidewalks, to a certain limit. It has been expected that municipal work with regard waste from construction, are not only at this early stage and incipient, but if that move, arriving in fact the deployment of an efficient management system which allows the return of the entire area press that today is called a waste for the production chain, bringing up incalculable gains for the council and the environment.
publishDate 2008
dc.date.issued.fl_str_mv 2008-09-24
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/masterThesis
status_str publishedVersion
format masterThesis
dc.identifier.uri.fl_str_mv http://bibliotecadigital.unec.edu.br/bdtdunec/tde_busca/arquivo.php?codArquivo=123
url http://bibliotecadigital.unec.edu.br/bdtdunec/tde_busca/arquivo.php?codArquivo=123
dc.language.iso.fl_str_mv por
language por
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.publisher.none.fl_str_mv Centro Universitário de Caratinga
dc.publisher.program.fl_str_mv Mestrado Profissional em Meio Ambiente e Sustentabilidade
dc.publisher.initials.fl_str_mv UNEC
dc.publisher.country.fl_str_mv BR
publisher.none.fl_str_mv Centro Universitário de Caratinga
dc.source.none.fl_str_mv reponame:Biblioteca Digital de Teses e Dissertações da UNEC
instname:Centro Universitário de Caratinga
instacron:UNEC
reponame_str Biblioteca Digital de Teses e Dissertações da UNEC
collection Biblioteca Digital de Teses e Dissertações da UNEC
instname_str Centro Universitário de Caratinga
instacron_str UNEC
institution UNEC
repository.name.fl_str_mv -
repository.mail.fl_str_mv mail@mail.com
_version_ 1620303213865467904