Embedded Commissioning©

Detalhes bibliográficos
Autor(a) principal: Akin, Omer
Data de Publicação: 2011
Tipo de documento: Artigo
Idioma: eng
Título da fonte: PARC (Campinas)
Texto Completo: https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634579
Resumo: Embedded Commissioning (ECx) a new digital technology promises to transform capital project delivery (CPD) and its evaluation in the years to come. The primary strategy in ECx is to create an entirely new approach to building evaluation by merging building commissioning methods and information technologies into a new framework. The vision of such broad innovations must include not just new digital tools and techniques but also advances in AEC practices that utilize these innovations. We envision design and engineering practices that are in the service of sound economy, environmental conservation, improved value, greater efficiency, and satisfied occupants. CPD is no longer about competence in delivering just conventional services. Engineers and Architects have to rise to the challenges of our time and insure the best economy in providing the greatest value to stakeholders. Performance needs have to be optimized against first and lifecycle cost of designs. Value must be assessed not just for the bottom line but for other tangible (health, productivity) and intangible (comfort, happiness, recognition) stakeholders benefits. Last but not least, their products must meet the three pillars of the CPD market place: quality, cost, and  schedule.
id UNICAMP-20_092054a00bfd3af127a44ebb2dd26f6f
oai_identifier_str oai:ojs.periodicos.sbu.unicamp.br:article/8634579
network_acronym_str UNICAMP-20
network_name_str PARC (Campinas)
repository_id_str
spelling Embedded Commissioning©Embedded Commissioning. ECx. Information technology. Capital project delivery.Embedded Commissioning (ECx) a new digital technology promises to transform capital project delivery (CPD) and its evaluation in the years to come. The primary strategy in ECx is to create an entirely new approach to building evaluation by merging building commissioning methods and information technologies into a new framework. The vision of such broad innovations must include not just new digital tools and techniques but also advances in AEC practices that utilize these innovations. We envision design and engineering practices that are in the service of sound economy, environmental conservation, improved value, greater efficiency, and satisfied occupants. CPD is no longer about competence in delivering just conventional services. Engineers and Architects have to rise to the challenges of our time and insure the best economy in providing the greatest value to stakeholders. Performance needs have to be optimized against first and lifecycle cost of designs. Value must be assessed not just for the bottom line but for other tangible (health, productivity) and intangible (comfort, happiness, recognition) stakeholders benefits. Last but not least, their products must meet the three pillars of the CPD market place: quality, cost, and  schedule.Universidade Estadual de Campinas2011-10-31info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/863457910.20396/parc.v2i7.8634579PARC Pesquisa em Arquitetura e Construção; Vol. 2 No. 7 (2011): Contemporary architecture and scientific development; 2-11PARC Pesquisa em Arquitetura e Construção; Vol. 2 Núm. 7 (2011): Contemporary architecture and scientific development; 2-11PARC Pesquisa em Arquitetura e Construção; v. 2 n. 7 (2011): Contemporary architecture and scientific development; 2-111980-6809reponame:PARC (Campinas)instname:Universidade Estadual de Campinas (UNICAMP)instacron:UNICAMPenghttps://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634579/2500Copyright (c) 2018 PARC Pesquisa em Arquitetura e Construçãoinfo:eu-repo/semantics/openAccessAkin, Omer2019-06-17T15:24:14Zoai:ojs.periodicos.sbu.unicamp.br:article/8634579Revistahttp://periodicos.sbu.unicamp.br/ojs/index.php/parcPUBhttps://periodicos.sbu.unicamp.br/ojs/index.php/parc/oai||parc@fec.unicamp.br1980-68091980-6809opendoar:2019-06-17T15:24:14PARC (Campinas) - Universidade Estadual de Campinas (UNICAMP)false
dc.title.none.fl_str_mv Embedded Commissioning©
title Embedded Commissioning©
spellingShingle Embedded Commissioning©
Akin, Omer
Embedded Commissioning. ECx. Information technology. Capital project delivery.
title_short Embedded Commissioning©
title_full Embedded Commissioning©
title_fullStr Embedded Commissioning©
title_full_unstemmed Embedded Commissioning©
title_sort Embedded Commissioning©
author Akin, Omer
author_facet Akin, Omer
author_role author
dc.contributor.author.fl_str_mv Akin, Omer
dc.subject.por.fl_str_mv Embedded Commissioning. ECx. Information technology. Capital project delivery.
topic Embedded Commissioning. ECx. Information technology. Capital project delivery.
description Embedded Commissioning (ECx) a new digital technology promises to transform capital project delivery (CPD) and its evaluation in the years to come. The primary strategy in ECx is to create an entirely new approach to building evaluation by merging building commissioning methods and information technologies into a new framework. The vision of such broad innovations must include not just new digital tools and techniques but also advances in AEC practices that utilize these innovations. We envision design and engineering practices that are in the service of sound economy, environmental conservation, improved value, greater efficiency, and satisfied occupants. CPD is no longer about competence in delivering just conventional services. Engineers and Architects have to rise to the challenges of our time and insure the best economy in providing the greatest value to stakeholders. Performance needs have to be optimized against first and lifecycle cost of designs. Value must be assessed not just for the bottom line but for other tangible (health, productivity) and intangible (comfort, happiness, recognition) stakeholders benefits. Last but not least, their products must meet the three pillars of the CPD market place: quality, cost, and  schedule.
publishDate 2011
dc.date.none.fl_str_mv 2011-10-31
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634579
10.20396/parc.v2i7.8634579
url https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634579
identifier_str_mv 10.20396/parc.v2i7.8634579
dc.language.iso.fl_str_mv eng
language eng
dc.relation.none.fl_str_mv https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634579/2500
dc.rights.driver.fl_str_mv Copyright (c) 2018 PARC Pesquisa em Arquitetura e Construção
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Copyright (c) 2018 PARC Pesquisa em Arquitetura e Construção
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidade Estadual de Campinas
publisher.none.fl_str_mv Universidade Estadual de Campinas
dc.source.none.fl_str_mv PARC Pesquisa em Arquitetura e Construção; Vol. 2 No. 7 (2011): Contemporary architecture and scientific development; 2-11
PARC Pesquisa em Arquitetura e Construção; Vol. 2 Núm. 7 (2011): Contemporary architecture and scientific development; 2-11
PARC Pesquisa em Arquitetura e Construção; v. 2 n. 7 (2011): Contemporary architecture and scientific development; 2-11
1980-6809
reponame:PARC (Campinas)
instname:Universidade Estadual de Campinas (UNICAMP)
instacron:UNICAMP
instname_str Universidade Estadual de Campinas (UNICAMP)
instacron_str UNICAMP
institution UNICAMP
reponame_str PARC (Campinas)
collection PARC (Campinas)
repository.name.fl_str_mv PARC (Campinas) - Universidade Estadual de Campinas (UNICAMP)
repository.mail.fl_str_mv ||parc@fec.unicamp.br
_version_ 1809283613821239296