The hydroelectric power plant of the Widemann cotton mill (San Germano Chisone, Turin): perspectives of knowledge, conservation and enhancement.

Detalhes bibliográficos
Autor(a) principal: Rudiero, Riccardo
Data de Publicação: 2017
Tipo de documento: Artigo
Idioma: ita
Título da fonte: Labor & Engenho (Online)
Texto Completo: https://periodicos.sbu.unicamp.br/ojs/index.php/labore/article/view/8651203
Resumo: Alpine valleys Pellice, Chisone and Germanasca, at whose feet lies the town of Pinerolo (TO), were among the first most industrialized areas of the Savoy state, vocation still spotted in the wide network of material evidences, such as production complexes, social facilities built for the working class, water channeling, electrification system. About the latter, there are still many active structures in the production of electricity. Some of them are dismantling, others are in operation, others are in the process of being transformed. This contribution will be focused on the case of the hydroelectric power plant of Widemann cotton mill in San Germano Chisone (TO), where the analysis of the existing structures and a diachronic reading of the archive documents has allowed to reconstruct its history and has provided the basis for some suggestions related to its conservation and enhancement.
id UNICAMP-15_565e9b13008297d70d3a97e3c6a6da92
oai_identifier_str oai:ojs.periodicos.sbu.unicamp.br:article/8651203
network_acronym_str UNICAMP-15
network_name_str Labor & Engenho (Online)
repository_id_str
spelling The hydroelectric power plant of the Widemann cotton mill (San Germano Chisone, Turin): perspectives of knowledge, conservation and enhancement.La centrale idroelettrica del cotonificio Widemann (San Germano Chisone, Torino): prospettive di conoscenza, conservazione e valorizzazione.Impianto idroelettrico. Progetti. Archivio. Conservazione. Valorizzazione.Hydroelectric power plant. Projects. Archive. Conservation. Enhancement.Alpine valleys Pellice, Chisone and Germanasca, at whose feet lies the town of Pinerolo (TO), were among the first most industrialized areas of the Savoy state, vocation still spotted in the wide network of material evidences, such as production complexes, social facilities built for the working class, water channeling, electrification system. About the latter, there are still many active structures in the production of electricity. Some of them are dismantling, others are in operation, others are in the process of being transformed. This contribution will be focused on the case of the hydroelectric power plant of Widemann cotton mill in San Germano Chisone (TO), where the analysis of the existing structures and a diachronic reading of the archive documents has allowed to reconstruct its history and has provided the basis for some suggestions related to its conservation and enhancement.Le valli alpine del Pellice, Chisone e Germanasca, ai cui piedi sorge la città di Pinerolo (TO), furono tra le prime aree industrializzate dello stato sabaudo, vocazione che si riscontra ancora in un’ampia rete di testimonianze materiali: dai complessi produttivi alle opere sociali per la classe operaia; dalle infrastrutture di sfruttamento delle acque al sistema di elettrificazione. Riguardo quest’ultimo, sono ancora numerose le strutture atte alla generazione di energia elettrica, talune dismesse, altre in funzione, altre ancora in corso di trasformazione. Il presente contributo si soffermerà sul caso della centrale idroelettrica del Cotonificio Widemann di San Germano Chisone (TO), dove l’analisi dell’esistente e una lettura diacronica dei documenti d’archivio hanno permesso di ricostruirne la storia e hanno fornito la base per alcune suggestioni legate alla sua conservazione e valorizzazione.Universidade Estadual de Campinas2017-12-26info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionRevisão de Literaturaapplication/pdfhttps://periodicos.sbu.unicamp.br/ojs/index.php/labore/article/view/865120310.20396/labore.v11i4.8651203Labor e Engenho; Vol. 11 No. 4 (2017): out./dez.; 492-506Labor e Engenho; Vol. 11 Núm. 4 (2017): out./dez.; 492-506Labor e Engenho; v. 11 n. 4 (2017): out./dez.; 492-5062176-8846reponame:Labor & Engenho (Online)instname:Universidade Estadual de Campinas (UNICAMP)instacron:UNICAMPitahttps://periodicos.sbu.unicamp.br/ojs/index.php/labore/article/view/8651203/17423Copyright (c) 2017 Labor e Engenhoinfo:eu-repo/semantics/openAccessRudiero, Riccardo2018-01-04T10:24:38Zoai:ojs.periodicos.sbu.unicamp.br:article/8651203Revistahttp://periodicos.sbu.unicamp.br/ojs/index.php/laborePUBhttps://periodicos.sbu.unicamp.br/ojs/index.php/labore/oai||argollo@fec.unicamp.br2176-88461981-1152opendoar:2018-01-04T10:24:38Labor & Engenho (Online) - Universidade Estadual de Campinas (UNICAMP)false
dc.title.none.fl_str_mv The hydroelectric power plant of the Widemann cotton mill (San Germano Chisone, Turin): perspectives of knowledge, conservation and enhancement.
La centrale idroelettrica del cotonificio Widemann (San Germano Chisone, Torino): prospettive di conoscenza, conservazione e valorizzazione.
title The hydroelectric power plant of the Widemann cotton mill (San Germano Chisone, Turin): perspectives of knowledge, conservation and enhancement.
spellingShingle The hydroelectric power plant of the Widemann cotton mill (San Germano Chisone, Turin): perspectives of knowledge, conservation and enhancement.
Rudiero, Riccardo
Impianto idroelettrico. Progetti. Archivio. Conservazione. Valorizzazione.
Hydroelectric power plant. Projects. Archive. Conservation. Enhancement.
title_short The hydroelectric power plant of the Widemann cotton mill (San Germano Chisone, Turin): perspectives of knowledge, conservation and enhancement.
title_full The hydroelectric power plant of the Widemann cotton mill (San Germano Chisone, Turin): perspectives of knowledge, conservation and enhancement.
title_fullStr The hydroelectric power plant of the Widemann cotton mill (San Germano Chisone, Turin): perspectives of knowledge, conservation and enhancement.
title_full_unstemmed The hydroelectric power plant of the Widemann cotton mill (San Germano Chisone, Turin): perspectives of knowledge, conservation and enhancement.
title_sort The hydroelectric power plant of the Widemann cotton mill (San Germano Chisone, Turin): perspectives of knowledge, conservation and enhancement.
author Rudiero, Riccardo
author_facet Rudiero, Riccardo
author_role author
dc.contributor.author.fl_str_mv Rudiero, Riccardo
dc.subject.por.fl_str_mv Impianto idroelettrico. Progetti. Archivio. Conservazione. Valorizzazione.
Hydroelectric power plant. Projects. Archive. Conservation. Enhancement.
topic Impianto idroelettrico. Progetti. Archivio. Conservazione. Valorizzazione.
Hydroelectric power plant. Projects. Archive. Conservation. Enhancement.
description Alpine valleys Pellice, Chisone and Germanasca, at whose feet lies the town of Pinerolo (TO), were among the first most industrialized areas of the Savoy state, vocation still spotted in the wide network of material evidences, such as production complexes, social facilities built for the working class, water channeling, electrification system. About the latter, there are still many active structures in the production of electricity. Some of them are dismantling, others are in operation, others are in the process of being transformed. This contribution will be focused on the case of the hydroelectric power plant of Widemann cotton mill in San Germano Chisone (TO), where the analysis of the existing structures and a diachronic reading of the archive documents has allowed to reconstruct its history and has provided the basis for some suggestions related to its conservation and enhancement.
publishDate 2017
dc.date.none.fl_str_mv 2017-12-26
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
Revisão de Literatura
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://periodicos.sbu.unicamp.br/ojs/index.php/labore/article/view/8651203
10.20396/labore.v11i4.8651203
url https://periodicos.sbu.unicamp.br/ojs/index.php/labore/article/view/8651203
identifier_str_mv 10.20396/labore.v11i4.8651203
dc.language.iso.fl_str_mv ita
language ita
dc.relation.none.fl_str_mv https://periodicos.sbu.unicamp.br/ojs/index.php/labore/article/view/8651203/17423
dc.rights.driver.fl_str_mv Copyright (c) 2017 Labor e Engenho
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Copyright (c) 2017 Labor e Engenho
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidade Estadual de Campinas
publisher.none.fl_str_mv Universidade Estadual de Campinas
dc.source.none.fl_str_mv Labor e Engenho; Vol. 11 No. 4 (2017): out./dez.; 492-506
Labor e Engenho; Vol. 11 Núm. 4 (2017): out./dez.; 492-506
Labor e Engenho; v. 11 n. 4 (2017): out./dez.; 492-506
2176-8846
reponame:Labor & Engenho (Online)
instname:Universidade Estadual de Campinas (UNICAMP)
instacron:UNICAMP
instname_str Universidade Estadual de Campinas (UNICAMP)
instacron_str UNICAMP
institution UNICAMP
reponame_str Labor & Engenho (Online)
collection Labor & Engenho (Online)
repository.name.fl_str_mv Labor & Engenho (Online) - Universidade Estadual de Campinas (UNICAMP)
repository.mail.fl_str_mv ||argollo@fec.unicamp.br
_version_ 1809730501689212928