Implementing BIM approach and technology in the management process of FIOCRUZ
Autor(a) principal: | |
---|---|
Data de Publicação: | 2019 |
Outros Autores: | |
Tipo de documento: | Artigo |
Idioma: | por |
Título da fonte: | PARC (Campinas) |
Texto Completo: | https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8653755 |
Resumo: | Fiocruz is a public foundation, with a nationwide presence, which focuses on the production and sharing of knowledge and technologies concerning health. This article explores the adoption of BIM (Building Information Modeling) in the management of spaces, assets and maintenance, project management, and the management of built facilities, relating the experiences of the Department of Architecture and Engineering (DAE) of COGIC-FIOCRUZ. COGIC is responsible for the administration of the physical space of FIOCRUZ as a whole, providing services ranging from basic services to construction work, and civil and equipment maintenance. In constructions, it works in all aspects of the cycle: design, project planning, construction, use and maintenance, renovation and demolition, with the DAE being one of the principal executors of these actions. The methodology employed was bibliographical research and action research. It was possible to confirm in practice some advantages such as a reduction in rework in the project design process, as well as a reduction in time spent on the executive project and an increase in time spent on the draft project, due to adjustments seeking compatibility in all of the disciplines already at this stage. Disseminating the experiences and the paths already taken can help other public entities in implementing a process which involves innovation and a change in culture. |
id |
UNICAMP-20_5ec5ae055b891fe363dc5b87252b408d |
---|---|
oai_identifier_str |
oai:ojs.periodicos.sbu.unicamp.br:article/8653755 |
network_acronym_str |
UNICAMP-20 |
network_name_str |
PARC (Campinas) |
repository_id_str |
|
spelling |
Implementing BIM approach and technology in the management process of FIOCRUZImplementação da abordagem e tecnologia BIM no processo de gestão na FIOCRUZImplementação. BIM. Projeto. Edificação. Administração pública.Implementation. BIM. Design Project. Building. Public Administration.Fiocruz is a public foundation, with a nationwide presence, which focuses on the production and sharing of knowledge and technologies concerning health. This article explores the adoption of BIM (Building Information Modeling) in the management of spaces, assets and maintenance, project management, and the management of built facilities, relating the experiences of the Department of Architecture and Engineering (DAE) of COGIC-FIOCRUZ. COGIC is responsible for the administration of the physical space of FIOCRUZ as a whole, providing services ranging from basic services to construction work, and civil and equipment maintenance. In constructions, it works in all aspects of the cycle: design, project planning, construction, use and maintenance, renovation and demolition, with the DAE being one of the principal executors of these actions. The methodology employed was bibliographical research and action research. It was possible to confirm in practice some advantages such as a reduction in rework in the project design process, as well as a reduction in time spent on the executive project and an increase in time spent on the draft project, due to adjustments seeking compatibility in all of the disciplines already at this stage. Disseminating the experiences and the paths already taken can help other public entities in implementing a process which involves innovation and a change in culture.A FIOCRUZ é uma autarquia fundacional, com presença nacional, que objetiva a produção e o compartilhamento de conhecimentos e tecnologias voltados para a saúde. A adoção do BIM (Building Information Modeling) em gestão de espaços, ativos e manutenção, gestão de processo de projeto e de parque edificado é explorado neste artigo que relata a experiência do Departamento de Arquitetura e Engenharia (DAE), da COGIC-FIOCRUZ. A COGIC é responsável pelo gerenciamento do espaço físico da FIOCRUZ como um todo, prestando desde serviços básicos até executando obras, manutenção civil e de equipamentos. Em edificações atua em todo o seu ciclo de vida: concepção, elaboração de projeto, construção, uso e manutenção, renovação e demolição, sendo o DAE, um dos principais executores dessas ações. O método utilizado foi pesquisa bibliográfica e pesquisa ação. Foi possível a verificação prática de algumas vantagens como a redução do retrabalho no processo de projeto, além da redução no tempo do projeto executivo e uma ampliação do tempo do anteprojeto, em função dos ajustes na compatibilização de todas as disciplinas, já nesta fase. Ao divulgar as experiências e caminhos já trilhados, pode-se auxiliar outros órgãos públicos na implementação de um processo de inovação e de mudança de cultura. Universidade Estadual de Campinas2019-03-27info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionBibliographic and documentary research. Action Research.Pesquisa açãoapplication/pdfapplication/pdfhttps://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/865375510.20396/parc.v10i0.8653755PARC Pesquisa em Arquitetura e Construção; Vol. 10 (2019): Continuous publication; e019014PARC Pesquisa em Arquitetura e Construção; Vol. 10 (2019): Publicação contínua; e019014PARC Pesquisa em Arquitetura e Construção; v. 10 (2019): Publicação contínua; e0190141980-6809reponame:PARC (Campinas)instname:Universidade Estadual de Campinas (UNICAMP)instacron:UNICAMPporhttps://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8653755/19284https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8653755/20759Copyright (c) 2019 PARC Pesquisa em Arquitetura e Construçãoinfo:eu-repo/semantics/openAccessPereira, Silvia Maria Soares de AraujoCorreia, Marcia Castilho2020-03-13T17:53:51Zoai:ojs.periodicos.sbu.unicamp.br:article/8653755Revistahttp://periodicos.sbu.unicamp.br/ojs/index.php/parcPUBhttps://periodicos.sbu.unicamp.br/ojs/index.php/parc/oai||parc@fec.unicamp.br1980-68091980-6809opendoar:2020-03-13T17:53:51PARC (Campinas) - Universidade Estadual de Campinas (UNICAMP)false |
dc.title.none.fl_str_mv |
Implementing BIM approach and technology in the management process of FIOCRUZ Implementação da abordagem e tecnologia BIM no processo de gestão na FIOCRUZ |
title |
Implementing BIM approach and technology in the management process of FIOCRUZ |
spellingShingle |
Implementing BIM approach and technology in the management process of FIOCRUZ Pereira, Silvia Maria Soares de Araujo Implementação. BIM. Projeto. Edificação. Administração pública. Implementation. BIM. Design Project. Building. Public Administration. |
title_short |
Implementing BIM approach and technology in the management process of FIOCRUZ |
title_full |
Implementing BIM approach and technology in the management process of FIOCRUZ |
title_fullStr |
Implementing BIM approach and technology in the management process of FIOCRUZ |
title_full_unstemmed |
Implementing BIM approach and technology in the management process of FIOCRUZ |
title_sort |
Implementing BIM approach and technology in the management process of FIOCRUZ |
author |
Pereira, Silvia Maria Soares de Araujo |
author_facet |
Pereira, Silvia Maria Soares de Araujo Correia, Marcia Castilho |
author_role |
author |
author2 |
Correia, Marcia Castilho |
author2_role |
author |
dc.contributor.author.fl_str_mv |
Pereira, Silvia Maria Soares de Araujo Correia, Marcia Castilho |
dc.subject.por.fl_str_mv |
Implementação. BIM. Projeto. Edificação. Administração pública. Implementation. BIM. Design Project. Building. Public Administration. |
topic |
Implementação. BIM. Projeto. Edificação. Administração pública. Implementation. BIM. Design Project. Building. Public Administration. |
description |
Fiocruz is a public foundation, with a nationwide presence, which focuses on the production and sharing of knowledge and technologies concerning health. This article explores the adoption of BIM (Building Information Modeling) in the management of spaces, assets and maintenance, project management, and the management of built facilities, relating the experiences of the Department of Architecture and Engineering (DAE) of COGIC-FIOCRUZ. COGIC is responsible for the administration of the physical space of FIOCRUZ as a whole, providing services ranging from basic services to construction work, and civil and equipment maintenance. In constructions, it works in all aspects of the cycle: design, project planning, construction, use and maintenance, renovation and demolition, with the DAE being one of the principal executors of these actions. The methodology employed was bibliographical research and action research. It was possible to confirm in practice some advantages such as a reduction in rework in the project design process, as well as a reduction in time spent on the executive project and an increase in time spent on the draft project, due to adjustments seeking compatibility in all of the disciplines already at this stage. Disseminating the experiences and the paths already taken can help other public entities in implementing a process which involves innovation and a change in culture. |
publishDate |
2019 |
dc.date.none.fl_str_mv |
2019-03-27 |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion Bibliographic and documentary research. Action Research. Pesquisa ação |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8653755 10.20396/parc.v10i0.8653755 |
url |
https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8653755 |
identifier_str_mv |
10.20396/parc.v10i0.8653755 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.relation.none.fl_str_mv |
https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8653755/19284 https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8653755/20759 |
dc.rights.driver.fl_str_mv |
Copyright (c) 2019 PARC Pesquisa em Arquitetura e Construção info:eu-repo/semantics/openAccess |
rights_invalid_str_mv |
Copyright (c) 2019 PARC Pesquisa em Arquitetura e Construção |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf application/pdf |
dc.publisher.none.fl_str_mv |
Universidade Estadual de Campinas |
publisher.none.fl_str_mv |
Universidade Estadual de Campinas |
dc.source.none.fl_str_mv |
PARC Pesquisa em Arquitetura e Construção; Vol. 10 (2019): Continuous publication; e019014 PARC Pesquisa em Arquitetura e Construção; Vol. 10 (2019): Publicação contínua; e019014 PARC Pesquisa em Arquitetura e Construção; v. 10 (2019): Publicação contínua; e019014 1980-6809 reponame:PARC (Campinas) instname:Universidade Estadual de Campinas (UNICAMP) instacron:UNICAMP |
instname_str |
Universidade Estadual de Campinas (UNICAMP) |
instacron_str |
UNICAMP |
institution |
UNICAMP |
reponame_str |
PARC (Campinas) |
collection |
PARC (Campinas) |
repository.name.fl_str_mv |
PARC (Campinas) - Universidade Estadual de Campinas (UNICAMP) |
repository.mail.fl_str_mv |
||parc@fec.unicamp.br |
_version_ |
1809283614987255808 |