Mathematical modeling to optimize production planning and scheduling in a small foundry with multiple alternating furnaces

Detalhes bibliográficos
Autor(a) principal: Bertulucci, Michael Ferreira
Data de Publicação: 2021
Outros Autores: Alves, Giovanna Abreu, Camargo, Victor Claudio Bento
Tipo de documento: Artigo
Idioma: eng
por
Título da fonte: GEPROS. Gestão da Produção. Operações e Sistemas
Texto Completo: https://revista.feb.unesp.br/gepros/article/view/2818
Resumo: Purpose - This study presents an extension to a model in the literature for lot-sizing and scheduling in a small foundry with multiple alternate furnaces. The purpose of the model is to minimize delays and inventory costs. In addition, it determines the best use of the load capacity in the furnaces.Theoretical framework – Lot-sizing in foundries in the marketplace is a subject of academic interest due to its applicability and mathematical and computational complexity. Many papers address the production problem in foundries with a single furnace, however, few papers address the possibility of multiple furnaces.Design/methodology/approach - Mathematical modeling was used to represent the lot-sizing and scheduling problem in a small foundry. Data from the company's order books were collected and model validation questionnaires were applied.Findings - The extended model was able to generate good production plans at different planning horizons, with better performance than the current methods obtained by the company.Originality/value - the extension of the model contributes to the literature by addressing the existence of multiple non-simultaneous furnaces, a feature that has not been greatly explored. A comparison with other models is performed to indicate the most suitable model for actual application.Keywords: Alloys scheduling. Foundry. Lot size. Mixed integer programming.
id UNESP-2_2045eeb3a637f1d7c1930425a8037641
oai_identifier_str oai:ojs.gepros.emnuvens.com.br:article/2818
network_acronym_str UNESP-2
network_name_str GEPROS. Gestão da Produção. Operações e Sistemas
repository_id_str
spelling Mathematical modeling to optimize production planning and scheduling in a small foundry with multiple alternating furnacesFundiçãoDimensionamento de lotesSequenciamento de ligasProgramação inteira mista.Purpose - This study presents an extension to a model in the literature for lot-sizing and scheduling in a small foundry with multiple alternate furnaces. The purpose of the model is to minimize delays and inventory costs. In addition, it determines the best use of the load capacity in the furnaces.Theoretical framework – Lot-sizing in foundries in the marketplace is a subject of academic interest due to its applicability and mathematical and computational complexity. Many papers address the production problem in foundries with a single furnace, however, few papers address the possibility of multiple furnaces.Design/methodology/approach - Mathematical modeling was used to represent the lot-sizing and scheduling problem in a small foundry. Data from the company's order books were collected and model validation questionnaires were applied.Findings - The extended model was able to generate good production plans at different planning horizons, with better performance than the current methods obtained by the company.Originality/value - the extension of the model contributes to the literature by addressing the existence of multiple non-simultaneous furnaces, a feature that has not been greatly explored. A comparison with other models is performed to indicate the most suitable model for actual application.Keywords: Alloys scheduling. Foundry. Lot size. Mixed integer programming.A Fundacao para o Desenvolvimento de Bauru (FunDeB)2021-12-13info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfapplication/vnd.openxmlformats-officedocument.wordprocessingml.documenthttps://revista.feb.unesp.br/gepros/article/view/281810.15675/gepros.v16i4.2818Revista Gestão da Produção Operações e Sistemas; v. 16 n. 4 (2021); 821984-2430reponame:GEPROS. Gestão da Produção. Operações e Sistemasinstname:Universidade Estadual Paulista (UNESP)instacron:UNESPengporhttps://revista.feb.unesp.br/gepros/article/view/2818/pdfhttps://revista.feb.unesp.br/gepros/article/view/2818/1946Copyright (c) 2021 Revista Gestão da Produção Operações e Sistemasinfo:eu-repo/semantics/openAccessBertulucci, Michael FerreiraAlves, Giovanna AbreuCamargo, Victor Claudio Bento2023-11-22T15:24:58Zoai:ojs.gepros.emnuvens.com.br:article/2818Revistahttps://revista.feb.unesp.br/geprosPUBhttps://revista.feb.unesp.br/gepros/oaigepros@feb.unesp.br||abjabbour@feb.unesp.br1984-24301809-614Xopendoar:2023-11-22T15:24:58GEPROS. Gestão da Produção. Operações e Sistemas - Universidade Estadual Paulista (UNESP)false
dc.title.none.fl_str_mv Mathematical modeling to optimize production planning and scheduling in a small foundry with multiple alternating furnaces
title Mathematical modeling to optimize production planning and scheduling in a small foundry with multiple alternating furnaces
spellingShingle Mathematical modeling to optimize production planning and scheduling in a small foundry with multiple alternating furnaces
Bertulucci, Michael Ferreira
Fundição
Dimensionamento de lotes
Sequenciamento de ligas
Programação inteira mista.
title_short Mathematical modeling to optimize production planning and scheduling in a small foundry with multiple alternating furnaces
title_full Mathematical modeling to optimize production planning and scheduling in a small foundry with multiple alternating furnaces
title_fullStr Mathematical modeling to optimize production planning and scheduling in a small foundry with multiple alternating furnaces
title_full_unstemmed Mathematical modeling to optimize production planning and scheduling in a small foundry with multiple alternating furnaces
title_sort Mathematical modeling to optimize production planning and scheduling in a small foundry with multiple alternating furnaces
author Bertulucci, Michael Ferreira
author_facet Bertulucci, Michael Ferreira
Alves, Giovanna Abreu
Camargo, Victor Claudio Bento
author_role author
author2 Alves, Giovanna Abreu
Camargo, Victor Claudio Bento
author2_role author
author
dc.contributor.author.fl_str_mv Bertulucci, Michael Ferreira
Alves, Giovanna Abreu
Camargo, Victor Claudio Bento
dc.subject.por.fl_str_mv Fundição
Dimensionamento de lotes
Sequenciamento de ligas
Programação inteira mista.
topic Fundição
Dimensionamento de lotes
Sequenciamento de ligas
Programação inteira mista.
description Purpose - This study presents an extension to a model in the literature for lot-sizing and scheduling in a small foundry with multiple alternate furnaces. The purpose of the model is to minimize delays and inventory costs. In addition, it determines the best use of the load capacity in the furnaces.Theoretical framework – Lot-sizing in foundries in the marketplace is a subject of academic interest due to its applicability and mathematical and computational complexity. Many papers address the production problem in foundries with a single furnace, however, few papers address the possibility of multiple furnaces.Design/methodology/approach - Mathematical modeling was used to represent the lot-sizing and scheduling problem in a small foundry. Data from the company's order books were collected and model validation questionnaires were applied.Findings - The extended model was able to generate good production plans at different planning horizons, with better performance than the current methods obtained by the company.Originality/value - the extension of the model contributes to the literature by addressing the existence of multiple non-simultaneous furnaces, a feature that has not been greatly explored. A comparison with other models is performed to indicate the most suitable model for actual application.Keywords: Alloys scheduling. Foundry. Lot size. Mixed integer programming.
publishDate 2021
dc.date.none.fl_str_mv 2021-12-13
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://revista.feb.unesp.br/gepros/article/view/2818
10.15675/gepros.v16i4.2818
url https://revista.feb.unesp.br/gepros/article/view/2818
identifier_str_mv 10.15675/gepros.v16i4.2818
dc.language.iso.fl_str_mv eng
por
language eng
por
dc.relation.none.fl_str_mv https://revista.feb.unesp.br/gepros/article/view/2818/pdf
https://revista.feb.unesp.br/gepros/article/view/2818/1946
dc.rights.driver.fl_str_mv Copyright (c) 2021 Revista Gestão da Produção Operações e Sistemas
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Copyright (c) 2021 Revista Gestão da Produção Operações e Sistemas
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
application/vnd.openxmlformats-officedocument.wordprocessingml.document
dc.publisher.none.fl_str_mv A Fundacao para o Desenvolvimento de Bauru (FunDeB)
publisher.none.fl_str_mv A Fundacao para o Desenvolvimento de Bauru (FunDeB)
dc.source.none.fl_str_mv Revista Gestão da Produção Operações e Sistemas; v. 16 n. 4 (2021); 82
1984-2430
reponame:GEPROS. Gestão da Produção. Operações e Sistemas
instname:Universidade Estadual Paulista (UNESP)
instacron:UNESP
instname_str Universidade Estadual Paulista (UNESP)
instacron_str UNESP
institution UNESP
reponame_str GEPROS. Gestão da Produção. Operações e Sistemas
collection GEPROS. Gestão da Produção. Operações e Sistemas
repository.name.fl_str_mv GEPROS. Gestão da Produção. Operações e Sistemas - Universidade Estadual Paulista (UNESP)
repository.mail.fl_str_mv gepros@feb.unesp.br||abjabbour@feb.unesp.br
_version_ 1788170895309668352