Implementing BIM approach and technology in the management process of FIOCRUZ

Detalhes bibliográficos
Autor(a) principal: Pereira, Silvia Maria Soares de Araujo
Data de Publicação: 2019
Outros Autores: Correia, Marcia Castilho
Tipo de documento: Artigo
Idioma: por
Título da fonte: PARC (Campinas)
Texto Completo: https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8653755
Resumo: Fiocruz is a public foundation, with a nationwide presence, which focuses on the production and sharing of knowledge and technologies concerning health. This article explores the adoption of BIM (Building Information Modeling) in the management of spaces, assets and maintenance, project management, and the management of built facilities, relating the experiences of the Department of Architecture and Engineering (DAE) of COGIC-FIOCRUZ. COGIC is responsible for the administration of the physical space of FIOCRUZ as a whole, providing services ranging from basic services to construction work, and civil and equipment maintenance. In constructions, it works in all aspects of the cycle: design, project planning, construction, use and maintenance, renovation and demolition, with the DAE being one of the principal executors of these actions. The methodology employed was bibliographical research and action research. It was possible to confirm in practice some advantages such as a reduction in rework in the project design process, as well as a reduction in time spent on the executive project and an increase in time spent on the draft project, due to adjustments seeking compatibility in all of the disciplines already at this stage. Disseminating the experiences and the paths already taken can help other public entities in implementing a process which involves innovation and a change in culture.
id UNICAMP-20_5ec5ae055b891fe363dc5b87252b408d
oai_identifier_str oai:ojs.periodicos.sbu.unicamp.br:article/8653755
network_acronym_str UNICAMP-20
network_name_str PARC (Campinas)
repository_id_str
spelling Implementing BIM approach and technology in the management process of FIOCRUZImplementação da abordagem e tecnologia BIM no processo de gestão na FIOCRUZImplementação. BIM. Projeto. Edificação. Administração pública.Implementation. BIM. Design Project. Building. Public Administration.Fiocruz is a public foundation, with a nationwide presence, which focuses on the production and sharing of knowledge and technologies concerning health. This article explores the adoption of BIM (Building Information Modeling) in the management of spaces, assets and maintenance, project management, and the management of built facilities, relating the experiences of the Department of Architecture and Engineering (DAE) of COGIC-FIOCRUZ. COGIC is responsible for the administration of the physical space of FIOCRUZ as a whole, providing services ranging from basic services to construction work, and civil and equipment maintenance. In constructions, it works in all aspects of the cycle: design, project planning, construction, use and maintenance, renovation and demolition, with the DAE being one of the principal executors of these actions. The methodology employed was bibliographical research and action research. It was possible to confirm in practice some advantages such as a reduction in rework in the project design process, as well as a reduction in time spent on the executive project and an increase in time spent on the draft project, due to adjustments seeking compatibility in all of the disciplines already at this stage. Disseminating the experiences and the paths already taken can help other public entities in implementing a process which involves innovation and a change in culture.A FIOCRUZ é uma autarquia fundacional, com presença nacional, que objetiva a produção e o compartilhamento de conhecimentos e tecnologias voltados para a saúde. A adoção do BIM (Building Information Modeling) em gestão de espaços, ativos e manutenção, gestão de processo de projeto e de parque edificado é explorado neste artigo que relata a experiência do Departamento de Arquitetura e Engenharia (DAE), da COGIC-FIOCRUZ. A COGIC é responsável pelo gerenciamento do espaço físico da FIOCRUZ como um todo, prestando desde serviços básicos até executando obras, manutenção civil e de equipamentos. Em edificações atua em todo o seu ciclo de vida: concepção, elaboração de projeto, construção, uso e manutenção, renovação e demolição, sendo o DAE, um dos principais executores dessas ações. O método utilizado foi pesquisa bibliográfica e pesquisa ação. Foi possível a verificação prática de algumas vantagens como a redução do retrabalho no processo de projeto, além da redução no tempo do projeto executivo e uma ampliação do tempo do anteprojeto, em função dos ajustes na compatibilização de todas as disciplinas, já nesta fase. Ao divulgar as experiências e caminhos já trilhados, pode-se auxiliar outros órgãos públicos na implementação de um processo de inovação e de mudança de cultura. Universidade Estadual de Campinas2019-03-27info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionBibliographic and documentary research. Action Research.Pesquisa açãoapplication/pdfapplication/pdfhttps://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/865375510.20396/parc.v10i0.8653755PARC Pesquisa em Arquitetura e Construção; Vol. 10 (2019): Continuous publication; e019014PARC Pesquisa em Arquitetura e Construção; Vol. 10 (2019): Publicação contínua; e019014PARC Pesquisa em Arquitetura e Construção; v. 10 (2019): Publicação contínua; e0190141980-6809reponame:PARC (Campinas)instname:Universidade Estadual de Campinas (UNICAMP)instacron:UNICAMPporhttps://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8653755/19284https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8653755/20759Copyright (c) 2019 PARC Pesquisa em Arquitetura e Construçãoinfo:eu-repo/semantics/openAccessPereira, Silvia Maria Soares de AraujoCorreia, Marcia Castilho2020-03-13T17:53:51Zoai:ojs.periodicos.sbu.unicamp.br:article/8653755Revistahttp://periodicos.sbu.unicamp.br/ojs/index.php/parcPUBhttps://periodicos.sbu.unicamp.br/ojs/index.php/parc/oai||parc@fec.unicamp.br1980-68091980-6809opendoar:2020-03-13T17:53:51PARC (Campinas) - Universidade Estadual de Campinas (UNICAMP)false
dc.title.none.fl_str_mv Implementing BIM approach and technology in the management process of FIOCRUZ
Implementação da abordagem e tecnologia BIM no processo de gestão na FIOCRUZ
title Implementing BIM approach and technology in the management process of FIOCRUZ
spellingShingle Implementing BIM approach and technology in the management process of FIOCRUZ
Pereira, Silvia Maria Soares de Araujo
Implementação. BIM. Projeto. Edificação. Administração pública.
Implementation. BIM. Design Project. Building. Public Administration.
title_short Implementing BIM approach and technology in the management process of FIOCRUZ
title_full Implementing BIM approach and technology in the management process of FIOCRUZ
title_fullStr Implementing BIM approach and technology in the management process of FIOCRUZ
title_full_unstemmed Implementing BIM approach and technology in the management process of FIOCRUZ
title_sort Implementing BIM approach and technology in the management process of FIOCRUZ
author Pereira, Silvia Maria Soares de Araujo
author_facet Pereira, Silvia Maria Soares de Araujo
Correia, Marcia Castilho
author_role author
author2 Correia, Marcia Castilho
author2_role author
dc.contributor.author.fl_str_mv Pereira, Silvia Maria Soares de Araujo
Correia, Marcia Castilho
dc.subject.por.fl_str_mv Implementação. BIM. Projeto. Edificação. Administração pública.
Implementation. BIM. Design Project. Building. Public Administration.
topic Implementação. BIM. Projeto. Edificação. Administração pública.
Implementation. BIM. Design Project. Building. Public Administration.
description Fiocruz is a public foundation, with a nationwide presence, which focuses on the production and sharing of knowledge and technologies concerning health. This article explores the adoption of BIM (Building Information Modeling) in the management of spaces, assets and maintenance, project management, and the management of built facilities, relating the experiences of the Department of Architecture and Engineering (DAE) of COGIC-FIOCRUZ. COGIC is responsible for the administration of the physical space of FIOCRUZ as a whole, providing services ranging from basic services to construction work, and civil and equipment maintenance. In constructions, it works in all aspects of the cycle: design, project planning, construction, use and maintenance, renovation and demolition, with the DAE being one of the principal executors of these actions. The methodology employed was bibliographical research and action research. It was possible to confirm in practice some advantages such as a reduction in rework in the project design process, as well as a reduction in time spent on the executive project and an increase in time spent on the draft project, due to adjustments seeking compatibility in all of the disciplines already at this stage. Disseminating the experiences and the paths already taken can help other public entities in implementing a process which involves innovation and a change in culture.
publishDate 2019
dc.date.none.fl_str_mv 2019-03-27
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
Bibliographic and documentary research. Action Research.
Pesquisa ação
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8653755
10.20396/parc.v10i0.8653755
url https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8653755
identifier_str_mv 10.20396/parc.v10i0.8653755
dc.language.iso.fl_str_mv por
language por
dc.relation.none.fl_str_mv https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8653755/19284
https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8653755/20759
dc.rights.driver.fl_str_mv Copyright (c) 2019 PARC Pesquisa em Arquitetura e Construção
info:eu-repo/semantics/openAccess
rights_invalid_str_mv Copyright (c) 2019 PARC Pesquisa em Arquitetura e Construção
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
application/pdf
dc.publisher.none.fl_str_mv Universidade Estadual de Campinas
publisher.none.fl_str_mv Universidade Estadual de Campinas
dc.source.none.fl_str_mv PARC Pesquisa em Arquitetura e Construção; Vol. 10 (2019): Continuous publication; e019014
PARC Pesquisa em Arquitetura e Construção; Vol. 10 (2019): Publicação contínua; e019014
PARC Pesquisa em Arquitetura e Construção; v. 10 (2019): Publicação contínua; e019014
1980-6809
reponame:PARC (Campinas)
instname:Universidade Estadual de Campinas (UNICAMP)
instacron:UNICAMP
instname_str Universidade Estadual de Campinas (UNICAMP)
instacron_str UNICAMP
institution UNICAMP
reponame_str PARC (Campinas)
collection PARC (Campinas)
repository.name.fl_str_mv PARC (Campinas) - Universidade Estadual de Campinas (UNICAMP)
repository.mail.fl_str_mv ||parc@fec.unicamp.br
_version_ 1809283614987255808